RFI Official Responses.pdf
PDF 121 KB Posted
- Solicitation number
- 127EAW23R0060
- Issued by
-
Department of Agriculture Forest Service
About this file
This document contains responses to requests for information (RFIs) related to solicitation number 127EAW23R0060 for repair of the Sandy Bar River Access Road. The United States Forest Service solicitation is for a project to recondition approximately 2,000 feet of road, including grading and pulling ditches. Per the RFI responses, the contractor may use water from the river for construction if a screened intake is used, no riprap will be provided by the Forest Service, disposal will be at a designated site, and the contractor can camp on site.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A00001 - RFI Responses.pdf | ||
| 2. Schedule.docx | DOCX document | |
| 3. Location Map, Drawings, General Notes.pdf | ||
| 7. Wet Weather Operations.pdf | ||
| 8. Davis-Bacon Act WD # CA20230007.pdf | ||
| 4. Project Specification List.pdf | ||
| 6. Fire Plan.pdf | ||
| 5. Supplemental Specifications.pdf | ||
| 127EAW23R0060 - Sandy Bar River Access Road Repair.pdf | ||
| 9. RFI Form.docx | DOCX document | |
| 1. Statement of Work.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR OFFICIAL USE ONLY
REQUEST FOR INFORMATION (RFI) OFFICIAL RESPONSES
127EAW23R0060 - Sandy Bar River Access Road Repair
RFI responses will be responded to as necessary in amendment format which will be posted to the solicitation via beta.SAM.gov
Telephone requests for information will not be accepted or returned.
RFI #1 – May Contractor use water from river for construction?
USFS Response – Yes, site will be designated by COR. Water drafting from stream requires a screen mesh. The screen mesh must be in good repair and present a sealed, positive barrier-effectively preventing entry of immature fish or other aquatic wildlife into the intake.
RFI #2 – Is there a FS Rip Rap site Available?
USFS Response – No, Rip Rap shall be furnished by contractor.
RFI #3 – Does the forest Service have a disposal site?
USFS Response – Yes, disposal site will be designated by COR.
RFI #4 – What is the total length of the job? Road Recondition, grading, pull ditch. Start and stopping point?
USFS Response – The length of the road to be treated is a distance of around 2,000 feet.
RFI #5 – What is the treatment for the large hole in the bottom.
USFS Response – No large holes to be treated.
RFI #6 – May contractor camp on site?
USFS Response – Contractor may camp on site.