CONSTRUCTION RFQ SOLICITATION NO: 127EAX22Q0061
PROJECT NAME: ROOF REPAIRS FORESTWIDE
UNIT: APACHE-SITGREAVES NATIONAL FORESTS
P a g e | 1
1. Introduction. The USDA Forest Service, Apache-Sitgreaves National Forests, has a requirement to perform re-roofing of 4 buildings and roofing repairs on 7 buildings. The buildings are located at Lakeside Ranger Station, Stray Horse Admin Area, Stray Horse Campground, Black Mesa Ranger Station (BMRS), and Alpine Admin Area.
The project is located on the Lakeside, Clifton, Black Mesa, and Alpine Ranger Districts.
2. Type of Award. As a result of this solicitation, the Government anticipates awarding a Firm Fixed-Price Construction Contract using FAR 15 Request For Quotation (RFQ) Best Value format. This is a 100% Small Business Set Aside to NAICS code 238160 $16.5 Million is the maximum size standard to qualify as small business. PSC code
Z2AZ.
To be eligible for award of a Federal contract, potential vendors, at time of award, are required to have an active registration in the System for Award Management (SAM) at https://sam.gov/content/home .
3. Basis for Award – See Section M (last section of this document).
4. How to submit your offer. Submit RFQ pages 3 through 6 as your business (schedule of items) proposal. In a separate document, submit all the information requested in Section M as your technical proposal.
Deadline for submission of offers shall be September 23, 2022, NOON (Pacific Daylight Time – matches time zone in advertisement in SAM).
Responses to the RFQ shall be sent to the Contracting Specialist by email and should contain the Solicitation Number in the subject line for the email. Email: warren.abbott@usda.gov and daniel.franco@usda.gov .
5. Formal Site Visit has been scheduled for Wednesday, September 21, 2022, 10:00 a.m., local. Meeting will begin at the Lakeside Ranger Station, 2022 West White Mountain Blvd., Lakeside, AZ 85929, Phone: 928-368- 2100.
Contracting Officer’s Representative (COR):
Pamela Jaramillo, Civil Engineer pamela.jaramillo@usda.gov
Any questions concerning the RFQ, or procurement procedures shall be sent in writing to Contract Specialist (CS):
daniel.franco@usda.gov or warren.abbott@usda.gov .
https://sam.gov/content/home mailto:warren.abbott@usda.gov mailto:daniel.franco@usda.gov mailto:pamela.jaramillo@usda.gov mailto:daniel.franco@usda.gov mailto:warren.abbott@usda.gov
UNIT: APACHE-SITGREAVES NATIONAL FORESTS
P a g e | 2
Table of Contents
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
TO FACILITATE COMMUNICATIONS BETWEEN CONTRACTING OFFICER AND CONTRACTOR, PLEASE PROVIDE THE
FOLLOWING:
C.1.1 SCOPE OF CONTRACT
C.1.2 MAGNITUDE OF CONSTRUCTION PROJECT
C.2 PROJECT LOCATON
C.3 GENERAL SPECIFICATIONS ......................................................................................... Error! Bookmark not defined.
C.4 TECHNICAL SPECIFICATIONS
Title .................................................................................................................................................. Error! Bookmark not defined.
Aggregate ......................................................................................................................................... Error! Bookmark not defined.
C.5 CLAUSES
SECTION D--PACKAGING AND MARKING
D-1 PACKING AND MARKING
D-2 PROJECT LABELING FOR OFFICIAL COORESPONDENCE
SECTION E--INSPECTION AND ACCEPTANCE
E.1 CLAUSES
SECTION F--DELIVERIES OR PERFORMANCE
F.1 CLAUSES
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 CLAUSES
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H.1 CLAUSES
PART II--CONTRACT CLAUSES / SECTION I--CONTRACT CLAUSES
I.1 CLAUSES
PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J--LIST OF ATTACHMENTS (INCORPORATED AS ELECTRONIC DOCUMENTS)
PART IV--REPRESENTATIONS AND INSTRUCTIONS
SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND
OTHER STATEMENTS OF OFFERORS OR RESPONDENTS
K.1 PROVISIONS
SECTION L--INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS
L.1 PROVISIONS
SECTION M--EVALUATION FACTORS FOR AWARD
UNIT: APACHE-SITGREAVES NATIONAL FORESTS
P a g e | 3
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Computer Generated Prescribed by GSA
FAR (48 CFR) 53.236-1I
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
127EAX22Q0061
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFQ)
3. DATE ISSUED
09/13/2022
PAGE OF PAGES
3 31
IMPORTANT — The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
1066582
6. PROJECT NO.
7. ISSUED BY CODE 128371 8. ADDRESS OFFER TO
USFS SOUTHWESTERN REGION PPS FPO CSA #7
333 BROADWAY SE
ALBUQUERQUE, NM 87102
USFS SOUTHWESTERN REGION PPS FPO CSA #7
DANIEL.FRANCO@USDA.GOV
9. FOR INFORMATION
CALL:
B. NAME
Daniel Franco
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) email: daniel.franco@usda.gov
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
The USDA Forest Service, Apache-Sitgreaves National Forests, has a requirement to perform re-roofing of 4 buildings and roofing repairs on 7 buildings. The buildings are located at Lakeside Ranger Station, Stray Horse Admin Area, Stray Horse Campground, Black Mesa Ranger Station (BMRS), and Alpine Admin Area. The project is located on the Lakeside, Clifton, Black Mesa, and Alpine Ranger Districts.
MAGNITUDE OF PROJECT: Between $25,000 and $150,000. This solicitation is a 100 percent Total Small Business Set-Aside.
NAICS: 238160 $16.5 Million PSC: Z2AZ Payment and Performance Bonds are required (after award).
Davis-Bacon Wage Determination applies.
11. The Contractor shall begin performance within 10 calendar days and complete it within time specified calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See Section F.)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12B.)
YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and 1 copies to perform the work required are due at the place specified in Item 8 by NOON (hour) local time SEPTEMBER 23, 2022. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
mailto:daniel.franco@USDA.GOV
PROJECT NAME: ASNF ROOF REPAIRS FORESTWIDE
P a g e | 4
Computer Generated STANDARD FORM 1442 BACK (REV. 4-85)
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
The offeror acknowledges receipt of amendments to the solicitation — give number and date of each
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
A. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
B. SUBMIT INVOICES TO ADDRESS SHOWN
IN
ITEM
B. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304I( ) 41 U.S.C. 253I( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
SAME AS 7 Electronic Funds Transfer via Invoice Processing Platform at www.ipp.gov
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO
SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE
30C. DATE
31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
P a g e | 5
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
BASE
LINE
ITEMS#
BLDG.
WORK ITEM# AND/OR
DESCRIPTION OF SERVICES
PAY
UNIT
EST.
QTY.
UNIT
PRICE*
EXTENDED
AMOUNT*
1001 MOBILIZATION (INCLUDES ALL
LOCATIONS) AND BONDING
LUMP
SUM 1
1002 04-002, 12-31
REPAIR/REPLACE ROOF - LAKESIDE
RANGER STATION OFFICE (BLDGS. 04-002
& 12-31)
LUMP
SUM 1
1003 03-110, 03-113
REPLACE ROOF – STRAY HORSE-ADMIN
BUILDINGS (BLDGS. 03-110 & 03-113)
LUMP
SUM 1
1004 12-2C REPAIR ROOF LEAK – LAKESIDE RS ANNEX
- TIMBER OFFICE (BLDG. 12-2C)
LUMP
SUM 1
1005 12-29 REPAIR ROOF LEAKS-BLACK MESA
RANGER STATION OFFICE (BLDG. 12-29)
LUMP
SUM 1
TOTAL OF BASE LINE ITEMS
* OFFER PRICING INCLUDES ALL FEDERAL, STATE, LOCAL TAXES, PERMITS, LICENSES, FEES, ETC. TO COMPLETE THE WORK IN STRICT
ACCORDANCE WITH ALL TERMS AND CONDITIONS CONTAINED HEREIN.
OPTION
LINE
ITEMS#
BLDG.
WORK ITEM# AND/OR
DESCRIPTION OF SERVICES
PAY
UNIT
EST.
QTY.
UNIT
PRICE*
EXTENDED
AMOUNT*
2001 13-88W REPAIR LEAKING SKYLIGHTS – LAKESIDE RS
METAL WAREHOUSE (BLDG. 13-88W)
LUMP
SUM 1
2002 11-84 REPAIR ROOF LEAKS – BMRS 6 BAY SHOP
(BLDG. 13-84)
LUMP
SUM 1
2003 11-54 REPAIR ROOF LEAK – BMRS FITNESS CENTER
(BLDG. 11-54)
LUMP
SUM 1
2004 12-32 REPAIR ROOF – BMRS MODULAR CREW
QUARTERS “B” (BLDG. 12-32)
LUMP
SUM 1
2005 R310 REPAIR ROOF – STRAYHORSE CAMPGROUND
WEST TOILET (BLDG. R310)
LUMP
SUM 1
2006 01-032E
REPLACE ROOF – ALPINE ADMIN SITE 1
RESIDENCE (BLDG. 01-032E)
LUMP
SUM 1
2007 REPLACE OR INSTALL NEW GUTTERS &
DOWNSPOUTS
LINEAR
FOOT 1
P a g e | 6
REPAIR ROOF LEAK – 1 PENETRATION EACH 1
RESEAL SKYLIGHT EACH 1
PATCH METAL ROOF PANEL, 3 FEET WIDE LINEAR
FOOT 1
ADDITIONAL MILEAGE TO SITES (FOR ITEMS
2007 – 2010) MILE
* OFFER PRICING INCLUDES ALL FEDERAL, STATE, LOCAL TAXES, PERMITS, LICENSES, FEES, ETC. TO COMPLETE THE WORK IN STRICT
ACCORDANCE WITH ALL TERMS AND CONDITIONS CONTAINED HEREIN.
TO FACILITATE COMMUNICATIONS BETWEEN CONTRACTING OFFICER AND CONTRACTOR, PLEASE PROVIDE THE
FOLLOWING CERTIFICATION OF OFFER PRICING AND SUBMISSIONS FOR THIS SOLICITATION:
UNIQUE ENTITY IDENTIFIER (UEI) # ______________
CONTRACTOR COMPANY NAME: _____________________ WARRANTY LENGTH/PERIOD: ________________________
AUTHORIZED TO SIGN (NAME & TITLE): ________________________
BUSINESS EMAIL: _____________________
SIGNATURE:_______________________ DATE:____________ PHONE: ____________________________
P a g e | 7
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1.1 SCOPE OF CONTRACT
The USDA Forest Service, Apache-Sitgreaves National Forests, has a requirement to perform roofing replacement on 4 buildings and roofing repairs on 7 buildings. The buildings are located at Lakeside Ranger Station, Stray Horse Admin Area, Stray Horse Campground, Black Mesa Ranger Station, and Alpine Admin Area. The project is located on the Lakeside, Clifton, Black Mesa, and Alpine Ranger Districts.
Reference Section J for Exhibits:
Exhibit 1 – U.S. Department of Labor, Wage Determination Exhibit 2 – Bio-preferred Requirements Exhibit 3 – Project Vicinity Map Exhibit 4 – Map and Pictures, Lakeside Ranger Station Exhibit 5 – Map and Pictures, Stray Horse Admin Area Exhibit 6 – Map and Pictures, Stray Horse Campground Exhibit 7 – Map and Pictures, Black Mesa Ranger Station Exhibit 8 – Map and Pictures, Alpine Admin Area
C1.2 MAGNITUDE OF CONSTRUCTION PROJECT
Magnitude of Construction Project: Between $25,000 and $150,000.
C2.1 PROJECT LOCATON, SITE VISIT, & PERIOD OF PERFORMANCE
The project is located at the following sites:
Lakeside Ranger Station Admin Site (LAT: 34.158427° / LONG: -109.977180°) 2022 W. White Mountain Blvd, Lakeside, AZ 85929
Stray Horse Admin Area, (LAT: 35.541135° / LONG: -109.317500°) approximately 33 miles south of Alpine, AZ via US-191 at mile marker 220. The admin site is on the west side of the highway.
Stray Horse Campground West, (LAT: 33.550090° / LONG: -109.318488°) approximately 32 miles south of Alpine, AZ via US-191. The campground is on the west side of the highway.
Black Mesa Ranger Station Admin Site (LAT: 34.393210° / LONG: -110.557356) 2748 East AZ-260, Overgaard, AZ 85933.
Alpine Ranger District Admin Site #1 (LAT 33.847337° / LONG: -109.135989°) From the intersection of US-180 & US-191 In Alpine, AZ, head east on US-180 for 0.6 miles. Turn left on county road N2058 for about 0.1 miles
C2.2 Formal Site Visit has been scheduled for Wednesday, September 21, 2022, 10:00 a.m., local. Meeting will begin at the Lakeside Ranger Station, 2022 West White Mountain Blvd., Lakeside, AZ 85929, Ranger Station Phone: 1-928-368-2100.
C2.3 Period of Performance: Monday through Friday, 0700 to 1800, within 90 calendar days from issuance of the Notice To Proceed. No work shall be permitted to be performed on weekends.
P a g e | 8
C3 & C4 STATEMENT OF WORK & SPECIFICATIONS
The Contractor shall provide all labor, lodging, materials, tools, equipment, services, testing, supervision, and incidentals necessary to perform roofing replacements and repairs described herein.
When the term “remove” or “demo” is used, all debris to be hauled offsite and properly disposed of by local, state, and federal regulations, off USFS lands. Provide final cleaning prior to government acceptance.
C3.1 Base line item 1001 MOBILIZATION (Includes all locations)
Mobilization, one-time fee. This fee covers all locations and will only be paid once. The Government will schedule the work such that work can be concurrently or consecutively completed at all facility locations. Unit of measure is Lump Sum (LS).
C3.2 Base line item 1002 REPAIR/REPLACE ROOF-LAKESIDE RS OFFICE (04-002, 12-31)
LAKESIDE RANGER STATION OFFICE BUILDING (04-002 & 12-31)
SECTION ID#
YEAR
BUILT TYPE BLDG SF ROOF TYPE
ROOF
PITCH
APPROX
ROOF AREA SCOPE
East 12-31 1964 Site Built 1,342 Membrane 1/12 REPAIR Middle 1982 Modular 850 Metal West 04-002 1992 Modular 1,960 Metal 2.5/12 2560 SF REPLACE
Existing Conditions: The Lakeside Ranger Station Office is made up of 3 different buildings which are all permanently joined into one. The office was built in 1964 and expanded in 1982 when a surplus building from another site was added. A second office modular, 04-002, was added in 1992 that includes the conference room, several offices, and bathrooms.
The East Section of the building has a nearly flat, membrane-type roof that’s in good shape. Only minor patching in a few small areas is needed where the mesh is showing through. There is a leak at the west edge of this flat roof, where the middle metal roof overhangs it. The Middle Section of the building has an exposed fastener metal roof with no leaks. The West Section of the building has an exposed fastener metal roof that requires replacement. In the east half of this section, most of the offices have water stains on the suspended ceiling tiles from the leaks. There is wood rot in the facia and soffit on the west side and an undersized gutter not properly attached.
The scope of work for this line item includes the following:
Repair East Section: Patch worn areas of membrane roof (4 SF max) where the mesh is showing with urethane-based UV resistant super silicone sealant, Turbo Poly Seal or approved equal. Cover repairs with Silver Coat.
Repair the leak at the west edge of the flat roof, where the metal roof overhangs it. Go 6 ft out from the wall, and from eave over ridge to next little eave, and 3 ft up wall. Clean/wash the sections, let it dry, and provide and install 2 layers of GACO 100% silicon roof coating.
The rest of the roof: Replace the 2 roof sections that are facing perpendicular to the highway, and small valley portions of roofs that are parallel to the highway and “in” the main roof.
Detach and reset: 5-snow bars, and metal roofing from small valley portions.
Tear off/Demo: Existing 1 layer (and lower layer showing on East side of west section) of metal roofing, all pipe jacks, back 75’ of gutter, swamp cooler and box, and 2 lines to swamp cooler. Cap off the two lines. Tear out and replace rotted wood: 3- plywood, 30’ of 2”x6” sub fascia framing, 30 ‘ of 1”x8” fascia, and 30’ of soffit panels.
P a g e | 9
Inspect all wood for any other rot, and for any bad flashings. Inspect roof decking and underlayment. Replace 32 SF of rotten decking. Immediately inform COR if additional quantity will require replacement.
Provide and install high temperature ice and water shield on 100% of torn off roof areas. Cut 2 pipes to allow installation of new pipe jacks, and then couple them back together. Provide and install: 4- new rubber no caulk plumbing pipe jacks, 2- split jacks, 1- metal jack, 4- 12” box vents, 6’ of new 3” metal piping to heater and seal all penetrations.
Provide and install new metal roof system, PRO PANEL II (or approved equal), 36” lap panels with 45-year paint warranty. COLOR CHOICE: Brown (12). System shall include eave drip edge, gable, ridge, wall flashings, w-valley, panels and screws. Seal wall flashings to top of siding. Provide and install new painted 1”x4” wood trim over wall flashings and seal to top of siding.
Provide and install additional 24- 10’ snow bars to protect gutters and from sudden snow slides Provide and install 75’ of new continuous 5” gutter and downspouts on the west side of the building. Provide and install 121’ of stainless-steel gutter screens on the building gutters.
Clean up, haul away and legally dispose of all trash caused by roofing project. Also remove and dispose of all pine needles from the entire roof, gutters, and downspouts and within 5 feet of the building. Unit of measure is Lump Sum (LS):
C3.3 Base line item 1004 REPLACE ROOF-STRAY HORSE ADMIN BULDINGS (03-110 & 03-113)
STRAY HORSE ADMIN BUILDINGS (03-110 & 03-113)
NAME ID#
YEAR
BUILT TYPE
BLDG
SF ROOF TYPE
ROOF
PITCH
APPROX
ROOF AREA
Kitchen-Bath Admin Bldg. 03-113 1933 Cookhouse 400 Shingled 6/12, 3/12 8 SQ
Dining Hall 03-110 1965 Dining Hall 932 Shingled 6/12 11 SQ
These 2 buildings are connected. Remove existing shingles and damaged metal flashing. Install 15# felt. Install new aluminum flashing. Install new fiberglass shingles of the type recommended for seasonal snow and ice exposure. Install new gutters and downspouts (approx. 40 LF).
Unit of measure is Lump Sum (LS).
C3.4 Base line item 1005 REPAIR ROOF LEAK-LAKESIDE RS ANNEX-TIMBER OFFICE (12-2C)
This office is located in the large metal building that’s behind (north of) the main Lakeside Office Building. The west half of that building has 6 equipment bays with roll-up doors. The Timber Office is the middle of the east half of that building. There is a leak in the closet, which is directly under the A/C unit on the roof. Repair the roof leak.
Unit of measure is Lump Sum (LS
C3.5 Base line item 1006 REPAIR ROOF LEAKS-BLACK MESA RS OFFICE (12-29)
The original office was constructed in 1963, added onto in 1982, and finally added onto and updated in 1996. It is a 10,400 SF building with an exposed fastener metal roof. It has 2 leaks. One leak that recently developed in the radio/computer room. The other leak is along a sidewall intersection with the roof that has been repaired multiple times. Repair both leaks. At the sidewall, remove the roof panels and flashing underneath. Install new flashing that extends up at least 18 inches on the wall. Assume the length of the sidewall/roof intersection is 35 linear feet.
Reinstall the roof panels with new gasketed fasteners. For the section of roof between the two sidewalls (assume an area of 3200 SF) check all fasteners to insure they are tight. If gaskets and screws are in good shape, tighten
P a g e | 10 them. If not, replace them with new gasketed screws. Provide slightly larger diameter screws if the holes have enlarged. Unit of measure is Lump Sum (LS).
C3.6 Optional line item 2001 REPAIR LEAKING SKYLIGHTS-LAKESIDE RS METAL WAREHOUSE (13-88W)
This 40 ft by 50 ft pre-engineered metal building was constructed in 1987. It’s approximately 18 feet tall with 8 skylight panels measuring 2 ft by 10 ft in the roof that leak. Reseal the skylights. Unit of measure is Lump Sum
(LS).
C3.7 Optional line item 2002 REPAIR ROOF LEAKS-BMRS 6-BAY SHOP (11-84)
This 2,475 SF metal building was constructed in 1964. There are 4 skylight panels that leak in the metal roof. Reseal the skylights. Unit of measure is Lump Sum (LS).
C3.8 Optional line item 2003 REPAIR ROOF LEAK-BMRS FITNESS CENTER (11-54)
This is a 1,667 SF building constructed in 1951 with a metal roof. It has one leak due to a wood stove removal.
Repair the leak. Unit of measure is Lump Sum (LS).
C3.9 Optional line item 2004 REPAIR ROOF-BMRS MODULAR CREW QUARTERS “B” (12-32)
This 1800 SF modular building was constructed in 2002. It has a standing seam metal roof. Remove the roof-mounted swamp cooler that’s no longer in use and patch the roof so it doesn’t leak. Unit of measure is lump sum.
C3.10 Optional line item 2005 REPAIR ROOF-STRAYHORSE CAMPGROUND WEST TOILET (R310)
This 112 SF toilet building was constructed in 1992. It has an exposed fastener metal roof that had leaks. The underlying wood was damaged. Remove existing metal roof panels. Replace water-damaged wood. Reinstall the metal panels using new gasketed screws. Reseal the vent stacks and skylights. Unit of measure is Lump Sum.
3.11 Optional line item 2006 REPLACE ROOF- ALPINE ADMIN SITE 1 RESIDENCE (01-032E)
This residence was constructed in 1959. Install approximately 1,936 SF of new metal roof over existing shingled roof. Replace facia trim boards, gutters and downspouts. Paint trim to match house. Unit of measure is Lump Sum.
C3.12 Optional line item 2007 INSTALL NEW GUTTERS AND DOWNSPOUTS
The location will vary but assume it is within 10 miles of any of the other locations within the awarded contract.
Unit of measure is LF.
C3.13 Optional line item 2008 REPAIR ROOF LEAK – 1 PENETRATION
The location will vary but assume it is within 10 miles of any of the other locations within the awarded contract.
Unit of measure is EACH.
C3.14 Optional line item 2009 RESEAL SKYLIGHT
The location will vary but assume it is within 10 miles of any of the other locations within the awarded contract.
Assume the skylight size is 2 ft by 3 ft. Unit of measure is EACH.
P a g e | 11
C3.15 Optional line item 2010 REPLACE METAL ROOF PANEL, 3 FEET WIDE
The location will vary but assume it is within 10 miles of any of the other locations within the awarded contract.
Unit of measure is LF.
C3.16 Optional line item 2011 ADDITIONAL MILEAGE TO SITES (for Items 2007 – 2010)
For any site not within 10 miles of awarded sites, that will require optional line items 2007 – 2010, this line item will pay additional mileage to the site from the nearest awarded site. Unit of measure is per mile.
C.5 CLAUSES
452.211-72 Statement of Work/Specifications (FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
452.211-73 Attachments to Statement of Work/Specifications (FEB 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
SECTION D--PACKAGING AND MARKING
D-1 PACKING AND MARKING
All shipments of materials, equipment and/or supplies shall be addressed to the Contractor and not to the Government.
D-2 PROJECT LABELING FOR OFFICIAL COORESPONDENCE
The Government singularly identifies each project with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The Government issued contract number is to be referenced on all official communication starting upon notice of award.
SECTION E--INSPECTION AND ACCEPTANCE
E.1 CLAUSES
FAR 52.246-12 Inspection of Construction (AUG 1996) FAR 52.246-13 Inspection-Dismantling, Demolition, or Removal of Improvements (AUG 1996)
P a g e | 12
SECTION F--DELIVERIES OR PERFORMANCE
F.1 CLAUSES
52.211-13 Time Extensions (SEP 2000) 52.211-18 Variation in Estimated Quantity (APR 1984) 52.242-14 Suspension of Work (APR 1984)
52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 90 calendar days from notice to proceed. The time stated for completion shall include final cleanup of the premises. Work shall not be permitted on weekends.
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 CLAUSES
452.215-73 Post Award Conference (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled and held within 60 calendar days after the date of contract award. The conference will be held at (to be determined).
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H.1 CLAUSES
452.237-74 Key Personnel (FEB 1988)
(a) The Contractor shall assign to this contract the following key personnel: Project Superintendent.
(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.
P a g e | 13
PART II--CONTRACT CLAUSES / SECTION I--CONTRACT CLAUSES
I.1 CLAUSES
52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Federal Acquisition Regulation (FAR) Clauses: https://www.acquisition.gov/browse/index/far (FAR clauses begin with 52) Department of Agriculture Acquisition Regulation (AGAR) Clauses: https://www.acquisition.gov/agar (AGAR clauses begin with 452) Deviations to clauses may be viewed at: https://www.dm.usda.gov/procurement/policy/FARClassDeviations.htm
52.202-1 Definitions (JUN 2020) 52.203-3 Gratuities (APR 1984) 52.203-5 Covenant against Contingent Fees (MAY 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (JUN 2020) 52.203-7 Anti-Kickback Procedures (JUN 2020) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (MAY 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (JUN 2020) 52.203-13 Contractor Code of Business Ethics and Conduct (JUN 2020) 52.203-14 Display of Hotline Poster(s) (JUN 2020) 52.203-17 Contractor Employee Whistleblower Rights & Requirements to Inform Employees of Whistleblower Rights (JUN 2020) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) 52.204-2 Security Requirements (AUG 1996) Alternate II (APR 1984) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) 52.204-13 System for Award Management Maintenance (OCT 2018) 52.204-18 Commercial and Government Entity Code Maintenance (AUG 2020) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other
Covered Entities (JUL 2018) 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (AUG 2020) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for
Debarment (JUN 2020) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) 52.210-1 Market Research (JUN 2020) 52.215-2 Audit and Records -- Negotiation (JUN 2020) 52.215-8 Order of Precedence—Uniform Contract Format (OCT 1997) 52.215-10 Price Reduction for Defective Certified Cost or Pricing Data (AUG 2011) 52.215-11 Price Reduction for Defective Certified Cost or Pricing Data-Modifications (JUN 2020) 52.215-14 Integrity of Unit Prices (JUN 2020) Alt 1 (OCT 1997) 52.215-15 Pension Adjustments and Asset Reversions (OCT 2010) 52.215-18 Reversion or Adjustment of Plans for Postretirement Benefits (PRB) Other Than Pensions (JUL 2005) 52.215-19 Notification of Ownership Changes (OCT 1997)
[Contracting Officer check as appropriate.] ☒By the end of the base term of the contract and then by the end of each subsequent option period; or ☐By the end of the performance period for each order issued under the contract.
52.219-6 Notice of Total Small Business Set-Aside (NOV 2020) 52.219-8 Utilization of Small Business Concerns (OCT 2018) 52.219-9 Small Business Subcontracting Plan (NOV 2021)
☐By the end of the base term of the contract and then by the end of each subsequent option period; or https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/agar https://www.dm.usda.gov/procurement/policy/FARClassDeviations.htm
P a g e | 14
☒By the end of the performance period for each order issued under the contract.
52.219-28 Post Award Small Business Program Rerepresentation (NOV 2020)
[Contracting Officer check as appropriate.] ☒By the end of the base term of the contract and then by the end of each subsequent option period; or ☐By the end of the performance period for each order issued under the contract.
52.222-3 Convict Labor (JUN 2003) 52.222-4 Contract Work Hours and Safety Standards -- Overtime Compensation (MAY 2018) 52.222-6 Construction Wage Rate Requirement (AUG 2018) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (AUG 2018) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (MAY 2014) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (APR 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.222-30 Construction Wage Rate Requirements-Price Adjustment (None or Separately Specified Pricing Method) (AUG 2018) 52.222-35 Equal Opportunity for Veterans (JUN 2020) 52.222-36 Equal Opportunity for Workers with Disabilities (JUN 2020) 52.222-37 Employment Reports on Veterans (JUN 2020) 52.222-40 Notification of Employee Rights Under National Labor Relations Act (DEC 2010) 52.222-50 Combating Trafficking in Persons (OCT 2020) 52.222-54 Employment Eligibility Verification (OCT 2015) 52.222-55 Minimum Wages under Executive Order 13658 (NOV 2020) 52.222-62 Paid Sick Leave under Executive Order 13706 (JAN 2017) 52.223-2 Affirmative Procurement of Biobased Products under Service and Construction Contracts (SEP 2013) 52.223-3 Hazardous Material Identification and Material Safety Data Alt 1 (JAN 1997) 52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun 2016) 52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN 2016) 52.223-15 Energy Efficiency in Energy Consuming Products (MAY 2020) 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts (AUG 2018) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) 52.223-20 Aerosols (JUN 2016) 52.223-21 Foams. (JUN 2016) 52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008) 52.227-1 Authorization and Consent (JUN 2020) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (JUN 2020) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-5 Insurance – Work on a Government Installation (JAN 1997) 52.229-3 Federal, State, and Local Taxes (FEB 2013) 52.229-4 Federal, State, and Local Taxes (State and Local Adjustments) (FEB 2013) 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) 52.232-17 Interest (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (OCT 2018) 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) 52.233-1 Disputes (MAY 2014) Alt 1 (DEC 1991) 52.233-3 Protest after Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984)
P a g e | 15
52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991)
Alternate I (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-16 Quantity Surveys (APR 1984)
Alternate 1 (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997)
Alternate I (APR 1984) Alternate II (APR 1984)
52.242-5 Payments to Small Business Subcontractors (JAN 2017) 52.242-13 Bankruptcy (JUL 1995) 52.243-4 Changes (JUN 2007) 52.244-2 Subcontracts (JUN 2020) 52.244-5 Competition in Subcontracting (DEC 1996) 52.244-6 Subcontracts for Commercial Items (NOV 2020) (DEVIATION APR 2020) 52.245-1 Government Property (JAN 2017) - Alt 1 (APR 2012) 52.245-9 Use and Charges (APR 2012) 52.246-21 Warranty of Construction (MAR 1994)
Alternate I (MAR 1994) 52.248-3 Value Engineering – Construction (OCT 2020) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (APR 2012)--Alternate I (SEP 1996) 52.249-3 Termination for Convenience of the Government (Dismantling, Demolition, or Removal of Improvements) (APR 2012) 52.249-10 Default (Fixed-Price Construction) (APR 1984)
Alternate I (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991) 452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996) 452.236-71 Prohibition against the Use of Lead-Paint (NOV 1996) 452.236-72 Use of Premises (NOV 1996) 452.236-73 Archeological or Historic Sites (FEB 1988) 452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996) 452.236-76 Samples and Certificates (FEB 1988) 452.236-77 Emergency Response (NOV 1996)
52.219-14 Limitations on Subcontracting (SEP 2021)
(a) This clause does not apply to the unrestricted portion of a partial set-aside.
(b) Definition. Similarly situated entity, as used in this clause, means a first-tier subcontractor, including an independent contractor, that—
(1) Has the same small business program status as that which qualified the prime contractor for the award (e.g., for a small business set-aside contract, any small business concern, without regard to its socioeconomic status); and
(2) Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract.
(c) Applicability. This clause applies only to— (1)Contracts that have been set aside for any of the small business concerns identified in 19.000(a)(3);
(2)Part or parts of a multiple-award contract that have been set aside for any of the small business concerns identified in 19.000(a)(3);
(3)Contracts that have been awarded on a sole-source basis in accordance with subparts 19.8, 19.13, 19.14, and 19.15;
(4)Orders expected to exceed the simplified acquisition threshold and that are— (i)Set aside for small business concerns under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or (ii)Issued directly to small business concerns under multiple-award contracts as described in 19.504(c)(1)(ii);
https://www.acquisition.gov/far/part-19#FAR_19_000 https://www.acquisition.gov/far/part-19#FAR_19_000 https://www.acquisition.gov/far/part-19#FAR_Subpart_19_8 https://www.acquisition.gov/far/part-19#FAR_Subpart_19_13 https://www.acquisition.gov/far/part-19#FAR_Subpart_19_14 https://www.acquisition.gov/far/part-19#FAR_Subpart_19_15 https://www.acquisition.gov/far/part-8#FAR_8_405_5 https://www.acquisition.gov/far/part-16#FAR_16_505 https://www.acquisition.gov/far/part-19#FAR_19_504
P a g e | 16
(5)Orders, regardless of dollar value, that are— (i)Set aside in accordance with subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 8.405-
5 and 16.505(b)(2)(i)(F); or (ii)Issued directly to concerns that qualify for the programs described in subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 19.504(c)(1)(ii); and (6)Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the evaluation preference.
(d) Independent contractors . An independent contractor shall be considered a subcontractor.
(e) Limitations on subcontracting. By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract assigned a North American Industry Classification System (NAICS) code for— (1)Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract;
(2)Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials , to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract;
(3)General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials , to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded; or
(4)Construction by special trade contractors , it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials , to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 75 percent subcontract amount that cannot be exceeded.
(f) The Contractor shall comply with the limitations on subcontracting as follows:
(1) For contracts, in accordance with paragraphs (c)(1), (2), (3) and (6) of this clause— [Contracting Officer check as appropriate.]
□ By the end of the base term of the contract and then by the end of each subsequent option period; or
□ By the end of the performance period for each order issued under the contract.
(2) For orders, in accordance with paragraphs (c)(4) and (5) of this clause, by the end of the performance period for the order.
(g)A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.
(End of clause)
52.225-9 Buy American Act-Construction Materials (JAN 2021)
(a) Definitions. As used in this clause-
Commercially available off-the-shelf (COTS) item-
(1) Means any item of supply (including construction material) that is-
(i) A commercial item (as defined in paragraph (1) of the definition at Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
https://www.acquisition.gov/far/part-19#FAR_Subpart_19_8 https://www.acquisition.gov/far/part-19#FAR_Subpart_19_13 https://www.acquisition.gov/far/part-19#FAR_Subpart_19_14 https://www.acquisition.gov/far/part-19#FAR_Subpart_19_15 https://www.acquisition.gov/far/part-8#FAR_8_405_5 https://www.acquisition.gov/far/part-8#FAR_8_405_5 https://www.acquisition.gov/far/part-16#FAR_16_505 https://www.acquisition.gov/far/part-19#FAR_Subpart_19_8 https://www.acquisition.gov/far/part-19#FAR_Subpart_19_13 https://www.acquisition.gov/far/part-19#FAR_Subpart_19_14 https://www.acquisition.gov/far/part-19#FAR_Subpart_19_15 https://www.acquisition.gov/far/part-19#FAR_19_504
P a g e | 17
Cost of components means-
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit.
Cost of components does not include any costs associated with the manufacture of the construction material.
Domestic construction material means-
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if-
(A) The cost of its components mined, produced, or manufactured in the United States exceeds 55 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".
Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
Foreign construction material means a construction material other than a domestic construction material.
Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.
Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.
Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.
"United States" means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference. (1) This clause implements 41 U.S.C. Chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
P a g e | 18
[Contracting Officer to list applicable excepted materials or indicate "none"]
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined,…