This document includes a schedule of items and statement of work for a federal construction contract solicitation. The solicitation seeks rehabilitation of fire roads on the Western Divide and Kern River Ranger Districts of the Sequoia National Forest, including mobilization, water supply, drainage excavation, roadway obliteration, aggregate base, roadway reconditioning, full depth reclamation, asphalt concrete pavement, pavement patching, culverts, catch basins, spillway inlets, and installation of a metal gate. The estimated value of the construction project is between $1,000,000 and $2,500,000. The solicitation is a total small business set aside. Questions for the contracting officer are due by July 28, 2021 and a pre-proposal site visit will be held. Offers are due by an unspecified date. The soliciting agency is the Department of Agriculture Forest Service.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART I – THE SCHEDULE
SECTION B – SCHEDULE OF ITEMS
Castle Fire Roads Rehabilitation Project Western Divide & Kern River Ranger Districts Sequoia National Forest
B- 1 - SCHEDULE OF ITEMS
PAY ITEM NO.
ITEM DESCRIPTION
UNIT
| METHOD OF MEASURE |
| TOTAL QUANTITIES |
UNIT PRICE
AMOUNT
| 15101 |
| Mobilization. |
| L.S. |
| L.S.Q |
| 1 |
| 17009 |
| Water Supply and Watering. |
| MILE |
| A.Q. |
| 111.32 |
| 20425 |
| Drainage Excavation, Type Critical Dip (Rolling |
Dip), Construct New as Shown on Drawings.
| Each |
| A.Q. |
| 45 |
21101 Roadway Obliteration, Method 2. Decommission segments as shown on the drawings and Construct Earthen Barriers at Entrance.
MILE
A.Q.
0.73
| 30104 |
| Aggregate Base, Grading 3/4 Inch Max, Type |
CalTrans Class 2 Base.
| Ton |
| A.Q. |
| 8922 |
| 30315 |
| Roadway Recondition, Compaction Method 2. |
| MILE |
| A.Q. |
| 111.32 |
| 30401 |
| Full Depth Reclamation, 2"-3" Existing Depth, 2" |
| MILE |
| A.Q. |
| 1.30 |
| 40301A |
| Hot Asphalt Concrete Pavement, Class 1/2" Max |
Medium, 3" compacted in place. Type 1 Caltrans
| Ton |
| A.Q. |
| 421 |
40301B Hot Asphalt Concrete Pavement, Caltrans Approved Class 3/8" Max Medium, 2" Overlay Compacted in Place. Type 1 Caltrans Approved.
Ton
41801A Asphalt Concrete Pavement Patching, Full Depth Patch Type 2 (with grindout) with Hot Asphalt Concrete Mixture 3/8" Asphalt. Type 1 Caltrans.
Ton
41801B Asphalt Concrete Pavement Patching, Partial Depth Patch Type 3 with Hot Asphalt Concrete Mixture 3/8" Asphalt. Type 1 Caltrans.
Ton
| 60201A |
| Corrugated Metal Pipe 18-Inch, 12ga, Furnish and |
Install, Compaction Method 2.
| L.F. |
| A.Q. |
| 30 |
| 60207A |
| Metal End Section 18-Inch, Furnish and Install on |
Culvert Inlet (Location on Drawings).
| Each |
| A.Q. |
| 38 |
| 60207B |
| Metal End Section 24-Inch, Furnish and Install on |
Culvert Inlet (Location on Drawings).
| Each |
| A.Q. |
| 19 |
| 60207C |
| Metal End Section 36-Inch, Furnish and Install on |
Culvert Inlet (Location on Drawings).
| Each |
| A.Q. |
| 8 |
| 60208 |
| Drop Inlet Metal Lid 36", Furnish and Install |
(Location on Drawings).
| Each |
| A.Q. |
| 3 |
| 60403 |
| Catch Basin, Enlarge Existing for Additional |
| Each |
| A.Q. |
| 12 |
| 60601A |
| Reset Existing 12" Type 2 Spillway Inlet Assembly |
with Flume and Anchor Stakes (Existing Location
| Each |
| A.Q. |
| 1 |
60601B Install 12" Type 2 Spillway Inlet Assembly 12 ga with Rectangular Corrugated 12" 16 ga Flume, Flex Neck 16 ga, Anchor Stakes, and Riprap, Complete
Each
60601C Install 24" Type 1 Spillway Inlet Assembly 12 ga with Rectangular Corrugated 24" 16 ga Flume, Flex Neck 16 ga, Anchor Stakes, and Riprap, Complete
Each
61902 Gate, 24-ft Wide Metal Pipe on 2 lane road, Full Installation of Government Furnished Gate (object markers & signs contractor furnished).
L.S.
L.S.Q
Total of ALL Items