Section 151. — MOBILIZATION
Description
151.01 This work consists of moving personnel, equipment, material, and incidentals to the project and performing work necessary before beginning work at the project site. This work also includes obtaining permits, insurance, and bonds.
Payment
151.02 Payment will be full compensation for the work prescribed in this Section.
Progress payments for mobilization will be paid as follows:
(a) Bond premiums will be reimbursed according to FAR Clause 52.232-5 Payments Under Fixed-Price Construction Contracts, after receipt of the evidence of payment.
(b) When 100 percent of the original contract amount for each Radio Site is completed for the pay items listed in the Schedule of Items, 100 percent will be paid for that Radio Site.
01770 - 1
CLOSEOUT PROCEDURES
SECTION 01770
CLOSEOUT PROCEDURES
PART - GENERAL
1.1 SUMMARY
A. This Section includes administrative and procedural requirements for contract close-out, including, but not limited to, the following:
1. Inspection procedures.
2. Project Record Documents.
3. Operation and maintenance manuals.
4. Warranties.
5. Instruction of Government personnel.
6. Final cleaning.
1.2 FINAL COMPLETION
A. Before requesting final inspection for determining date of Final Completion, complete the following:
1. Instruct Government personnel in operation, adjustment, and maintenance of products, equipment, and systems.
2. Submit specific warranties, final certifications, and similar documents.
3. Prepare and submit operation and maintenance manuals.
4. Complete startup testing of systems.
5. Clean up any waste material.
1.3 OPERATION AND MAINTENANCE MANUALS
A. Assemble a complete set of operation and maintenance data indicating the operation and maintenance of each system, subsystem, and piece of equipment not part of a sys-tem. Include operation and maintenance data required in individual Specification Sec-tions and as follows:
1. Emergency Contacts: Include Contractor Emergency Contact Phone, Cell, and e-mail.
2. Operation Data: Include emergency instructions and procedures, system and equipment descriptions, operating procedures, and sequence of operations.
3. Maintenance Data: Include manufacturer's information, list of spare parts, maintenance procedures, maintenance and service schedules for preventive and routine maintenance, and copies of warranties and bonds.
B. Organize operation and maintenance manuals into suitable sets of manageable size.
Bind and index data in heavy-duty, three-ring, vinyl-covered, loose-leaf binders, in thickness necessary to accommodate contents, with pocket inside the covers to receive folded oversized sheets. Identify each binder on front and spine with the printed title
01770 - 2
CLOSEOUT PROCEDURES
"OPERATION AND MAINTENANCE MANUAL," Project name, and subject matter of contents.
1.4 WARRANTIES
A. Submittal Time: Submit written warranties on request of CO for designated portions of the Work where commencement of warranties other than date of Substantial Com-pletion is indicated.
B. Organize warranty documents into an orderly sequence based on the table of contents of the Project Manual.
C. Provide additional copies of each warranty to include in operation and maintenance manuals.
PART 2 – PRODUCTS
PART 3 – EXECUTION
3.1 DEMONSTRATION AND TRAINING
A. Instruction: Instruct Government personnel to adjust, operate, and maintain systems, subsystems, and equipment not part of a system.
1. Provide instructors experienced in operation and maintenance procedures.
2. Provide instruction at mutually agreed-on times.
3. Schedule training with Government, through CO, with at least seven day’s ad-vance notice.
3.2 FINAL CLEANING
A. General: Provide final cleaning. Comply with safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess materials on Government property.
Do not discharge volatile, harmful, or dangerous materials into drainage systems.
Remove waste materials from Project site and dispose of lawfully.
END OF SECTION 01770
power.cummins.com ©2019 Cummins Inc. | S-6344-EN | PDA060J523 (09/19)
Specification Sheet
POWERCOMMAND CLOUD™
REMOTE MONITORING SYSTEM
“Cummins Digital Solutions will provide customers with the ability to manage their power system assets, globally”
Description
The PowerCommand Cloud™ is a robust and reliable remote monitoring system that provides information and send notifications to ensure your equipment is available when you need it.
With easy-to-use mobile and web application giving you instant access to your equipment enabling real-time monitoring and control so you can make the right decisions, right away
— thus minimizing downtime and maximizing power system performance along with asset availability.
Highlights
• Site and asset status at a glance
• Notifications
• Real-time Remote Monitoring through PowerCommand Cloud™
• Asset Control
• Convenient access through Web UI and Mobile app with multi-language support
• Multiple site and fleet management
• Secure data transmission and storage
• Data Trending with export capability
• Maintenance Alert based on recommended service interval
• PowerCommand Controls are supported by a worldwide network of independent distributors who provide parts, service and warranty support
Features
◼ Connectivity: PowerCommand 500/550 Cloud Link N
(CLN) supports Ethernet or Cellular.
◼ Communication: The PowerCommand 500/550 CL
N communicates directly with the Power Generation
Asset by communicating telemetry data and remote-control capability to the PowerCommand Cloud™.
◼ Monitoring: The PowerCommand Web and Mobile app monitors customer account and site information along with monitoring asset data (generator, transfer switch, DMC products and sensors).
◼ Integration with the QuietConnect™ Home
Standby Generator: PowerCommand Cloud solution is integrated within the Cummins Connect Cloud™
Web and Mobile App.
◼ Asset Control: The PowerCommand Web and
Mobile app can control the Power Generation Asset via start, stop, exercise scheduler and fault reset commands.
◼ Notification: The PowerCommand Cloud has the capability to notify users of Warnings and Faults via email, push notification and indirect SMS (if supported by wireless carrier).
◼ Account & Fleet Management: The
PowerCommand Web and Mobile app offers fleet management capability by giving visibility and remote control of Customer’s assets.
◼ Event Storage and Export: The PowerCommand
Cloud stores the event log while the web and mobile app enables the user to monitor the event logs.
◼ Data Trending (Storage and Export): The
PowerCommand Cloud stores the data and the web app enables data export and graphing of data trends.
◼ On Device Diagnostics: The PowerCommand
500/550 Cloud Link N offers on-device diagnostics.
◼ Software Update: The PowerCommand 500/550
Cloud Link N enable gateway software update capability.
◼ PC500/550 Remote Software Update:
PowerCommand Cloud Web app enables execution of remote software updates on the asset.
◼ Supported Language: The PowerCommand Cloud supports English, French, Spanish, Chinese
(Simplified) and Brazilian-Portuguese.
◼ Mobile App Support: PowerCommand Cloud supports the following Mobile Apps for both iOS and Android:
Connect Cloud and PowerCommand Cloud.
◼ Third-Party Genset Support: Integrate third-party power system equipment (Generator, Auto Transfer
Switch) using CCM-G, CCM-T or Wired Genset solution to accomplish remote monitoring/controlling capabilities.
◼ Maintenance Warning: The PowerCommand Cloud supports user-configurable maintenance alerts with notification capability for all assets. The reminder interval can be based on Engine Hours or time.
PowerCommand CloudTM User Interface Users can remotely access real-time information using mobile and web app.
The web Dashboard allows users to view the status of all configured devices in one glance.
The Dashboard provides an overall system status at a glance that may include multiple sites and devices connected to the cloud. Users have the flexibility to filter assets by status and location and then access information about specific sites and equipment.
Genset Information
• Asset Details: Easy access to Generator’s details such as model, serial number, and control model.
• Annunciator Data: This section displays the key status, warning and fault events where color coding is used (green, amber, red) depending on the event severity according to NFPA110.
• Alternator Data: User can access vital electrical genset information.
• Engine Data: Engine information is available in this section.
• Exercise Scheduler: User can set the Exercise Schedule for each asset.
• Maintenance Alert: PowerCommand Cloud will alert the user when Maintenance is required based on Engine Hours.
The genset status and telemetry information is available via both the mobile app and web app.
• Data Trending: The user can create graphs for a device by selecting a parameter and duration. In addition, asset data can be exported to .csv files.
Automatic Transfer Switch (ATS) Information
ATS status and telemetry information is available on the ATS page. The user can also to create data trend graphs for a particular device by selecting a parameter and duration.
• Asset Details: Easy access to ATS’s details such as model, serial number, and control model.
• Annunciator Data: This section displays the key status, warning and fault events where color coding is used (green, amber, red) depending on the event severity according to NFPA110.
• Sources Data: User can access vital electrical source information including status.
• Load Data: Load information is available in this section.
• Data Trending: The user can create graphs for a particular device by selecting a parameter and duration. In addition, asset data can be exported to .csv files.
• Maintenance Alert: PowerCommand Cloud will alert the user when Maintenance is required based on the recommended service intervals.
Digital Master Control (DMC) Information
DMC status and telemetry information is available on the DMC page. The user can also to create data trend graphs for a particular device by selecting a parameter and duration.
• Asset Details: Easy access to DMC details such as model, serial number, control model along with system information.
• Events: View operational events including Warning & Shutdowns along with the associated timestamps.
• Data Trending: The user can create graphs for a particular device by selecting a parameter and duration. In addition, asset data can be exported to .csv files.
• Maintenance Alert: PowerCommand Cloud will alert the user when Maintenance is required based on the recommended service intervals.
Sensors By selecting the Sensors tab the user can view all configured sensors in the inputs. In addition to device specific Inputs, the user can add an AUX 101 (8-configurable inputs) and an AUX 102 (4-non configurable discrete inputs) for additional remote monitoring capability. The Sensors Page displays configured sensors (states/values, low warnings and high warnings). Similar to the generator set and transfer switch data, the user can access specific event logs associated with all configured sensors.
Notifications Get notified when your equipment needs attention. PowerCommand CloudTM sends notifications and gives you instant access to your equipment enabling real-time monitoring and control so you can make the right decisions, right away
— thus minimizing downtime and maximizing power system performance.
Certifications
ICES-003B
Dimensions of the PC 500/550 Cloud Link N
Dimensions are millimeters (inches)
System Requirements Web App
PC or Macintosh computer, tablet, smart phone
Browser: Internet Explorer, version 9.0 or later, Google Chrome, Firefox, Safari.
Minimum screen resolution, 1024 x 768
Gateway
Browser: Internet Explorer, version 9.0 or later.
Operating System: Microsoft Windows, Mac OS X or Linux
HTML5 Support
Windows Mobile Device Center
Minimum screen resolution, 1024 x 768
Network: 10/100-megabit Ethernet for the primary physical connection
Port Specification:
o MQTTS outgoing 168.61.54.255 uses port 8883 TCP o HTTPS outgoing 40.114.00.153 uses port 443 TCP
The cellular service provider must have a network to support 3G service.
o Frequency Band: 850/900/1700
(AWS)/1900/2100
Language The user interface and manuals are available in English, French, Spanish, Brazilian-Portuguese, and Chinese (Simplified).
Hardware Requirements For installation and communication, the following additional hardware may be required:
SIM card (GSM)
Modbus cable
Antenna extension cable
PowerCommand Input/Output AUX 101 Module
PowerCommand Input/Output AUX 102 Expansion
Module
Modbus Controls
There is no additional hardware required for Modbus controls: PS0500, PS0600, DMC1000, PCC1301, 1302, 2300 and 3300.
LonWorks Controls
Required hardware for LonWorks-based controls:
PCC2100, 3100, 3200 and 3201 generator set controls and OTPC, BTPC, OHPC and CHPC transfer switch controls:
PowerCommand Lon Gateway S-6191
PowerCommand Network Communications Module
(NCM)
ModLon Connection Cable
Additional hardware required for non-communicating
OTEC, GTEC or third-party transfer switch controls and third-party generator set controls:
PowerCommand Lon Gateway LonWorks to
Modbus Converter
PowerCommand Network Communication Module
(CCM-G)
PowerCommand Control Communication Module
(CCM-T)
PowerCommand Input/Output AUX 101 Module
PowerCommand Input/Output AUX 102 Expansion
Module
Modbus Communications
A shielded twisted pair cable, Belden 9729 cable or equivalent, is recommended for Modbus communication between the PowerCommand 500/550
Cloud Link N and any configured devices.
Power Supply Requirements
The use of a power supply, with the following specification, is recommended. It is also recommended to connect the power supply and PowerCommand
500/550 Cloud Link N to an uninterruptible power supply (UPS).
Voltage range 12 to 24VDC
Current (12V typical) 250mA
Current (24V typical) 125mA
Power (typical) 3.0W
Power (maximum) 5.0W
Environment
Operating temperature -20°C to 70°C
(-4°F to 158°F)
Storage temperature -40°C to 85°C
(-40°F to 185°F)
Humidity 85% RH, non-condensing
Mounting and Installation
PowerCommand 550/500 is DIN rail mountable and should be installed in a location suitable for telecommunications, information technology or networking equipment.
For more information contact your local Cummins distributor or visit power.cummins.com
©2019 Cummins Inc. All rights reserved. Cummins is a registered trademark of Cummins Inc. PowerCommand, AmpSentry, InPower and “Our energy working for you.” are trademarks of Cummins Inc. Other company, product, or service names may be trademarks or service marks of others. Specifications are subject to change without notice.
S-6344-EN | A060J523 (09/19)
Standard Product Contents PowerCommand 500 or 550 Cloud Link N
Antenna (GSM)
USB On-The-Go (OTG) cable
Ethernet cable
Quick Start Guide
Quick Troubleshooting Guide
Warranty Statement
CD containing Owner’s Manual, Quick Start Guide, Quick Troubleshooting Guide and Warranty
Statement in English
Accessories
A035C381 Antenna Extension (12ft)
0541-1291 PowerCommand Input/Output AUX 101
Module
0541-0772 PowerCommand Input/Output AUX 102
Expansion Module
A054V134 Lon Gateway - LonWorks to Modbus
Converter
0541-0770 Network Genset Communications
Module (NCM) for PCC 2100
0541-0813 Network Genset Communications
Module (GCM) for PCC 3100
0541-0809 Network Genset Communications
Module (NCM) for PCC 3200/3201
0541-0810 Controls Communications Module, generator set (CCM-G)
0541-0811 Controls Communications Module, transfer switch (CCM-T)
0541-0868 Network Communications Module
(NCM) for OTPC/BTPC, >1000 A
Ordering Information Part number Description
A059Y211 PC 500 Cloud Link N (up to 2 devices)
A059Y210 PC 550 Cloud Link N (up to 12 devices) http://power.cummins.com/
ELECTRIFIC ATION PRODUCTS
The world’s first true all-in-one ATS is here.
2 TR U O N E ™ TH E WO R L D ’ S FIR S T TR U E A L L- I N - O N E ATS
Introducing TruONE™ ATS from ABB.
A critical breakthrough for critical power.
The all-new TruONE™ is the world’s first true purpose-built automatic transfer switch, engineered to incorporate switch and controller in one seamless unit.
Performance tested beyond standard requirements, TruONE™ stands ready to ensure the steady delivery of critical power at all times. Its self-contained design reduces the number of wires and connections, which speeds installation and minimizes the potential for connection failures to ensure best-in-class reliability. Its predictive maintenance and modular components reduce downtime and service costs. And its advanced connectivity is ready for the future. In addition, unlike typical ATS solutions, TruONE™ allows emergency manual operation under load for immediate power restoration in the event of an equipment malfunction.
TruONE™ represents a major shift in engineering and a critical breakthrough for critical power.
4 TR U O N E ™ TH E WO R L D ’ S FIR S T TR U E A L L- I N - O N E ATS
Easy to Install Reduces installation time by up to 80%.
Why waste time piecing together an ATS from multiple components and as many as 20 connec-tion wires, not to mention the time spent testing?
TruONE™ is the first automatic transfer switch to put it all together, including the controller with detachable HMI. It can be installed with a single wire using standard enclosures.
Safety and Protection Reduces risk of operator injury.
TruONE™ enables emergency manual operation— even under load—without opening the panel door when the HMI is mounted to the ATS frame. The HMI can be detached from the frame for door mounting, offering more flexibility for the panel designer. Best of all, regardless of the HMI instal-lation method, there’s no need for connecting dangerous line voltages to the door, so the risk of operator injury due to equipment malfunction is reduced.
Optimum Interface Simplifies connectivity.
TruONE™ features cloud-based connectivity through the ABB AbilityTM Electrical Distribution Control System (EDCS). ABB Ability simplifies implementation and use of TruONE™ in coordina-tion with other ABB devices, ensuring one common user interface and one common software environment. Market-leading modular connectivity with seven communication protocols ensures easy installation and connectivity now and far into the future.
01 Detachable HMI.
Three levels of control to meet different cus-tomer requirements.
02 All-in-one concept that brings easy and fast installation.
The one ATS with all these advantages
5—
Even more advantages.
6 TR U O N E ™ TH E WO R L D ’ S FIR S T TR U E A L L- I N - O N E ATS
Speed Up Your Project Now you can speed up your project even more, thanks to TruONE™ automatic commissioning capabilities. Pre-made configuration files can be uploaded from your PC to TruONE™, minimizing the risk of human error and reducing programming time by 80%.
Continuous Operation TruONE™ features predictive maintenance, self-diagnos-tics and customer-replaceable critical modules to simplify service and significantly reduce downtime and service costs. Say goodbye to blinking lights and stopping motors. TruONE™ provides a fast in-phase open transition of power, ensuring unnoticed generator use during business hours.
Energy Efficiency Full compatibility with ABB AbilityTM EDCS allows data processing from the site’s electrical equipment to deliver analysis and make recommendations for optimizing the electrical system’s performance. This allows remote monitoring of plants, energy consumption and costs at a glance, making implementation of energy management strategies easier and faster.
Optimized Logistics TruONE™ features a wide voltage range from 200 to 480 VAC (with +/-20% tolerance), reducing the need to stock multiple SKUs, reducing inventory and saving space in the warehouse.
Space Saving TruONE™ features plug-in factory and field-mount accessorizing, so you don’t need extra space inside the panel. Even in the case of specialized customer needs, you can use standard cabinets.
Reliable in extreme conditions.
You can be sure TruONE™ exceeds standard requirements for performance and reliability to bring you dependable operation in even the most challenging electrical, mechanical and environmental conditions.
TruONE™ is the only ATS to guarantee safe and reliable operation during dramatic variations in temperature (-25–+70°C) and voltage (200–480 VAC with +/-20% tolerance), and it’s tolerant of vibrations (acc. IEC 60068-2-6) and shocks (acc. IEC 60068-2-27). TruONE™ also has true short-circuit resilience, able to take the hit and remain fully operational after exposure to even the most dangerous phenomena.
Site conditions can change due to unexpected situations, but the performance of TruONE™ does not.
Testing for vibrations, shocks and a wide temperature range.
8 TR U O N E ™ TH E WO R L D ’ S FIR S T TR U E A L L- I N - O N E ATS
The one ATS for all applications.
Bring the highest level of convenience, efficiency and critical power security to your product, project or facility.
TruONE™ is the superior solution for:
• Genset OEMs
• Panel builders
• Consultants and engineers
• Contractors
• Facilities managers
TruONE™ provides superior critical power security for:
• Hospitals
• Sports arenas
• Retail environments
• High-rise buildings
• Commercial buildings
• Financial environments
• Data centers
• And more
There’s only one TruONE™ ATS.
Get the unique ease and reliability of the world’s first true all-in-one ATS. TruONE™. Contact your ABB representative or visit abb.com for more information.
10 TR U O N E ™ TH E WO R L D ’ S FIR S T TR U E A L L- I N - O N E ATS
Symbols
Open style, no enclosure
Bottom entry (sources on bottom, load on top)
Top entry (sources on the top, load on the bottom)
TruONETM part number key
Symbols
Open transition I - II (without stable OFF position for load disconnection)
Delayed transition I - O - II (with stable OFF position for load disconnection)
Symbols
30, 60, 100, 125, 160, 200, 260, 400, 600, 800, 1000, 1200
200, 250, 315, 400, 500, 630, 800, 1000, 1250, 1600
Symbols
1-pole
2-pole
3-pole
ABB TruONE® ATS
ABB Brand
A
B
ATS size
Phase poles
ATS type
OX
OX A S 4U 3
UL
IEC
1000 Q
Symbols
IEC
UL
Standard
E
U
Symbols
Switched Neutral
Overlapping Neutral
None
Neutral
S
O
X
Symbols
Level 2 controls (DIP)
Level 3 controls (LCD)
Level 4 controls (Touch)
Controller
200–480 VAC
Voltage code
Q
B
Enclosure rating
Cabling direction
B
Symbols
_(blank) Open style, no enclosure
T
Note: For available configurations, see the ordering information pages.
ABB TruONE® automatic transfer switch, open transition, 1000 amperes, UL, 3 phase + Neutral (3ph, 4 wire), Level 4 controls, 200–480 VAC voltage area, bottom entry (sources on bottom, load on top).
Open style ATS
UL 30-200 A
IEC 200-250 A
Open style ATS
UL 260 A
IEC 315-400 A
Open style ATS
UL 800-1200 A
IEC 1000-1600 A
Open style ATS
UL 400-600 A
IEC 500-800 A
TruONETM
Targeted Product Performance
ATS Frame Size 30-400 A 260-800 A 800-1600 A
Rated operational current IEC 60947-6-1, GB 14048-11: AC-33B 200-400 A 630-800 A 1000-1250 A
GB 14048-11: AC-33iA 30-200 A 260-600 A 800-1200 A
UL1008: Emergency systems–total system load 30-200 A 260-600 A 800-1200 A
Short-circuit characteristics Iq (rated conditional short-circuit current) 100 kA 100 kA 100 kA
Icw (rated short-time withstand current)/Short-time current ratings, 100ms 18-30 kA 42 kA 50 kA
Icw (rated short-time withstand current)/Short-time current ratings, 500ms 30 kA 50 kA
Withstand and Close-on ratings (any breaker) 480V 42 kA 50 kA 85 kA
Withstand and Close-on ratings, with current limiting fuses 200 kA 200 kA 200 kA
Note: See the TruONE technical catalog for confirmed ratings
12 TR U O N E TH E WO R L D ’ S FIR S T TR U E ATS
Level 2 controls Level 3 controls Level 4 controls
Ampere sizes available IEC: 200-1600 A IEC: 200-1600 A IEC: 200-1600 A
UL: 30-1200 A UL: 30-1200 A UL: 30-1200 A
Rated voltage 200-480Vac 200-480Vac 200-480Vac
Rated frequency 50 / 60 Hz 50 / 60 Hz 50 / 60 Hz
Phase system Single and Three Single and Three Single and Three
Number of poles 2, 3 and 4 2, 3 and 4 3 and 4
Neutral configuration
Switched Yes Yes Yes
Overlapping No Yes Yes
Product type
Open transition (I-II) Yes Yes Yes
Delayed transition (I-O-II) Yes Yes Yes
Voltage and frequency settings
Pick up Voltage Source 1 Fixed 2% above drop out 71-99%, 101-119% 71-99%, 101-119%
Drop out Voltage Source 1 +/-5, 10, 15, 20% 70-98%, 102-120% 70-98%, 102-120%
Pick up Voltage Source 2 Fixed 2% above drop out 71-99%, 101-119% 71-99%, 101-119%
Drop out Voltage Source 2 +/-5, 10, 15, 20% 70-98%, 102-120% 70-98%, 102-120%
Pick up Frequency Source 1 Fixed 1% above drop out 80.5-99.5%, 100.5-119.5% 80.5-99.5%, 100.5-119.5%
Drop out Frequency Source 1 +/-5, 10 % 80-99%, 101-120% 80-99%, 101-120%
Pick up Frequency Source 2 Fixed 1% above drop out 80.5-99.5%, 100.5-119,5% 80.5-99.5%, 100.5-119.5%
Drop out Frequency Source 2 +/-5, 10 % 80-99%, 101-120% 80-99%, 101-120%
Time delay settings
Override momentary Source 1 Outage, sec 0, 1, 2, 3, 4, 5, 10, 15, 20, 25, 30 0-60 0-60
Transfer from Source 1 to Source 2, sec Fixed 2 seconds 0-3600 0-3600
Override momentary Source 2 Outage, sec Fixed 1,5 seconds 0-60 0-60
Transfer from Source 2 to Source 1, min 0, 1, 2, 3, 4, 5, 10, 15, 20, 25, 30 0-120 0-120
Generator stop delay, min 30 secs or 4 mins 0-60 0-60
Center-OFF delay, sec 0 or 4 0-300 0-300
Pre-transfer delay S1 to S2, sec No 0-60 0-60
Post-transfer delay S1 to S2 , sec No 0-60 0-60
Pre-transfer delay S2 to S1, sec No 0-60 0-60
Post-transfer delay S2 to S1, sec No 0-60 0-60
Elevator Pre-signal delay S1 to S2, sec No 0-60 0-60
Elevator Post-signal delay S1 to S2, sec No 0-60 0-60
Elevator Pre-signal delay S2 to S1, sec No 0-60 0-60
Elevator Post-signal delay S2 to S1, sec No 0-60 0-60
Load shed delay, sec No 0-60 0-60
Source failure detections (continues on next page)
No voltage Yes Yes Yes
Undervoltage Yes Yes Yes
Overvoltage Yes Yes Yes
Phase missing Yes Yes Yes
Voltage unbalance Yes Yes Yes
Invalid frequency Yes Yes Yes
Incorrect phase sequence Yes Yes Yes
Feature comparison l
ON
ll
ON
Auto Alarm reset
AUTO
S1 S2
LOAD
l ll
O
O
OFF
Esc l
ON
ll
ON
AUTO
S1 S2
LOAD
l ll
O
O
OFF
TruONETM feature comparison
Main features in the table below. Consult ABB for more information.
Lamp test l
ON
Off load test ll
ON
Auto Alarm reset
On load test
Bypass time delay
Dropout ∆U / ∆f
Manual retransfer
Generator stop delay
4 min 30 s
∆U 5% / ∆f 5%
∆U 10% / ∆f 5%
∆U 15% / ∆f 10%
∆U 20% / ∆f 10%
S1 Failure delay [s]
S1 Return delay [min]
On Off
Auto config
Start Ok
Priority
No priority Source 1
In-phase monitor
Off On
AUTO
S1 S2
LOAD
l ll
O
O Position delay
4 s 0 s
O
OFF
Level 2 controls Level 3 controls Level 4 controls
Features
Controls DIP + keys LCD + keys Touch + keys
LED indications for ATS, S1 and S2 status Yes Yes Yes
Open transition - Standard digital inputs/outputs 0 / 1 1 / 1 2 / 1
Delayed transition - Standard digital inputs/outputs 1 / 1 2 / 1 3 / 1
Programmable digital inputs/outputs No Yes Yes
Auto config (voltage, frequency, phase system) Yes Yes Yes
Source priority Source 1, No priority Source 1/2, No priority Source 1/2, No priority
Manual re-transfer Yes Yes Yes
In-phase monitor (synchro check) Yes Yes Yes
Genset exercising: on-load, off-load Yes Yes Yes
In-built power meter module No No Yes
Load shedding No Yes Yes
Real time clock No Yes Yes
Event log No Yes Yes
Predictive maintenance No No Yes
Voltage and current harmonics measuring No Voltage Voltage, current
Field-mount accessories
Auxiliary contacts for position indication Yes Yes Yes
Digital input/output modules No Yes Yes
12-24 Vdc aux supply module for controller No Yes Yes
Communication modules No Yes Yes
Connectivity
Modbus RTU (RS-485) No Yes Yes
Modbus/TCP No Yes Yes
Profibus DP No Yes Yes
ProfiNet No Yes Yes
DeviceNet No Yes Yes
Ethernet IP No Yes Yes
Ekip Com Hub (monitoring via ABB AbilityTM: EDCS) No Yes Yes
For applications
Mains - Mains Yes Yes Yes
Mains - Generator (minimum size 40kVA) Yes Yes Yes
UL short circuit withstand ratings
Fused withstand and closing rating (WCR) Yes Yes Yes
Coordinated breaker WCR Yes Yes Yes
Time-based WCR No No Yes
Short-time ratings No No Yes
Feature comparison l
ON
ll
ON
Auto Alarm reset
AUTO
S1 S2
LOAD
l ll
Esc l
ON
ll
ON
AUTO
S1 S2
LOAD
l ll
Lamp test l
ON
Off load test ll
ON
Auto Alarm reset
On load test
Bypass time delay
Dropout ∆U / ∆f
Manual retransfer
Generator stop delay
4 min 30 s
∆U 5% / ∆f 5%
∆U 10% / ∆f 5%
∆U 15% / ∆f 10%
∆U 20% / ∆f 10%
S1 Failure delay [s]
S1 Return delay [min]
On Off
Auto config
Start Ok
Priority
No priority Source 1
In-phase monitor
Off On
AUTO
S1 S2
LOAD
l ll
TruONETM feature comparison
14 TR U O N E ™ TH E WO R L D ’ S F IR S T TR U E ATS
Additional information We reserve the right to make technical changes or modify the contents of this document without prior notice. With regard to purchase orders, the agreed particulars shall prevail. ABB Inc. does not accept any responsibility whatsoever for potential errors or possible lack of infor-mation in this document.
We reserve all rights in this document and in the subject matter and illustrations contained therein. Any reproduction, disclosure to third parties or utilization of its contents – in whole or in parts – is forbidden without prior written consent of ABB Inc.
abb.com/truone
ABB Inc.
Electrification Products 8155 T&B Boulevard Memphis, TN 38125
Customer Service: 800-816-7809 7:00 a.m. - 5:30 p.m., CST, Monday-Friday elec_custserv@tnb.com
Technical Support: 888-385-1221, Option 1 7:00 a.m. - 5:00 p.m., CST, Monday-Friday lvps.support@us.abb.com
We reserve the right to make technical changes or modify the contents of this document without prior notice. With regard to purchase orders and/or contracts, the agreed particulars shall prevail. ABB Inc. does not accept any responsibility whatsoever for potential errors or possible lack of information in this document.
We reserve all rights in this document and in the subject matter and illustrations contained therein. Any reproduction, disclosure to third parties or utilization of its contents - in whole or in parts - is forbidden without prior written consent of ABB Inc.
1S X
U
1B
-1
© Copyright 2019 ABB. All rights reserved.
Specifications subject to change without notice.
| Section 151. — MOBILIZATION - Electrical Upgrades |
| Section 151. — MOBILIZATION |
| Description |
| Payment |
| Section 01770. — CLOSEOUT PROCEDURES - Electrical Upgrades |
| 1. |
| 1.1 SUMMARY |
| A. This Section includes administrative and procedural requirements for contract closeout, including, but not limited to, the following: |
| 1. Inspection procedures. |
| 2. Project Record Documents. |
| 3. Operation and maintenance manuals. |
| 4. Warranties. |
| 5. Instruction of Government personnel. |
| 6. Final cleaning. |
| 1.2 FINAL COMPLETION |
| A. Before requesting final inspection for determining date of Final Completion, complete the following: |
| 1. Instruct Government personnel in operation, adjustment, and maintenance of products, equipment, and systems. |
| 2. Submit specific warranties, final certifications, and similar documents. |
| 3. Prepare and submit operation and maintenance manuals. |
| 4. Complete startup testing of systems. |
| 5. Clean up any waste material. |
| 1.3 OPERATION AND MAINTENANCE MANUALS |
| A. Assemble a complete set of operation and maintenance data indicating the operation and maintenance of each system, subsystem, and piece of equipment not part of a system. Include operation and maintenance data required in individual Specification ... |
| 1. Emergency Contacts: Include Contractor Emergency Contact Phone, Cell, and e-mail. |
| 2. Operation Data: Include emergency instructions and procedures, system and equipment descriptions, operating procedures, and sequence of operations. |
| 3. Maintenance Data: Include manufacturer's information, list of spare parts, maintenance procedures, maintenance and service schedules for preventive and routine maintenance, and copies of warranties and bonds. |
B. Organize operation and maintenance manuals into suitable sets of manageable size. Bind and index data in heavy-duty, three-ring, vinyl-covered, loose-leaf binders, in thickness necessary to accommodate contents, with pocket inside the covers to re...
| 1.4 WARRANTIES |
| A. Submittal Time: Submit written warranties on request of CO for designated portions of the Work where commencement of warranties other than date of Substantial Completion is indicated. |
| B. Organize warranty documents into an orderly sequence based on the table of contents of the Project Manual. |
| C. Provide additional copies of each warranty to include in operation and maintenance manuals. |
| 2. |
| 3. |
| 3.1 DEMONSTRATION AND TRAINING |
| A. Instruction: Instruct Government personnel to adjust, operate, and maintain systems, subsystems, and equipment not part of a system. |
| 1. Provide instructors experienced in operation and maintenance procedures. |
| 2. Provide instruction at mutually agreed-on times. |
| 3. Schedule training with Government, through CO, with at least seven day’s advance notice. |
| 3.2 FINAL CLEANING |
| A. General: Provide final cleaning. Comply with safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess materials on Government property. Do not discharge volatile, harmful, or dangerous materials into drainage sy... |
| Section 16400 - REMOTE MONITORING SYSTEM |
| Section 16401 - AUTOMATIC TRANSFER SWITCHES |
File details come from the government source that posted it. Updated .