This statement of work outlines asbestos containing material and lead based paint surveys for facilities located within the Carson and Gila National Forests. The contractor will conduct ACM and LBP surveys at nine structures within the Canjilon Lakes Campground in Carson National Forest and one structure at the Kingston Day Use Toilet in Gila National Forest. The contractor must mobilize to each site, perform inspections and sampling by an EPA accredited inspector, analyze samples at an accredited laboratory, and document all findings in separate survey reports for each national forest due by December 31, 2023. The pay unit is lump sum to cover all costs including mobilization, labor, analysis, and reporting. The point of contact for questions is Jennifer Sublett at the provided email and phone.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
ASBESTOS CONTAINING MATERIAL (ACM) AND LEAD BASED PAINT (LBP) SURVEYS
CANJILON LAKES CAMPGROUND – CARSON NATIONAL FOREST
KINGSTON TOILET – GILA NATIONAL FOREST
MAY 31, 2023
SCOPE OF WORK
INTRODUCTION
The purpose of this project is to complete a survey to sample and analyze for Asbestos
Containing Material (ACM) and Lead Based Paint (LBP) for the facilities listed below:
Facilities listed are planned for demolition, however care should be taken during the sampling process to avoid damaging and exposing any hazardous materials. Contractor shall repair all sampling holes to match existing material and background until the facilities can be demolished and to prevent any contamination to surrounding materials.
The asbestos and lead-based paint survey and inspection shall be conducted by an EPA accredited inspector. The inspector shall:
• Determine the presence, type, location, and quantities of samples to be taken for any asbestos containing material (ACM) and Lead Based Paint (LBP).
• Take the number of representative samples for each facility.
• Analyze samples at an EPA/State accredited laboratory
• Define the EPA category of that material (friable ACM or Non-Friable Category I or Category II ACM) found.
• Document all findings, photos, laboratory analysis in a report as detailed below.
SITE DESCRIPTION OF WORK:
Below is a summary of the sites to be surveyed for both Lead Based Paint and Asbestos surveys.
Photos are attached in the Appendix for each site.
Carson National Forest Asbestos and Lead Based Paint Survey: Lump Sum
Location Facility Year constructed
NRM ID
Canjilon Lakes
Campground
GPS Coordinates:
36.564025, -106.327506
Romtech Toilet - Lower CG
Toilet
2002? 3020175
Pit Toilet - Lower CG 1989 3020176
Romtech Toilet – Lower CG 2003? n/a
Pit Toilet – Middle CG 1962 3020177
Pit Toilet – Middle CG estimated n/a
Romtech Toilet – Middle CG 2002 3020180
Romtech Toilet – Middle CG 2002 3020181
Romtech Toilet - Middle –
CG
2003 3020182
Romtech - PG Toilet - Upper
CG
2003 3020183
Carson National Forest total # of structures to be surveyed 9
Gila National Forest Asbestos and Lead Based Paint Survey: Lump Sum
Location Facility Year constructed
NRM ID
Kingston Day Use Toilet
GPS Coordinates:
32.918319, -107.700803
3621401R
Carson National Forest total # of structures to be surveyed 1
TASKS
The Contractor shall survey all facilities listed for any suspected asbestos containing materials
(ACMs) and Lead Based Paint (LBP). The Contractor will determine the number of samples to perform a complete analysis of ACM and LBP. Unless otherwise specified, the Contractor shall be responsible for all materials, labor, equipment, supervision, and incidentals required to perform the Requirements/Tasks and Specifications associated with this Statement of Work.
ACM/LBP Survey
Task 1: Asbestos Survey Services
The Contractor shall perform the following tasks:
1) The Contractor shall mobilize to the Site to perform the survey.
2) The survey shall be performed by a professional accredited as an asbestos inspector in accordance with the Asbestos Hazard Emergency Response Act (AHERA) regulations, Title 40 Code of Federal Regulations (CFR), Part 763, Subpart E, Appendix C.
3) The purpose of the survey shall be to locate, inspect, assess, and sample all suspect ACM materials where required. Identify all ACM as to type, condition, percent of asbestos content, and quantity. The inspection shall be performed in accordance with the requirements of 40 CFR Part 61, Subpart M, National Emission Standards for Hazardous
Air Pollutants (NESHAP) and following the AHERA sampling protocol.
4) Standard Survey Components
a) Review existing facility plan in Appendix A and inspection report in Appendix B for reference to asbestos potentially used in construction and recent inspection.
b) Physically inspect and list all suspect materials throughout the designated facility and/or facility components.
c) Sample all suspect materials and submit the bulk samples to an accredited third-party laboratory for asbestos analysis by Polarized Light Microscopy (PLM). Samples will be analyzed by layer. Layers will be determined by the laboratory. Do not assume any materials to be asbestos containing without approval from the COR.
i) Perform Point Count Analysis for all friable samples determined to be ≤5% asbestos-containing by PLM.
ii) For all non-friable organically bound materials (i.e. vinyl asbestos tile, etc.) that are determined PLM to be ≤1% asbestos-containing without approval from the
COR.
iii) All collected samples must be analyzed. Analysis for a homogeneous may not be stopped at the first positive unless specifically allowed by the COR. Report the number of samples in the survey report.
iv) The contractor shall determine the number and location of samples to be collected, up to 12 total samples for the 10 sites.
Task 2: Lead-Based Paint Survey Services
The Contractors shall survey designated facilities and/or facility components for lead-based paint. The tasks expected for the Contractor are listed below.
• The Contractor shall mobilize to the Site to perform the survey
• The survey shall be performed by an Environmental Protection Agency (EPA) accredited inspector and/or risk assessor for lead-based paint inspection in accordance with EPA regulations, Lead: requirements for Lead-based Paint
Activities Final Rule, Title 40, Part 745, Vol. 61 No. 169, pg. 45813, Section 227, subpart L, of the Code of Federal Register.
• The objective of the survey shall be to inventory, locate, and assess the existence of lead-based paint throughout the designated facility and/or facility components, condition, and lead content.
• XRF testing is not required.
• As a minimum, the following components shall be included in the performance of the survey:
o Review existing facility on a surface-by-surface plan and record all painted for reference to lead paint used on surface treatment.
o Throughout the designated facility and/or facility components, physically inspect materials for lead paint.
o Sample/analyze by TCLP for LBP o The locations of Lead-based paint within the building.
o The name of the Inspector/Risk Assessor performing the inspections and copies of current certificates.
o Classification of all surfaces into positive or negative (but not inconclusive) categories paint chip laboratory analysis.
o Specific information on the laboratory methodologies.
o Results of laboratory analysis including chain of custody.
• The contractor shall determine the number and location of samples to be collected, up to 12 total samples for the 10 sites.
ACM/LBP Survey Report
The Contractor shall submit two (2) separate, individual reports: Carson NF ACM and LBP
Survey Report and Gila NF ACM and LBP Survey Report. Contractor shall perform a Survey
Report and complete the following requirements:
1) Survey Report Content Requirements
a) The survey report must include the following information where the COR has allowed otherwise.
b) Contract shall be submitted both electronically to point of contacts listed below as well as 2 hard copies delivered to each point of contact.
c) Report shall be delivered within 30 days from the issued notice to proceed.
i) Front Cover: Project or Location Name, Address, Coordinates, Consultant’s contract number, and the project number.
ii) Executive Summary: List ACMs, NESHAP categories, ACM quantities, LBP quantities, date of inspection, inspector(s) name, and reference to the date of the
Consultant proposal.
iii) Body of Report: Provide a general description of the project site and structure including the type of construction. Include photos of every structure and any other photos that help depict the type of structure and sample locations if specified by the COR.
iv) Body of Report: Provide the following material information.
(a) Methodologies used for performing the survey and collecting samples.
(b) A list of the suspect ACMs/LBP in either tabular or list form.
(c) A description of the various ACMs/LBP and their location on/in the building or at the site.
(d) An evaluation of the accessibility of the ACMs/LBP, both in terms of the space containing it, and the accessibility of the ACM/LBP within that space.
(e) A description of the condition of the ACMs and its classification as
Regulated ACM (RACM), Category I non-friable ACM, or Category II non-friable ACM as required by the asbestos NESHAP.
(f) A description of the condition of the ACM/LBP at each location. For most applications, such as surfacing materials, boilers, ductwork, wall systems, etc., this estimate must be given in terms of square feet. For thermal system insulation on piping, this estimate must be given in terms of linear feet. The number and size of pipe fittings (valves, elbows, joints, etc.)
shall also be provided.
v) Drawings: Provide drawings as listed. Drawings do not need to be to scale.
(a) A site drawing that depicts the site, approximate location of structures m and pertinent features.
(b) A drawing depicting the locations where samples were collected. Provide one drawing for each structure.
(c) A drawing depicting the types and locations of all ACMs. Provide a drawing for each structure. Use patterns for ACM depiction that will remain distinct and clear in black and white copies.
vi) Supporting Documents:
(a) Copies of the laboratory sample analysis report for every sample collected.
(b) Copies of the Chain of Custody sheet for all samples collected.
(c) Copies of inspectors AHERA certifications current at the time of the survey.
(d) Color aerial maps of the project site (property).
(e) Color photographs of sample locations and materials upon request.
(f) Copies of laboratory accreditation certificates.
vii) Contractor is required to comply with NESHAP of the Clean Air Act as directed by New Mexico Environment Department. Asbestos (nm.gov) Provide a
NESHAP information summary page that includes the property owner information, laboratory information, number of samples collected, date inspections was performed, date samples were analyzed by laboratory, AHERA
Asbestos Building Inspector information including name, training provider, https://www.env.nm.gov/asbestos/ certification number and expiration date. The summary pages will include a table that identifies all ACMs, ACM NESHAP categories, quantities, and locations.
RELATED DOCUMENTS AND REFERENCES
Related documents and references are not limited to the following list.
▪ NESHAP (40 CFR Parts 61 and 63, Subpart M) – regulates the removal, demolition, and/or renovation of buildings and structures with ACM. Also provides specific standards for inactive asbestos waste disposal facilities, and requirements for covering asbestos-containing waste material, engineering controls to limit site access, and signage.
DELIVERABLES AND SCHEDULE
The Contractor shall contact the COR 7 calendar days prior to commencing site visits and tasks included in this Statement of Work. All tasks shall be completed within the period of performance and comply with timelines as shown in the table below.
Carson National Forest
Site Final date deliverables due to COR
Canjilon Lakes
Campground
12/31/2023
Gila National Forest
Site Final date deliverables due to COR
Kingston 12/31/2023
SITE SPECIFICS
• Water and electricity are not available at any site.
• Wildlife and Seasonal/Weather restrictions may apply to all sites and will be considered when issuing the Notice to Proceed.
• Sites are open for the season June – August.
• Canjilon Lakes Campground is situated at 10,000 feet elevation.
• Kingston Campground is 6,200 feet elevation.
• Tasks shall begin within 5 days of the issuance of the notice to proceed.
Pay Unit
The Pay unit included in the Schedule of Items is Lump Sum. This pay unit shall include all costs required to properly determine and categorized the presence of asbestos containing material and lead based paint within the facilities listed, including but not limited to mobilization to and from all sites, labor, laboratory analysis, and finally report documenting inspection findings.
POINT OF CONTACTS
The Contractor shall contact the Project Inspector/Government Technical Monitor prior to commencing the project and to schedule/coordinate the field work.
The Contractor shall submit and/or coordinate all deliverables to the following Government representatives:
Jennifer Sublett, Forest Project Inspector/Government Technical Monitor
Jennifer.sublett@usda.gov
575 779-1895
505 753-7331
Hailey Stock, COR
Hailey.stock@usda.gov
333 Broadway SE
Albuquerque, NM 87102 mailto:Jennifer.sublett@usda.gov
File details come from the government source that posted it. Updated .