This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) and RFI Log for the Loves Falls Bridge Repair project. The amendment, numbered A00001 with an effective date of August 3, 2026, incorporates Request for Information (RFI) responses into solicitation number 127EAW26Q0049, issued by the USDA Forest Service Procurement Operations, Construction and A-E Division West. The amendment addresses eight RFIs submitted by interested vendors and clarifies critical project specifications. Failure to use the revised documents and requirements will result in proposals being deemed non-responsive.
Key clarifications from the RFI responses include: FP-24 replaces FP-14 as the applicable paint specification; sandblasting is not required for surface preparation, with power tool cleaning (SSPC-SP 11) acceptable as an alternative due to project remoteness at approximately 4,700 feet elevation; the painting area is estimated at 26 square feet and does not require full dehumidification containment; compatibility testing timing is at the Contracting Officer's discretion once the contract is underway, with contractors permitted to conduct test-scale compatibility tests in-field or in their yard to meet the 60-calendar-day project completion timeline; and the FP-14 Paint System 3 in Table 563-1 is replaced with MPI #23 primer and MPI #15 intermediate and finish coats (equivalent to SSPC-Paint 23 and SSPC-Paint 24), though contractors may propose alternative MPI substitutions with compatibility verification in their submittals. All future RFI submissions must be directed in writing to the Contracting Officer at Gregory.Cunningham@usda.gov, with telephone requests not accepted.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
A00001
GREGORY L. CUNNINGHAM
The purpose of this amendment is to post RFI responses.
Attached is "127EAW26Q0049 - RFI Log" which are hereby incorporated into any subsequent contract award. Failure to use the revised documents and requirements revised within will result in your proposal being non-responsive.
USDA FOREST SERVICE
PROCUREMENT OPERATIONS
CONSTRUCTION AND A-E, DIVISION WEST
ALL INTERESTED VENDORS 127EAW26Q0049
1 2
08/03/2026
07/14/2026
Updated 8/3/2026 8:43
RFI # RFI Question Government RFI Response Notes
Drawing No. R-1748, General Notes, state Construction is to be per FP-14.
Solicitation Attachment 1 Statement of Work, Article 5.0 references FP-24.
Which is correct? FP-24 Replaced FP-14 and this contract will utilize FP-24
How do I get the planholders list for this project so I know who the prime contractors are
This office does not have the ability to track a plan holders list as this is a public solicitation and anyone can access the information
Will sandblasting be required prior to application of prime coat. Due to the remoteness of this project sandblasting for surface preparation is an option.
Power tooling would be a more viable option No Sandblasting is not required
FP-24, Section 563-09, paragraph (c), allows Power Tool Cleaning per SSPC-SP 11.
Can power tools (SP3) be used for surface preparation instead of sandblasting do to the remote location of the project. Yes
Can a QP1 & 2 certified painting subcontractors information be posted in an addendum as no planholders list for general contractors is avialable.
BrandSafway Services LLC 535 Watt Drive, Suite A, Fairfield , ca 94534. 707- 344-3489, Chief Estimator - Todd Anderson, tanderson@brandsafway.com. The Government would not supply planholders a list.
Per the Solicitation the work is to be completed in 60 calendar days after the notice to proceed. The duration it will take to finalize the contract and get submittals approved will put this project into late October 2026. This project is approximately at 4,700 feet in elevation. The temperatures and weather conditions in October and beyond will not be conducive to painting.
Dehumidification under full containment will not be an option due to the location of the work site. Please clarify how the painting will be performed during the winter months with cold conditions, snow, and rain.
The area of painting is estimated at around 26 SF and tenting and containment is for a very small area
( Shut down only for extreme winter or fire conditions may occur)
Per Section 563 Coatings of the Standard Specifications, Section 563.09 Structural Iron and Steel, Item b) Compatibility Test, states to verify that no indication of incompatibility exists at least 14 days after the application of each product. There is only 60 calendar days to complete this project with a 3 coat paint system it will take 42 days just for the compatibilty testing. With this requirement it doesn't seem like there will be enough time to complete the project. Will calendar days be added. Please clarify.
That is the sole discretion of Contractiring OFFICER once the contract is underway.
If the contractors schedule it they could conduct a test scale compatibility test in the field or their yard when they first remove the bent steel and meet the timeline.
Per Section 719.04 of the 2024 Standard Specifications under Table 719-1, Other Metals, Primer Coat is MPI # 107, Intermediate Coat MPI # 5 or # 6, Finish Coat MPI # 5 or # 6. Question: Can MPI # 18 (Primer,Zinc Rich, Organic)be used instead of MPI # 107 (Prime,Rustinhibitor,Waterbase). MPI # 5 and # 6 intermediate coat is for exterior wood not metal. Can MPI # 108 (Epoxy,High Build,Low Gloss) be used instead. MPI # 5 and # 6 finish coat is for exterior wood can MPI # 10 (Latex,Exterior Flat) be used instead. Yes subtitutions and compatibilty can be proposed in submittals
Replace thr FP-14 Paint System 3 in Table 563-1 with MPI#23 primer and MPI#15 intermediate and finish coats.MPI #23 paint is equivalent to SSPC-Paint 23, and MPI #15 is equivalent to SSPC-Paint 24.
PROJECT 127EAW26Q0049 - Loves Falls Bridge Repair
RFI responses will be responded to as necessary in amendment format which will be posted to the solicitation via beta.SAM.gov. All Request for Information (RFI's) shall be submitted ONLY to the Contracting Officer at Gregory.Cunningham@usda.gov, in writing using attached RFI log.
Telephone requests for information will not be accepted or returned