Attachment A Statement of Work - Los Prietos Tree Removal Oct 2024.pdf

PDF 2 MB Posted

Attached to
Tree Trimming at Los Prietos Ranger Station, Santa Barbara
Solicitation number
127EAT25Q0006
Issued by

About this file

This Statement of Work (SOW) outlines requirements for tree trimming and removal services at the Los Prietos Santa Barbara Ranger District trailer park for the USDA Forest Service. The period of performance is November 8-22, 2024.

The scope includes removing/trimming 24 hazard trees near residential structures and roads, with specific work at 17 trailer locations including: trimming trees around low-voltage power lines in the greenbelt area, removing dead/hazardous limbs overhanging structures, felling designated hazard trees, and ensuring 14-foot clearance above roads for emergency vehicle access. The contractor must obtain a certified arborist inspection before work begins, maintain proper licensing/insurance/certifications, and follow safety protocols regarding fire prevention and hazardous materials handling. Debris may be stacked or chipped on-site in designated areas, with daily cleanup required. No government-furnished materials will be provided, and the contractor is responsible for security of their equipment as there are no gates or security at the site.

View the file

Other files

File Type Posted
Attachment B Wage Determination.pdf PDF
127EAT25Q0006.pdf PDF
Attachment C Past Performance Questionnaire.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Statement of Work Los Prietos Santa Barbara Ranger District Trailer Park Tree Trimming and Removal

Contents Project General Information

1.0 Scope of Work

2.0 Background

Contractor Requirements

3.0 Technical Requirements / Tasks

4.0 Government Furnished

5.0 Deliverables / Schedule

6.0 Travel

7.0 Contractor’s Key Personnel

8.0 Security Requirements

9.0 Data Rights

10.0 Section 508 – Electronic and Information Technology Standards Attachments (Including photos and Trailer Park Layout)…………………………………………………………….…………………………………. Pages 5-15

Project Los Prietos Santa Barbara Ranger District Trailer Park Tree Trimming and Removal

Period Of Performance: 8 November 2024 to 22 November 2024.

General Information

1.0 Scope of Work

Remove and/or substantially trim 24 hazard trees to remove dead/hazardous limbs overhanging structures or roads.

Hazard trees will be marked with colored tape prior to bids for identification.

2.0 Background

Los Prietos trailer park is an employee housing area. There are numerous dead/damaged/dying trees that are in close proximity to residences and/or heavily trafficked areas. These issues need to be resolved to prevent property damage and/or injury/loss-of-life.

Contractor Requirements

3.0 Technical Requirements / Tasks

Beginning at the ‘Y’ in the trailer park and moving counter-clockwise:

1) Trim trees around low-voltage power lines in center of the greenbelt area. There are multiple trees of concern.

2) Trim one tree in the vicinity of trailer #2. The tree is overhanging low-voltage power lines.

3) Trim or fell tree between trailer #5 and road.

4) Trim two trees between trailers #6 & 7.

5) Trim dead limbs from one tree overhanging the rear of trailer #7.

6) Fell hazard tree to the northwest of trailer #7.

7) Cut back thick branches to north of trailer #9 that threaten to fall on septic tanks.

8) Fell tree at southeast corner of trailer #12.

9) Trim limbs on both sides of trailer #13.

10) Trim limbs overhanging shed on trailer #14.

11) Trim limbs at south side of trailer #15.

12) Trim/shape limbs on north side and trim overhanging limbs on south side of trailer #16.

13) Trim limbs on east side, remove weight on tree to southwest side and fell tree next to front entrance on the south side of trailer #17.

Note: Rounds and limbs may be stacked and left on site. Chipped materials may be left in designated areas, as assigned by the CO or COR, on site.

All roads, driveways, yards and living areas shall be cleaned of debris, limbs, leaves, sawdust and other detritus from the work after every workday.

3.1 Technical Requirements

Prior to work, the Contractor shall enlist the services of a certified arborist, or should the Contractor employ or have a certified arborist associated with the company, have the arborist perform an inspection and provide the Contractor and the Government an assessment as to which trees should be addressed to mitigate and/or prevent damage to residential or government buildings and infrastructure. This report shall also include an inspection of powerlines, telephone lines and any above-ground service cables, wires or infrastructure (laundry building, fire stanchions, septic tank covers, etc.) to assess the need of trimming/felling any lines that present a hazard by falling, due to wind or weather effects, or any possibility of causing damage.

3.2 Technical Requirements

Contractor and any subcontractor(s) shall be licensed, certified, and insured and will provide copies of said current documentation upon acceptance of bid. Expired or no licenses, certifications, and/or insurance, will result in nullification of bid and contract.

3.3 Technical Requirements

Due to substantial fuels, dried/dead foliage and other flammables at the project site, no open flames or smoking is allowed.

Hazmat, e.g., gasoline, oil, flammable or inorganic fluids, will be stored and used (fueling chainsaws, etc.) over appropriate barriers as in non-permeable tarps, troughs or other containment system to prevent soil contamination. At least one fire extinguisher shall be kept onsite.

4.0 Government Furnished

No Government furnished materials or supplies will be available on this project.

5.0 Deliverables / Schedule

N/A

6.0 Travel

N/A

7.0 Contractor’s Key Personnel

N/A

8.0 Security Requirements

There are no gates or security at the job site. Any equipment, vehicles or possessions are the responsibility of the contractor. The Government assumes no responsibility for theft, damage or loss of the contractor’s property.

9.0 Data Rights

N/A

10.0 Section 508 – Electronic and Information Technology Standards N/A

Attachments

Maps and Tree Locations:

Overview of site

Trailer Park Layout

Trailer Park

Tree Locations:

Trailer #9:

#6 #5 #4 #3 #2 #1

#7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17

Not to Scale

N

Laundry

Trailer #13:

Trailer #5:

Trailer #11

Approximate power line location:

Power Lines Position is approximate

Item #1 Looking southwest from inside trailer park road on the Highlighted tree near power lines needs trimming.

Item #2 Trim tree in vicinity of trailer space #2. The tree is overhanging low voltage power lines.

Reference trailer for location in lower right of picture. This is from the road facing west.

Paradise Road heading towards ranger station

Item #3.

Trim or fell tree between trailer space #5 and road.

Item #4 Trim two trees between trailer spaces #6 & 7.

Note picnic bench and recycle bins for location reference.

Item #5 Trim dead limbs from one tree overhanging the rear of trailer #7

Item #6 Fell hazard tree to the NW of trailer space #7.

Item #7 Cut back branches to the north of trailer space #9.

Item #8 Fell tree at SE corner of trailer space #12

Item #9 Trim limbs on both sides of trailer space #13

Item #10 Trim limbs overhanging shed on trailer space #14.

Item #11 Trim limbs at the south side of trailer space #15

Item #12 Trim limbs on the north and south sides of trailer space #16

Item #13 Trim limbs overhanging the road to at least 14’ above road at entrance and throughout the trailer park. This will allow engines to maneuver without hinderance. Remove weight on tree to SW side and fell dead tree next to the front entrance on the south side of trailer space 17.

Project
General Information
1.0 Scope of Work
2.0 Background
Contractor Requirements
3.0 Technical Requirements / Tasks
3.1 Technical Requirements
3.2 Technical Requirements
3.3 Technical Requirements
4.0 Government Furnished
5.0 Deliverables / Schedule
6.0 Travel
7.0 Contractor’s Key Personnel
8.0 Security Requirements
9.0 Data Rights
10.0 Section 508 – Electronic and Information Technology Standards