A-6.0 127EAW21Q0013.pdf
PDF 232 KB Posted
- Solicitation number
- 127EAW21Q0013
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A-6.3 WD CA20210007, Mod 8, dated 04.23.2021.pdf | ||
| A-6.1 Specification.pdf | ||
| A-6.2 Project Plans.pdf | ||
| A-6 Questionnaire.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION FORMS
QUOTERS COPY
CONSTRUCTION
Issuing Office: Project Name and Location:
USDA-FS CSA Southwest #6 333 Broadway Blvd, SE Albuquerque NM 87102-3498
GAOA MDF Forest Wide Campground Water System Repairs
Modoc National Forest
Solicitation Number: 127EAW21Q0013 Issue Date: 6 May 2021 Due Date/Time: 27 May 2021 / 2:00 pm PT
IMPORTANT INFORMATION
1. This is a Request for Quote (RFQ).
2. All questions shall be submittted in writing. See page 5, Inquiries
3. Electronic transmission (email) is the only authorized method for submitting a quote for this solicitation. See page 5, Instructions for Preparation/Submission of Quotes for submission information.
4. If your quote is over $150,000.00 a bid guarantee will be required. In addition, there will be a requirement for payment and/or performance protection after award. If quote is between $35,000 and $150,000, payment protection will be required after award for 100% of the award price and be submitted within 10 days after contract award. If quote is over $150,000 performance and payment protection will be required for 100% of award price and be submitted within 10 days after contract award. See Section 00 72 00 for additional information.
5. Site visit information is can be found on page 12.
6. Ensure quote provides for the purchase and installation of all the mentioned items as well as basic design proposals, where applicable (lean-to, spring box design, etc.)
127EAW21Q0013
00 01 10 Table of Contents
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 – List of Attachments / Drawings 00 10 00 – Solicitation 00 21 00 – Instructions 00 24 00 – Procurement Scope 00 45 00 – Representations and Certifications 00 72 00 – General Conditions 00 73 00 – Supplementary Conditions
DIVISION 15 – MECHANICAL
01 51 01 – Mobilization 01 54 50 – Water Tank & Appurtenances 01 54 60 – Water Distribution Systems 01 54 70 – Spring Box 01 54 80 – Solar Pump System
SECTION 00 01 15 List of Attachments / Drawings Attachment Number Title Date Number of Pages
1 Specifications 18 2 Project Plans 19 3 Wage Determination CA20210007 04/23/2021 50
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
1032379
USDA-FS CSA SOUTHWEST 6
333 BROADWAY BLVD SE
ALBUQUERQUE NM 87102-3498
7EAW
Quotes must be submitted electronically to tracy.marino@usda.gov. See Instructions for Submission of Quotes on Page 5
TRACY MARINO 530-252-6410
GAOA
05/06/2021
127EAW21Q0013
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
GAOA Forest Wide Campground Water System Repairs
Modoc National Forest
Federal Acquisition (FAR)
Agriculture Acquisition Regulation (AGAR)
Specifications
Project Plans
General Wage Decision
NAICS: 221310
Size Standard: $30.0M
Set Aside: 100% Total Small Business
FAR 36.204 Disclosure of Magnitude: (c) between $100,000 and $250,000
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 60 calendar days and complete it within ________________ ________________ calendar days after receiving
52.211-10
05/27/2021
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
USDA-FS CSA SOUTHWEST 6
2550 RIVERSIDE DRIVE ROOM 174
SUSANVILLE CA 96130-4774
7EAW
TRACY L. MARINO
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
Unique Entity Identifier (DUNS) Number______________________________________
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 35
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
127EAW21Q0013
0001 GAOA MDF - Forest Wide Campground Water System
Repairs
See Schedule of Items
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
SECTION 00 10 - 00 - Solicitation
SCHEDULE OF ITEMS
ITEM
NO.
(A)
SCHEDULE OF SUPPLIES/SERVICES
(B)
QTY
(C)
UNIT
(D)
UNIT
PRICE
(E)
AMOUNT
(F)
15101-01 Mobilization 1 LS $ $
15450-01 Water Tank (replace as needed or specified, System No. 1831x2, 1832 most likely to need new tanks)
3 EA $ $
15450-02
Water Tank, Includes installation of base pad and all necessary materials for connection to solar pump system and/or distribution system (System No. 1808, 1876)
2 EA $ $
15450-03
Tank Plumbing & Appurtenances Repairs/Improvements (including vents, overflows, drains, valves, testing spigots, etc.) - All systems improved to meet drawings and specifications
8 EA $ $
15450-04 Lean-to for snow diversion from tank (System No. 1831x2, 1835) 3 EA $ $
15460-01 Repair/improve distribution system (System No. 1808, 1876) 2 EA $ $
15470-01
Spring Box Replacement/Improvement (as needed or specified, System No. 1808, 1831, 1844 most likely to need improvements)
3 SF $ $
15480-01 Disconnect, move and reinstall solar panels (System No. 1849) 1 LS $ $
15480-02 Purchase and install solar pump system, includes all necessary materials and labor for connection to system (System No. 1876)
1 LS $ $
Total
Schedule of Items is not a comprehensive list of work included in contract. Please reference Statement of Work and Specifications for work expected on each system.
Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 15101-01 Mobilization.
SECTION 00 21 - 00 - Instructions
If your quote is over $150,000.00 a bid guarantee will be required. In addition, there will be a requirement for payment and/or performance protection after award. If quote is between $35,000 and $150,000, payment protection will be required after award for 100% of the award price and be submitted within 10 days after contract award. If quote is over $150,000 performance and payment protection will be required for 100% of award price and be submitted within 10 days after contract award.
Site visit (see FAR 52.236-27, Page 12)
Quote incorporates all amendments and Q&A's (if any) that have been posted to beta.sam.gov. Submit quotes by the date and time stated in Block 13a or as amended.
Inquiries
Any prospective quoter desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing, not later than 4 business days before the closing date, to allow a reply to reach all prospective quoters before submission of their quotes. Oral explanations or instructions given before the award of a contract will not be binding. In no event shall failure to inspect the site constitute grounds for a claim after contract award. Requests for explanation or interpretation of the solicitation, drawings, specifications, etc. should be submitted by email to Tracy Marino at tracy.marino@usda.gov.
Instructions for Submission of Quotes
(a) Submit signed and dated quotes to the office specified in this solicitation at or before the exact time specified in this solicitation. Quotes should be submitted via the Schedule of Items plus Technical Response documents of the Quoter's design as specified in the solicitation. Quotes shall be submitted in two parts (technical and price). Each part shall be separate and complete in itself so that evaluation of one may be accomplished independently of the other.. As a minimum, quoters must show:
(1) Pricing and Contact Information (use SF 1442 and Schedule of Items (Section 00 10 00)). This should be considered as your price submission)
(2) Acknowledgment of any Solicitation Amendments (use SF 1442);
(3) Response to non-price evaluation factors (see Section 00 21 00, Evaluation).
(4) All applicable fill-in provisions. For solicitations issued on an SF 1442, this would include Section 00 45 00.
(b) Late submissions, modifications, revisions, and withdrawals of quotes. Quoters are responsible for submitting quotes, and any modifications, revisions, or withdrawals, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. Quotes received after the designated time may not be considered if the Contracting Officer has begun the evaluation process.
(c) System for Award Management (SAM). To be considered for award all Quoters must be successfully registered in the SAM database (www.sam.gov) AT THE TIME A QUOTE IS SUBMITTED. See FAR Clause 52.204-7, System for Award Management, as applicable for requirement information. Contractors shall have representations and certifications completed in www.sam.gov OR provide FAR clause 52.204-8, Annual Representations and Certifications, with paragraph (c) completed. If completing the aforementioned clause, provide with submitted quote.
d) Unique Entity Identifier (formerly Data Universal Numbering System (DUNS) Number. Place the annotation "Unique Entity Identifier" as well as Electronic Funds Transfer (EFT indicator, if applicable (formerly DUNS+4)" next to your name and address on the first page of your quote. The EFT indicator is a four-character suffix to the mailto:tracy.marino@usda.gov http://www.sam.gov/ http://www.sam.gov/ unique entity identifier. The suffix is assigned at the discretion of the Quoter to establish additional SAM records for identifying alternative EFT accounts (see subpart 32.11) for the same entity. If the Quoter does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for unique entity identifier establishment directly to obtain one. The Quoter should indicate that it is a Quoter for a Government contract when contacting the entity designated at www.sam.gov for establishing the unique entity identifier.
(e) Electronic Submissions
(1) Quoters must submit electronic responses this solicitation. Email quotes to tracy.marino@usda.gov. Please limit the size of your file to 5 MB or less; more is not always better, so please be concise. Include the solicitation number in the subject line of the email. Files in Adobe Acrobat are the preferred file type; other types may be accepted but the quoter may be required to change type if the Government cannot open the attachment.
(2) If any portion of a quote received by the Contracting Officer is unreadable to the degree that conformance to the essential requirements of the solicitation cannot be ascertained from the document--
(i) The Contracting Officer immediately shall notify the quoter and permit the quoter to resubmit the quote.
(ii) The method and time for resubmission shall be prescribed by the Contracting Officer after consultation with the quoter; and
(iii) The resubmission shall be considered as if it were received at the date and time of the original unreadable submission for the purpose of determining timeliness, provided the quoter complies with the time and format requirements for resubmission prescribed by the Contracting Officer.
(3) Facsimile Submissions will not be accepted.
(4) Hard Copy Submissions will not be accepted
Basis for Award
(a) Award will be made using the Simplified Acquisition Procedures in accordance with FAR Part 13 to the Quoter whose acceptable quote provides the best value to the government considering price and non-price factors. The Government intends to do a comparative analysis of quotes and award a contract without communication with Quoters. Therefore, Quoter's initial response should contain the best terms from a price and technical standpoint.
The Government reserves the right to communicate if later determined by the Contracting Officer to be necessary.
The Government may reject any or all quotes if such action is in the public interest (i.e., cost prohibitive); accept other than the lowest-priced quote; and waive informalities and minor irregularities in quotes received. If a quote is rejected, it will not be considered for award.
(b) To be determined responsible, a prospective contractor must --
(1) Have adequate financial resources to perform the contract, or the ability to obtain them;
(2) Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments;
(3) Have a satisfactory performance record. A prospective contractor shall not be determined responsible or non-responsible solely on the basis of a lack of relevant performance history;
(4) Have a satisfactory record of integrity and business ethics;
(5) Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors).
mailto:tracy.marino@usda.gov
(6) Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them;
and
(7) Be otherwise qualified and eligible to receive an award under applicable laws and regulations.
Evaluation
(a) Acceptability of Quote - The Government will determine the acceptability of each quote on a pass or fail basis considering the following factors. Quotes that fail any of these elements will not be considered for award.
(1) A quoter takes exception to the any of the terms and conditions of the RFQ, including attachments.
(2) A quoter is not currently registered in the System for Award Management (SAM) by the closing date of the solicitation.
(3) A quoter cannot be verified as a Small Business as shown in SAM or other proof as submitted by the quoter.
(4) An incomplete quote that lacks sufficient information for the government to perform a technical evaluation to determine acceptability.
(5) A quoter failed to acknowledge a material amendment; and
(6) not furnishing prices for each item listed in the Schedule requiring a unit price. If the quoter fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. Should any mathematical check made by the Government show a mistake in the extended amount quoted, the corrected unit price extension shall govern. If a quoter omits both the unit price and the extended amount or estimated amount for any item, its quote shall be declared unacceptable and therefore ineligible for award. Pricing must be submitted for all items. If the quoter does not intend to charge for a bid item, a price of "0" or "No Cost" should be shown.
(b) Capability of the Quoter - The Government will assess the capability of each quoter based on the following criteria 1) Understanding of the Government's requirement; 2) Organizational Experience; and 3) Organizational Past Performance. The Government will not assess capability on a pass/fail basis but will use its assessments of capability as a basis for comparing quoters to determine best value. Quoters are encouraged to provide their response using the attached Questionnaire. Since the Contracting Officer is considering price and other factors, award may be made to other than the lowest-priced quote.
1) Understanding of the Government's Requirements. The Government will evaluate each quoter's relative understanding of the Government's requirement on the basis of its written response addressing the following subfactors: a) any information that indicates the extent to which the site for this project was visited; b) the results concluded from the site visit; c) the resources (personnel and equipment) which are planned for use on the project and how realistic that plan is given concurrent obligations. Discuss any subcontractors and their background and capability; d) site specific safety plan (safety plan for this specific project shall address, among other things, a communications plan, egress of injured workers and protection of the public and Government personnel); e) plan of work to include the major tasks and timelines; and where applicable, estimated production rates.
2) Organizational Experience. Experience is the opportunity to learn by doing. The Government will evaluate each quoter's organizational experience based on its breadth, its depth, and its relevance to the work that will be required under the prospective contract. The Government will not evaluate an quoter's organizational experience on the basis of the personal experience of the quoter's key personnel. However, the Government will consider the extent to which the quoter's key personnel have worked together in the past. The Government will evaluate the organizational experience of the quoter's proposed key subcontractors
3) Organization Past Performance. Past performance is a measure of the degree to which an quoter satisfied its customers in the past and complied with Federal, state, and local laws and regulations. The Government will contact some of each Quoter's customers to ask whether: (1) quality services were performed; (2) the quoter was committed to customer satisfaction; (3) the quoter stayed within contract cost; (4) the quoter was reasonable and cooperative during performance; and (5) met contract performance time. In evaluating past performance, the Government will contact some of the references provided by the offeror and other sources of information, including, but not limited to: Federal, state, and local government agencies, better business bureaus, published media, and electronic data bases.
c) Price. Quoters shall submit a price quote for this project by utilizing the Schedule of Items. It is the Government's intent to assess the unit prices to determine reasonableness and Quoter's understanding of the work and ability to perform the contract.
(d) Options (if any). The Government will evaluate quotes for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that a quote is unacceptable if the option prices are significantly unbalanced. Evaluation of options will not obligate the Government to exercise the option(s). Options may either be exercised at time of award or a later date.
(e) A written notice of award or acceptance of a quote, furnished to the successful quoter within the time for acceptance specified in the quote, shall result in a binding contract without further action by either party. Before the quote's specified expiration time, the Government may accept a quote (or part of a quote), whether or not there is communication after its receipt, unless a written notice of withdrawal is received before award. The Government intends to offer award to the single quoter whose price quote and technical response offer the best value combination to the Government.
Quote Submission Checklist
All information required by the terms of the solicitation must be furnished. Important items for you to check are included in but not limited to, those listed below, so ensure you read the solicitation carefully. This checklist is furnished only to assist you in submitting a proper quote and need not be returned. Check as you read.
Have you acknowledged all amendments? Acknowledge all amendments on the reverse side of the SF 1422 (Solicitation, Offer and Award), Block 19
Have you completed SECTION 00 45 00, REPRESENTATIONS & CERTIFICATIONS portion of the solicitation package?
Is your quote properly signed?
If a bid guarantee is required, is it included with your quote? (A late bid guarantee is treated the same as a late quote)
Is your bid guarantee in the proper amount? See FAR 52.228-1
If your bid guarantee is in the form of a bid bond, is the bond properly signed by both the bidder and surety and are all required seals affixed? Does the scanned copy show enough detail to verify its initial validity?
Is the name in which you submitted the bid the same on your bid as on your bid bond?
Have you entered a unit price for each bid item and does that unit price contain two decimal places?
Are decimals in unit prices in the proper places? Are your figures legible?
Are the extensions of your unit prices, and your total amount price correct?
Are all erasures or corrections initialed by the person signing the bid?
I have not restricted my bid by altering the provisions of the solicitation?
Have you provided a response to the Evaluation Criteria (use of Questionnaire is encouraged)?
Are your Price and Technical two separate documents?
Will your quote arrive on time?
52.204-7 System for Award Management. (OCT 2018)
52.222-5 Construction Wage Rate Requirements-Secondary Site of the Work. (MAY 2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of provision)
52.222-23 Notice of Requirement for Affirmative Action To Ensure Equal Employment Opportunity for Construction. (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
6.8%
Goals for female participation for each trade
6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled Affirmative Action Compliance Requirements for Construction, and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the-
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the covered area is CA Lassen; CA Modoc; CA Plumas; CA; Shasta; CA Siskiyou; CA Tehama..
(End of provision)
52.225-10 Notice of Buy American Requirement - Construction Materials. (MAY 2014)
(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American-Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225- 9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers. (1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested-
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of provision)
52.228-1 Bid Guarantee. (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of provision)
52.236-27 Site Visit (Construction). (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigation and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
Name: Roxanne Reimer
Address: Various locations. All water systems are accessible without prior approval.
Telephone: For more detained directions for arriving at each water system an email may be sent to roxanne.reimer@usda.gov
(End of provision)
52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
https://www.acquisition.gov/browse/index/far (Federal Acquisition Regulation) https://www.dm.usda.gov/procurement/policy/agar.htm (Agriculture Acquisition Regulation)
SECTION 00 24 - 00 - Procurement Scopes
INTRODUCTION
Modoc National Forest has 14 recreation sites with water systems. While two of the systems (Ambrose and Medicine Lake) have large tanks filled using a generator-run pump, the majority have small (between 1000 and 3000 gallon) plastic tanks filled from springs, artesian wells, or solar wells. Most of the systems function well and are able to fulfill the purpose they serve. However, differing construction dates, different engineers, lack of funding and lack of significant issues with the systems has led to a large variance in their design as well as a variety of make-shift plumbing solutions. Many tanks lack a proper vent, overflow or drain or have other small issues.
The objective of this contract is to repair or improve each system, so it is in line with a standard design. Although there will be slight differences between systems based on water sources (spring vs. well), water flow rates, usage and other factors, the goal is for each system to have the same basic design. For most systems, this can be accomplished with a minimum amount of work, for example, adding a vent or improving the tank drain. A couple of systems will need slightly more repairs, for example, installing a new tank or relocating solar panels. Two of the systems (Patterson Campground and Willow Creek Campground) will need extensive work as described in the Statement of Work. Repair of distribution systems is not included for most sites in this contract and is noted in the statement of work where required.
STATEMENT OF WORK & REQUIRMENTS
Furnish all labor, materials, equipment and other incidentals necessary to complete each of the following items at the listed water systems:
1808 PATTERSON CG
System description:
Patterson Campground Water System is a spring fed water system feeding both the campground and the guard station. It was not in use during 2020 and in need of extensive repairs and improvements.
Work items:
Remove and replace current spring box and connect to system. Suggested spring box design is attached; however, contractor may present alternate proposals for design or repair of current spring box given the proposal provides increased functionality or cost savings. Finished product must be functional, secure, lockable, and prevent the entry of runoff or other contamination.
Purchase and install tank a minimum 1000-gallon tank similar to other systems. Purchase and install any needed materials or products for installation of tank and appurtenances to specifications. New concrete pad may be necessary; however, contractor may make other proposals. New tank and its appurtenances shall be in line with drawings and specifications. Exact tank location will be proposed by contractor and approved by a Forest Service representative. Location must provide sufficient system pressure for gravity-fed distribution system to consistently comply with state and local standards.
Remove and replace distribution system in order to restore functional and safe water service to campground faucets and to the guard station. This includes replacement of pipes, fittings, faucets, valves, valve boxes, drains, etc. as needed. All distribution system components shall be placed at a bury depth proper for an average usage season from early May to late October. The guard station shall be connected to the water system as well as all campground faucets. Current distribution system components may be used if still in good repair, within specifications and functioning properly. A pressure test will be required to prove distribution system functionality.
1830 STOUGH RESERVOIR CG
System description:
Stough Reservoir Water System is a spring-fed system flowing into a 1000-gallon plastic tank. It feeds the campground which has one section close to the tank and a second section across the reservoir. The tank and distribution system are in good repair.
The tank needs small plumbing improvements. Currently it has no bypass, meaning water continues to flow through the tank even when the system is shut down. The overflow is improperly sized and allows the tank to overfill and water to come in contact with lid and seep out sides. The inlet and vent are not to specifications. The drain is not to specifications.
Work items:
Complete any work needed for tank and appurtenances to match drawings and specifications (Including but not limited to installation of new vent on top of tank, replacement of overflow with larger sized pipe installation of testing faucet, improvement of drain), see drawings and specifications for details.
1831 CAVE LAKE CG
System description:
Cave Lake Water System is a spring fed system feeding a 1000-gallon tank above Cave Lake Campground as well as a 1000-gallon tank above Lily Lake Day Use Area. A solar pump system is used to pump water from the Cave Lake system to the Lily Lake tank. The distribution system was recently replaced and is in good repair. The spring box is in poor repair and allows runoff to easily enter, creating a risk of contamination. Both tanks caved in during the winter (due to snow and/or negative pressure in the tanks) and will need to be replaced.
Work items:
Remove and replace current spring box and connect to system. Suggested spring box design is attached; however, contractor may present alternate proposals for design or repair of current spring box given the proposal provides increased functionality or cost savings. Finished product must be functional, secure, lockable, and prevent the entry of runoff or other contamination.
Purchase and install new tank and all necessary products and materials for tank and appurtenances to fit drawings and specifications.
Construct a lean-to over each of the two tanks to divert snow and prevent collapse. Design of lean-to is at the discretion of the contractor and must be presented to a Forest Service representative before construction. Lean-to must be structurally sound and able to resist winter conditions. They must prevent snow from accumulating on top of tank and must divert snow such that it does not push against sides of tank. Lean-to must not interfere with the functionality of or access to the water system.
1832 PEPPERDINE CG
System description:
Pepperdine Campground Water System is a spring fed system feeding into a small fiberglass tank. The system feeds one faucet at the Pepperdine Campground and several faucets at the Pepperdine Equestrian Campground. The current tank is still functioning, however is beyond its reasonable lifetime and shall be replaced. The distribution system is in good repair.
Work items:
Remove and replace tank with a 1000-gallon polyethylene tank of similar design to other systems. Purchase and install any needed materials or products for the tank's installation. Installation of new concrete pad is included. New tank and appurtenances shall be in line with drawings and specifications.
1833 MILL CREEK FALLS CG
System description:
Mill Creek Falls Campground Water System is a spring-fed system feeding into a 1000-gallon plastic tank. The entire system was recently replaced and is in good repair. However, the plumbing on the tank is not to specifications and lacks a proper vent and overflow. The system contains a water meter to measure flow to the campground, however it was installed such that it measures the flow of the spring rather than the flow to the campground.
Work items:
Complete any work needed for tank and appurtenances to match drawings and specifications (Including but not limited to installation of new vent on top of tank, installation of overflow line, drain maintenance, etc.) see drawings and specifications for details.
1834 BLUE LAKE CG
System description:
Blue Lake Campground Water System is a solar well pumping into a 3000-gallon plastic tank. It feeds the Blue Lake Campground. The entire system is in good repair.
Work items:
Inspect system and complete any work needed for tank and appurtenances to match drawings and specifications. System should need little to no work.
1835 SOUP SPRINGS
System description:
Soup Springs Water System is a solar well pumping into a 1000-gallon plastic tank. It feeds the Soup Springs Campground. The entire system is in good repair; however, the tank has previously caved in, likely due to the weight of snow. The tank is not expected to need to be replaced.
Work items:
Inspect system and complete any work needed for tank and appurtenances to match drawings and specifications.
Construct a lean-to over tank to divert snow and prevent collapse. Design of lean-to is at the discretion of the contractor and must be presented to a Forest Service representative before construction. Lean-to must be structurally sound and able to resist winter conditions. It must prevent snow from accumulating on top of tank and must divert snow such that it does not push against sides of tank. Lean-to must not interfere with the functionality of or access to the water system.
1842 CEDAR CREEK
System description:
Cedar Creek Water System consists of a well with an electric pump. It feeds the nearby bathrooms, the ski lodge and 2 faucets near the Cedar Creek Trailhead. The system is in good repair. The faucet nearest the trailhead does not currently function, but the system is in need of no other repairs.
Work items:
Complete any needed repairs to restore functionality to the faucet nearest the trailhead.
1843 EAST CREEK
System description:
East Creek Water System is a solar well pumping into a 1000-gallon plastic tank. Although the system has had no significant issues in functionality, the plumbing is not to specifications and in need of repair. The campground contains horse corrals and as such, the tank overflow runs into a trough for horses. The drain is buried and needs to be dug out and brought up to specifications.
Work items:
Complete any work needed for tank and appurtenances to match drawings and specifications (Including but not limited to installation of new vent on top of tank, drain improvements, valve box installation, etc.) see drawings and specifications for details. Tank overflow shall remain routed to horse trough rather than to drain.
1849 RED TAIL RIM
System description:
Red Tail Rim Water System is a solar well pumping into a 1000-gallon plastic tank serving the trailhead as well as the nearby Ash Creek Campground. The overflow is routed to a horse trough. The tank currently has a float switch installed which prevents water from entering the trough as well as preventing water circulation when water demand is low. The solar panels are located on top of the vault toilet and are shaded by nearby trees for a large percentage of the day preventing sufficient pumping.
The combination of these issues means poor water circulation and the system often tests positive for coliform. The tank also lacks a drain and a vent.
Work items:
Remove and dispose of all components of float system to enable water to flow into trough from overflow.
Complete any work needed for tank and appurtenances to match drawings and specifications (Including but not limited to installation of new vent on top of tank, installation of drain valve and daylight drain, etc.) see drawings and specifications for details. Tank overflow shall remain routed to horse trough.
Uninstall solar panels and reinstall on posts in less shaded area east of tank, reconnect to water system. Specific location shall be indicated by Forest Service Representative.
1876 WILLOW CREEK CG
System description:
Willow Creek Campground Water System is currently an artesian well system serving both the campground and the nearby day use area. The system currently does not have a tank. In recent years the pressure of the artesian well has decreased and the system no longer has sufficient operational pressure. The campground contains two faucets that are in good repair, however distribution system drains are not to specifications and could pose a contamination risk. Valve boxes are pieces of culvert and drains currently drain directly into the valve box. Distribution system pipes in the campground and day use area may need repair as well. The branch of the distribution system feeding the day use area has been shut off due to lack of pressure. The day use area currently contains multiple faucets, almost all of which are damaged.
Work items:
Purchase and install tank a minimum 1000-gallon tank similar to other systems. Purchase and install any needed materials or products for installation of tank and appurtenances to specifications. New concrete pad may be necessary; however, contractor may make other proposals. New tank and its appurtenances shall be in line with drawings and specifications. Exact tank location will be proposed by contractor and approved by a Forest Service representative. Location must provide sufficient system pressure for gravity-fed distribution system to consistently comply with state and local standards.
Purchase and install solar pump system and any accessories necessary for the installation of the pump in the well and the connections to pump the water into the newly installed tank. Location of solar panels must provide sufficient sunlight for proper functioning of solar pump.
Locate, remove and replace campground distribution system. All valves shall be in valve boxes and all make-shift valve boxes shall be removed and disposed. Drains shall follow specifications and shall not drain into the valve box. Components of the current distribution system may be reused if proven to be undamaged and consistent with AWWA standards. A leakage test must be performed.
Locate, remove and replace day use area distribution system. Drains shall follow specifications and shall not drain into the valve box. Components or sections of the current distribution system may be reused if proven to be undamaged and consistent with standards. A leakage test must be performed. Day use area shall have one faucet near the vault toilet; however, no water line shall pass within 10 feet of the toilet vault. All other faucets shall be removed and disposed. Lines to faucets shall be capped properly to prevent stagnant water in dead ends. Unneeded pieces shall be removed and disposed of.
1800 AMBROSE WATER SYSTEM
System description:
Ambrose Water System is one of Modoc National Forest's comparatively large water systems. It consists of a diesel electric generator to run the pump. Water is pumped into a 10,000-gallon tank which provides water to the Howard's Gulch Campground south of the tank. The tank is old, however, has not had any large issues. The tank currently does not have a drain, meaning that for it to be emptied, the faucets at the campground must be opened. The campground distribution system is in good repair.
Work items:
Inspect tank and appurtenances for any damage or needed work. Present report to Forest Service representative with suggested course of action and expected timeline for needed repairs. Significant work on tank or tank replacement will not be included in this contract, however, contractor should specify what work is needed, how immediate the need is, and provide a cost estimate.
Install testing spigot to allow water samples to be taken directly from tank.
Install proper drain on tank to allow for tank to be emptied directly at the tank. Ensure all vents, drains and other openings are properly screened to prevent entry of animals or debris.
Install gauge allowing operator to determine water level without climbing tank and opening hatch.
Ambrose tank construction is significantly different from smaller water systems and is not expected to follow drawings.
1829 MEDICINE LAKE
System description:
Medicine Lake Water System is on of Modoc National Forest's largest water systems. It consists of a diesel electric generator to run the pump.