1. Statement of Work - Revision 001.pdf
PDF 169 KB Posted
- Attached to
- 127EAW23Q0012 - Coffee Creek HVAC
- Solicitation number
- 127EAW23Q0012
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI Official Responses.pdf | ||
| A00002 - RFI responses.pdf | ||
| A00001 - Revised SOW.pdf | ||
| 5. Davis-Bacon Act WD # CA20230007.pdf | ||
| 4. Individual Project Technical Capability Questionnaire.docx | DOCX document | |
| 2. Schedule.docx | DOCX document | |
| 1. Statement of Work.pdf | ||
| 6. RFI Form.docx | DOCX document | |
| 3. Fire Plan.pdf | ||
| 127EAW23Q0012.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work USFS Coffee Creek Station
Heat Pump/Condenser and Air Handler Replacement
1.0 - Scope of Work
The purpose of this project is to replace the existing outdoor heat pump and interior air handler at the Coffee Creek Fire Engine Office with a new 14 SEER heat pump/condenser and interior air handler. The outdoor unit is very old and has developed a hole and will develop more from rub spots in the bottom of the coil. This is due to age, vibration, and from snow accumulating on top of the unit.
The existing condenser/heat pump currently sits below a roof valley on the stations metal roof that receives a large amount of snow during Winter months. The intent of this unit replacement will be to move approximately 10 feet away from the roof line, out into the yard. This will eliminate snow buildup originating from the roof.
Note all new systems shall be of the same manufacturer or as recommended by manufacturer for system compatibility and warranty purposes.
Contractor shall furnish all material, labor, equipment, and transportation as required to accomplish the repairs. All demolition, disposal, and repairs described herein, for bringing the unit back into service are the responsibility of the Contractor.
HEAT PUMP/CONDENSER AND AIR HANDLER UNIT REPLACEMENT
A) Mobilization
a. Mobilization shall include preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site;
for the establishment of facilities necessary for the work; for premiums on bond and insurance for the work; and for other operations performed or costs incurred before the beginning of work.
b. Fire plan preparedness. See Fire Plan attachment
c. The contractor will be responsible for the security of their equipment and materials, as well as for the general protection of the infrastructure and utilities that will be exposed to the contractor’s ingress/egress activity.
B) Removal, Site Preparation and Pad Installation
Work shall include but not necessarily limited to the following:
a. Disconnect/remove existing heat pump/condenser (and pad) and dispose per
County or State disposal requirements as applicable.
b. Disconnect/remove existing air handler unit and dispose per County or State disposal requirements as applicable.
c. Evacuate the refrigeration from existing refrigerant lines and protect lines for reuse.
d. Set location of excavation and pad preparation 10 feet from existing building roof line. Scarify, compact and level the existing grade at the receiving area for a 36” x 48” x3” thick composite pad, to 2” below existing grade. Furnish and install clean pea gravel to fill and compact the prepared new location and compact gravel pad with an overall dimension of 36”x48”x 2” thick, flush with adjacent grade.
e. Furnish and install 36”x48”x3” composite rubberized pad on prepared & compacted gravel pad. 36”x48” pad shall be Diversified #ACP36483 or
Government approved equivalent.
C) Furnish/Install 14 SEER Heat Pump & Air Handler
Work shall include but not necessarily limited to the following:
a. Furnish and install 12” high condenser/heat pump risers (4 each) to set upon pad to receive new heat pump/condenser unit.
b. Furnish and install one 3-ton 14 SEER, 240-volt outdoor heat pump/condenser unit and all new necessary electrical conductors, conduits and connectors, all new refrigerant lines and couplers and insulating equipment to extend to new location and connect with existing system supply and return lines and electrical systems as required for a complete and operational system.
c. Furnish and install new 3-ton 14 SEER air handler unit and all new necessary electrical conductors, conduits and connectors, all new refrigerant lines and couplers and insulating equipment to connect with existing system supply and return lines and electrical systems as required for a complete and operational system.
d. Extend 240 volt electrical work from the existing disconnect to the new locations and reconnect complete, matching existing current wire rating. Also, new control wiring shall be extended to new unit location and all connections made. All materials, installation and connections shall be meet current electrical and mechanical code requirements.
e. New copper line tubing and insulation extensions shall be connected to the existing refrigerant tubing from the building to the unit and shall be installed in 4-inch dia. galvanized steel conduit, approximately 10 feet in length (adjust as necessary to meet intent), to eliminate any damage that could be caused by exposure to external impacts (walking, lawn equipment, etc.). Furnish and charge with all new refrigerant materials (throughout building refrigerant system) and test for leaks, function and full system operation.
f. Provide one (1) year installation labor and materials warranty; and five (5) year manufacturer warranty on heat pump condenser equipment.
1.1 – Project Location
From Hwy 299 (Main Street) in Weaverville, CA, proceed north on Hwy 3 for approximately 38 miles to Coffee Creek Rd. and turn left. Proceed West on Coffee Creek Rd for 1 block. Turn left at South Derrick Flat Rd and Continue down for approximately 1,000 feet. The USFS Coffee
Creek Fire Station will be on the right at 100 South Derrick Flat RD, Trinity Center CA.
The Fire Engine Office is located nearest Derrick Flat Road.
1.2 – Government Furnished Property
All security aspects associated with contractor owned equipment and materials are not the responsibility of the Government. The Government assumes no liability whatsoever for
Contractor use of designated staging/laydown/overnight area. Contractor is solely responsible for the security of his/her possessions related to this project.
1.3 – Contractor Furnished Property and Submittals
Except as otherwise noted, the Contractor shall furnish all labor, materials, equipment, supervision, and transportation necessary for the successful completion of the work described in this contract.
1.4 - Utilities
Contractor shall be responsible for locating and protecting above and below ground utilities in the project area.
1.5 - Use of Utilities
Water and power is available on site and shall be coordinated with the Contracting Officer’s
Representative (COR) for access. Sanitary services may be available on a limited basis, subject to Fire Station personnel availability for building access. Cellular phone service is not available at this location.
1.6 – Protection of Existing Improvements
Existing pavement, buildings, landscaping, and other existing improvements shall be protected by the Contractor. The Contractor shall be responsible for repairing any damage to existing facilities and improvements.
1.7 – Disposal
All construction waste material shall be properly and legally disposed of off government land.
1.8 – Time of Completion
Work to be completed within 20 calendar days of Notice to Proceed (NTP) is received from the Contracting Officer.