SOW: Slater Butte Emergency Repairs (Revised September 7, 2021)
R5 / Klamath National Forest: Slater Butte Lookout Emergency Repairs
Description of Project and Objectives
General Project Statement
The project consists of completing emergency repairs to the Slater Butte Lookout, including:
1) Replace stairwell
2) Grout concrete footings
3) Replace the elevated walkway and railing at the top of the lookout.
Reconstruction shall match the materials/texture/paint color of the existing building. The FS will schedule a site visit for contractors before bids are due. Contractor is encouraged to submit questions to the Contracting Officer.
The FS will NOT supply the materials. The contractor is responsible for all materials, equipment and labor.
Photos:
Photo above: existing stairwell (right)
P h o t o a b o v e : e x i s t i n g s t a i r w e l l
SOW: Slater Butte Emergency Repairs (Revised September 7, 2021)
Photo above: exist ing footing ( typical )
P h o t o a b o v e : e x i s t i n g f o o t i n g
P h o t o a b o v e : e x i s t i n g w a l k w a y
P h o t o a b o v e : e x i s t i n g w a l k w a y