127DF520R0006 NFiTX SO Grounds Maintenance.pdf

PDF 916 KB Posted

Attached to
Grounds Maintenance at Supervisor's Office, National Forests and Grasslands in Texas
Solicitation number
127DF520R0006
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUMIS CHECKED

CODE 18a. PAYMENT WILL BE MADE BY

CODE

FACILITYCODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

OFFEROR

7DF5 CODE 16. ADMINISTERED BYCODE

X

X

X

561730

SIZE STANDARD:

100.00 % FOR:SET ASIDE:UNRESTRICTED OR

RFPIFB

10. THIS ACQUISITION ISCODE

RFQ

14. METHOD OF SOLICITATION

13b. RATING

NAICS:

SMALL BUSINESS

03/31/2020 1500 CT

03/17/2020

601-965-1639NICHOLAS VOZZO

(No collect calls)

INFORMATION CALL:

FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME

4. ORDER NUMBER3. AWARD/ 6. SOLICITATION

127DF520R0006

5. SOLICITATION NUMBER

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF

1 49 995585OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

TELEPHONE NO.

17a. CONTRACTOR/

LUFKIN TX 75904

2221 N RAGUEST STREET

NATIONAL FORESTS IN TEXAS

USDA FOREST SERVICE

15. DELIVER TO

9. ISSUED BY

7.

2. CONTRACT NO.

EFFECTIVE DATE

$8.00

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

ISSUE DATE

DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

11.

SEE SCHEDULEX

12. DISCOUNT TERMS

THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13a.

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

8(A)

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

Grounds Maintenance Work at the Supervisor's Office Administration Site, Lufkin, TX, National Forests and Grasslands in Texas Period of Performance: 04/13/2020 to 04/12/2021

0001 Base Year, Date of Award through 12 April, 2021 18 EA

Mowing, Edging, Weeding, and Trimming

Continued ...

(Use Reverse and/or Attach Additional Sheets as Necessary)

HEREIN, IS ACCEPTED AS TO ITEMS:

X

XX

DATED

NICHOLAS J. VOZZO

. YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

ARE

ARE

31c. DATE SIGNED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

OFFER

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

ARE NOT ATTACHED.

ARE NOT ATTACHED.

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

30b. NAME AND TITLE OF SIGNER (Type or print)

30a. SIGNATURE OF OFFEROR/CONTRACTOR

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

25. ACCOUNTING AND APPROPRIATION DATA

29. AWARD OF CONTRACT:

REF.

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER

37. CHECK NUMBER

FINALPARTIAL

36. PAYMENT

FINALPARTIAL

35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER33. SHIP NUMBER

COMPLETE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)

42b. RECEIVED AT (Location)

42a. RECEIVED BY (Print)

41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

STANDARD FORM 1449 (REV. 2/2012) BACK

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

Delivery: 04/12/2021

0002 Base Year, Date of Award through 12 April, 2021 3 EA

Dispose of tree limbs, branches, and other vegetative matter

Delivery: 04/12/2021

0003 Base Year, Date of Award through 12 April, 2021 2 EA

Clear paved walks, driveways, and parking lots of limbs, twigs, and leaves resulting from windstorm as requested. No mowing included

Delivery: 04/12/2021

1001 First Option Year, 13 April 2021 through 12 18 EA

April, 2022

Mowing, Edging, Weeding, and Trimming

(Option Line Item)

Continued ...

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

49 2 of

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 49

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

127DF520R0006

Delivery: 04/12/2022

Period of Performance: 04/13/2021 to 04/12/2022

1002 First Option Year, 13 April 2021 through 12 2 EA

April, 2022

Dispose of tree limbs, branches, and other vegetative matter

(Option Line Item)

Delivery: 04/12/2022

Period of Performance: 04/13/2021 to 04/12/2022

1003 First Option Year, 13 April 2021 through 12 2 EA

April, 2022

Clear paved walks, driveways, and parking lots of limbs, and leaves resulting from windstorm as needed. No mowing included

(Option Line Item)

Delivery: 04/12/2022

Period of Performance: 04/13/2021 to 04/12/2022

2001 Second Option Year, 13 April 2022 through 12 18 EA

April, 2023

Mowing, Edging, Weeding, and Trimming

(Option Line Item)

Delivery: 04/12/2023

Period of Performance: 04/13/2022 to 04/12/2023

2002 Second Option Year, 13 April 2022 through 12 2 EA

April, 2023

Dispose of tree limbs, branches, and other vegetative matter

(Option Line Item)

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

4 49

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

127DF520R0006

Delivery: 04/12/2023

Period of Performance: 04/13/2022 to 04/12/2023

2003 Second Option Year, 13 April 2022 through 12 2 EA

April, 2023

Clear paved walks, driveways, and parking lots of limbs, twigs, and leaves resulting from windstorm as required. No mowing included

(Option Line Item)

Delivery: 04/12/2023

Period of Performance: 04/13/2022 to 04/12/2023

3001 Third Option Year, 13 April 2023 through 12 18 EA

April, 2024

Mowing, Edging, Weeding, and Trimming

(Option Line Item)

Delivery: 04/12/2024

Period of Performance: 04/13/2023 to 04/12/2024

3002 Third Option Year, 13 April 2023 through 12 2 EA

April, 2024

Dispose of tree limbs, branches, and other vegetative matter

(Option Line Item)

Delivery: 04/12/2024

Period of Performance: 04/13/2023 to 04/12/2024

3003 Third Option Year, 13 April 2023 through 12 2 EA

April, 2024

Clear paved walks, driveways, and parking lots of limbs, twigs, and leaves resulting from windstorm

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

5 49

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

127DF520R0006

as requested. No mowing included

(Option Line Item)

Delivery: 04/12/2024

Period of Performance: 04/13/2023 to 04/12/2024

4001 Fourth Option Year, 13 April 2024 through 12 18 EA

April, 2025

Mowing, Edging, Weeding, and Trimming

(Option Line Item)

Delivery: 04/12/2025

Period of Performance: 04/13/2024 to 04/12/2025

4002 Fourth Option Year, 13 April 2024 through 12 2 EA

April, 2025

Dispose of tree limbs, branches, and other vegetative matter

(Option Line Item)

Delivery: 04/12/2025

Period of Performance: 04/13/2024 to 04/12/2025

4003 Fourth Option Year, 13 April 2024 through 12 2 EA

April, 2025

Clear paved walks, driveways, and parking lots of limbs, twigs, and leaves resulting from windstorm as required. No mowing included

(Option Line Item)

Delivery: 04/12/2025

Period of Performance: 04/13/2024 to 04/12/2025

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

National Forest and Grasslands in Texas 127DF520R0006 Grounds Maintenance Supervisor’s Office Admin Site

1 | P a g e

IMPORTANT NOTICE TO OFFERORS

This is a Total small business set aside.

Grounds Maintenance NAICS: 561730 SBA Size Standards: $8 Million

The following shall be returned with your quotation to be determined responsive by the due date of 03/31/2020: (Do not send back the whole solicitation.)

1. Contractor’s Proposal Package MUST include the following:

a. SF-1449 p. 1- 6 (blocks 17a, 30.a, b & c, 23, and 24)

b. AGAR 452.209 – 70 Representation by Corporations Regarding an Unpaid Delinquent Tax Liability or a Felony Conviction - Alternate 1 (Feb 2012)

c. Representations and Certifications. If you do not complete your representation and certifications electronically at www.sam.gov, you must complete and submit pages

d. Contractors Financial Information Sheet attached

e. Performance Relevancy attached

f. Evaluation Criteria

g. Proof of insurance or a statement that the offeror understands the insurance requirements & can provide proof of insurance before contract award.

2. Contractor must be active in SAMS (SYSTEM FOR AWARD MANAGEMENT) (www.sam.gov) AND SHALL ENTER THEIR REPRESENTATIONS AND CERTIFICATIONS ONLINE IN ORDER TO BE ELIGIBLE TO RECEIVE AND AWARD

Offers in complete form are due to the contracting office no later than 3:00 P.M. March 31, 2020. Submit to nicholas.vozzo@usda.gov with the subject line: RFQ 127DF520R0006 Grounds Maintenance Work at the Supervisor’s Office.

GENERAL INFORMATION

SCOPE: This is a Request for Quotes which will result in a firm-fixed price, contract for a basic period of performance from date of award, through April 12, 2021, plus four, one-year option periods. Submission of an offer for the basic contract period constitutes an offer to perform in the Option Period(s), if exercised. Only one award will be made. This project is set-aside 100% for small business. Award will be made based on the best value to the government and can be made on initial offers. Contractor to furnish all material, labor, tools, equipment, signs, supplies, transportation, supervision, incidentals, and OSHA safety measures necessary to perform ground maintenance services at the Supervisor’s Office located at 2221 N Raguet St., Lufkin, Texas in accordance with the terms, conditions, and specifications of this solicitation and any resultant contract. .

INVOICE PROCESSING PLATFORM (IPP)

The awarded Contractor will be required to upload their Invoices in the Invoice Processing Platform (IPP) (www.ipp.gov) If you need assistance, contact the IPP Helpdesk at 866-973-3131.

SITE VISIT: Persons wishing to set up a site visit should contact Kris Greene, at 936-639-8597, e-mail kristin.greene@usda.gov http://www.sam.gov/ http://www.ipp.gov/

2 | P a g e

2 2

GROUNDS MAINTENANCE

NATIONAL FORESTS AND GRASSLANDS IN TEXAS (NFGT)

SUPERVISOR’S OFFICE

2221 N. RAGUET ST

LUFKIN, TX 75904

I. GENERAL

A. The Contractor shall provide all material, labor, tools, equipment, signs, supplies, transportation, supervision, incidentals, and OSHA safety measures to complete the work at the acceptable quality level.

• The Supervisor’s Office Complex (SOC) consists of an office building, generator building, historical warehouse and historical residence built by the Civilian Conservation Corp (CCC) in the 1930’s. The office is a fully functional office and open for business between the hours of 8:00 am and 4:30 pm Monday through Friday, except for federal holidays. The SOC is located on a historical site of approximately 9.7 acres and includes concrete access roads with four historical stone portals built in the 1930’s by the CCC. There are three concrete parking lots that are connected by concrete roads and sidewalks. The three concrete parking lots include the Visitor, Employee and fenced/gated US Forest Service Fleet parking lot. All utility lines are underground including the natural gas line that services the emergency generator located in the generator building.

Areas to be mowed and trimmed at the NFGT Supervisor’s Office complex are:

--all grass surfaces surrounding Office buildings and employee/customer parking in front;

--all grass surfaces surrounding and inside of Office fleet parking lot;

--all grass surfaces along access drive from Raguet Street to the Office building;

--all grass surfaces to the tree line on all sides of Supervisor’s Office Complex.

--all concrete/asphalt surfaces and edges along drives and walk-ways will be trimmed as well as around structures such as buildings, poles, signs, and posts

The following area to be mowed only upon notice by the Contracting Officer’s Representative or designated personnel.

--The interior island of the employee parking lot.

• The Contractor is responsible for verifying all project locations stated in this document. It is suggested that the Contractor set up a site visit prior to submitting a quote.

• Hours of work shall be anytime between the hours of 8:00 am and 4:30 pm Monday through Friday. If grounds maintenance is not required, a designated Contracting Officer Representative (COR) for the

3 | P a g e

3 3 maintenance contract will notify the Contractor by 4:30 pm on Monday of the week that maintenance is not necessary.

• It shall be the Contractor’s responsibility to determine if current ground(s) conditions allow work to be performed without causing damage to the site grounds (too wet or too dry). The NFGT Office Administrative Site grounds have underground utilities, historical facilities and structures. The Contractor shall take the necessary precautions to protect facilities, structures, vehicles, employees, and the visiting public. The Contractor shall be responsible to repair any damage caused by their activities to the NFGT Office Administrative Site facilities, vehicles, structures, signs, equipment and grounds.

• Grounds maintenance will take place at the NFGT Supervisor’s Office Complex bi-weekly through the summer months (ideally April through September). During the remaining months, maintenance can be scheduled on an “as necessary” basis with a minimum of one site visit per month.

• The Contractor shall designate in writing the Contractor’s Representative and any alternate Contractor’s Representatives for this work. The Contractor’s Representative (or alternate representative) must be able to communicate in English.

II. EXECUTION

A. Grounds maintenance shall include:

• Before mowing the grass the contractor shall pick up all tree limbs, branches, and other vegetative mater than cannot be mulched by the contractor’s equipment and shall place them in a spot designated on site.

When, in the opinion of the Contracting Officer, a sufficient amount of this material has accumulated to constitute a reasonable utility trailer load, the contractor shall remove it and properly dispose of the material away from government land. Payment will be made for the actual number of loads ordered in writing by the Contracting Officer.

• Guards and grass deflectors shall be in place and in proper working position on all of the Contractors equipment that are designed to have them. There are official U.S. Forest Service, Forest Service employee, and customer vehicles at the NFGT Office Administrative site. It will be the Contractor’s responsibility to repair any damage to any of these vehicles caused with their equipment while at these sites. It is the responsibility of the Contractor to be bonded to cover any possible damage claims. The Contractor shall notify the COR if any damage occurs to any property located on the NFGT Supervisor’s Office Complex and is solely responsible for correcting any damage.

• The mowed height of the grass shall be at approximately 2” to 2 ½” in height.

• Steep and/or wet areas and other areas that cannot be mowed with a riding mower shall be mowed with a gas trimmer (weed eater).

4 | P a g e

4 4

• All concrete/asphalt surfaces and edges along drives and walk-ways will be trimmed as well as around structures such as buildings, poles, signs, and posts.

• All concrete walking surfaces and vehicle driving surfaces at the NFGT Supervisor’s Office Complex shall be swept or air blown clean before Contractor can leave the site for the day. This also includes door mats at the entrances to all buildings. Debris from this operation is to be directed towards the grassy areas of each site and not towards vehicles or buildings.

B. If any of the services performed under this contract does not conform to contract requirements, the

Government may require the Contractor to perform the services again in conformity with contact requirements, for no additional fee.

C. A separate line item has been set up in the schedule of items should the need arise for contractor to clear paved walks, driveways, and parking lots of limbs, twigs, and leaves resulting from a windstorm.

Payment will be made for the actual number of times ordered in writing by the Contracting Officer. No mowing included.

III. PERSONAL PROTECTIVE EQUIPMENT

A. Contractor Responsibility

• Contractor shall train workers in the safe operation and use of equipment that the worker may use before the worker begins using such equipment.

• Personal protective equipment (PPE), including equipment for eyes, face, head, ears and extremities must be provided (at no cost to employee), used, and maintained in a sanitary and reliable condition. PPE must be used wherever it is necessary by reason of hazards or processes encountered which may cause injury or impairment in the function of any part of the body.

• In any area where the worker is exposed to the potential for flying or falling objects, the Contractor shall provide a hard hat to employees. The Contractor shall assure that employees wear the hard hat and all required PPE. The hard hat must meet the minimum requirements of American National Standards Institute (ANSI) standard Z89.1-1997.

IV. DEFINITIONS

STANDARD DEFINITIONS TERMS MEANING

Acceptable Quality Level (AQL) The maximum allowable deviation from perfect performance that may occur before the Government will invoke payment deduction. An AQL does not allow a

5 | P a g e

5 5 contractor knowingly to offer defective service, but limits reduced payment to circumstances in which defective performance results in a measurable reduction in the value of services rendered.

Defective Service A unit of service which contains one or more defects, or nonconformance with specified requirements.

Performance Requirements Summary (PRS) Identifies the key service outputs of the contract that will be evaluated by the Government to assure contract performance standards are met by the contractor.

Quality Assurance Those actions taken by the Government to assure services meet the requirements of

Contracting Officer’s Representative (COR) A Government person appointed by the contracting officer to help the contracting officer with contract administration and surveillance.

Government Inspector A Government person responsible for surveillance of contractor performance.

Quality Assurance Surveillance Plan (QASP) An organized written document used for quality assurance surveillance that contains specific methods the Government will use to perform surveillance of the contractor.

Quality Control Those actions taken by a contractor to control the performance of services so that they meet the requirements of the PWS.

Random Sampling A sampling method in which each service output in a unit has an equal chance of being selected.

Calendar Days Every day shown on the calendar, Saturdays, Sundays and holidays included.

V CONTRACTOR FURNISHED ITEMS/SERVICES

Submittals. The contractor shall provide and maintain an acceptable Quality Control Plan, Work Plan, and Safety Plan throughout the life of this contract. The contractor shall make available to the Government any records, materials, and other evidence regarding inspection, testing, and quality control for any work performed under this contract for examination, audit, or reproduction. This requirement also applies to any subcontracts under this contract. The Contractor shall notify subcontractors appropriately and insert this requirement in all subcontracts under this contract.

VI. GOVERNMENT PUBLICATIONS & STANDARDS/INDUSTRY STANDARDS/STATE

STANDARDS/TECHNICAL EXHIBITS

• Government’s Quality Assurance Surveillance Plan

• SCA Angelina Co. TX Service Contract Act WD # 2015-5279 12/23/2019 https://beta.sam.gov/wage-determination/2015- 5279/14?index=wd&keywords=&is_active=true&sort=-modifiedDate&date_filter_index=0&date_rad_selection=date&wdType=sca&state=TX&county=1 4822&is_wd_even=false&is_standard=true&prevP=prevPerfNo&page=1

VII. QUALITY/PERFORMANCE STANDARDS

Negative Incentives For Not Meeting Standards: Areas not meeting the AQL will be reworked at the contractor’s expense until it reaches the AQL. Those areas that cannot be reworked will result in non-payment for that area. The Government may also consider acceptance with consideration, less than https://beta.sam.gov/wage-determination/2015-5279/14?index=wd&keywords=&is_active=true&sort=-modifiedDate&date_filter_index=0&date_rad_selection=date&wdType=sca&state=TX&county=14822&is_wd_even=false&is_standard=true&prevP=prevPerfNo&page=1 https://beta.sam.gov/wage-determination/2015-5279/14?index=wd&keywords=&is_active=true&sort=-modifiedDate&date_filter_index=0&date_rad_selection=date&wdType=sca&state=TX&county=14822&is_wd_even=false&is_standard=true&prevP=prevPerfNo&page=1 https://beta.sam.gov/wage-determination/2015-5279/14?index=wd&keywords=&is_active=true&sort=-modifiedDate&date_filter_index=0&date_rad_selection=date&wdType=sca&state=TX&county=14822&is_wd_even=false&is_standard=true&prevP=prevPerfNo&page=1 https://beta.sam.gov/wage-determination/2015-5279/14?index=wd&keywords=&is_active=true&sort=-modifiedDate&date_filter_index=0&date_rad_selection=date&wdType=sca&state=TX&county=14822&is_wd_even=false&is_standard=true&prevP=prevPerfNo&page=1

6 | P a g e

6 6 satisfactory performance evaluation, payment reduction for percentage of work which falls below the AQL or not exercising an option year as a disincentive.

Positive Incentives For Meeting Standards: Satisfactory or Better performance rating; Exercise of Option Years; When performance has exceeded the standard for 6 consecutive months, reduce government oversight or contractor reporting, as appropriate.

VII. QUALITY ASSURANCE SURVEILLANCE PLAN

Contract – Grounds Maintenance at the Supervisor’s Office, in Lufkin, TX.

This Quality Assurance Surveillance Plan (QASP) has been developed pursuant to the requirements of the Performance Work Statement (PWS) in 127DF520R0006. This plan sets forth procedures and guidelines that will be used in evaluating the technical performance of the contractor.

A. PURPOSE OF THE QASP

The QASP is intended to accomplish the following:

Define the roles and responsibilities of participating government officials and the contractor;

Identify the types of work to be performed and the inspections to be performed to validate adequacy; describe the evaluation methods that will be employed by the government in assessing the contractor’s inspection program and performance to the quality/performance standards required for each task;

Provide copies of the contractor’s inspection records and Government quality assurance monitoring forms that will be used by the government in documenting and evaluating the contractor’s performance;

Describe the process of performance documentation.

The contractor is responsible for performing inspection services pursuant to the inspection clause and for providing and maintaining the inspection forms, approved by the government, to perform the contractor’s inspection services. The contractor has represented themselves, to be responsible for meeting the prescribed quality/performance standards in the statement of work.

B. ROLES AND RESPONSIBILITIES OF GOVERNMENT OFFICIALS

The following government officials will participate in assessing the quality of the contractor’s performance. Their roles and responsibilities are described as follows:

The Contracting Officer’s Representatives (CORs) will be responsible for monitoring, assessing, recording, and reporting on the technical performance of the contractor on the schedule of inspections submitted by the contractor and approved by the government.

The COR/Inspector, if the latter is assigned to the project, will either witness the contractor’s performance of the inspections performed by the contractor or will evaluate the contractor’s inspection results as to documented findings relative to meeting the standards for each task/subtask within the statement of work. The COR will have primary responsibility for completing quality assurance monitoring forms which will be used to document the inspection and evaluation of the contractor’s work performance.

The Contracting Officer (CO) will have overall responsibility for overseeing the contractor’s performance and for the day-to-day monitoring of the contractor’s performance in the areas of contract compliance, contract administration, cost control, and property control; reviewing the COR’s assessment of the contractor’s performance; and resolving all differences between the COR’s and the contractor’s versions.

7 | P a g e

7 7

C. TYPES OF WORK TO BE PERFORMED/SCHEDULE OF INSPECTIONS

This contract calls for the contractor to perform the following tasks and subtasks and to perform inspections at the completion of the tasks/subtasks as a minimum and or for intermediate inspections as determined at contract award by the COR/CO. The contractor’s quality control plan/schedule will be modified accordingly and will be one of the basis for the award of the contract.

Service Delivery Summary

Performance Objective SOW Para Performance Threshold Mowing, Edging, Weeding and Trimming.

II. A. and Contract

Specification

100% adherence to performance requirements is required.

Not to exceed three reported occurrences with less than 100% compliance as reported by the COR on the Quality Assurance Report.

Dispose of Tree Limbs, Branches, and Other Vegetative Matter.

II.A. and

Specification

100% adherence to performance requirements is required.

Not to exceed three reported occurrences with less than 100% compliance as reported by the COR on the Quality Assurance Report.

Clear Paved Walks, Driveways, and Parking Lots of Limbs, Twigs, and Leaves Resulting From Windstorm as Requested.

II.C. and

Specification

100% adherence to performance requirements is required.

Not to exceed three reported occurrences with less than 100% compliance as reported by the COR on the Quality Assurance Report.

D. METHODS OF SURVEILLANCE

Surveillance The government, through each COR and Government Inspector, shall monitor the contractor’s performance through a variety of methods. The methods to be used are:

1. 100% inspection of the contractor’s inspection results. .

2. Customer surveys.

3. Periodic inspections by COR and contract inspectors.

8 | P a g e

8 8

Performance Requirements Summary

Required Service Standard (Referencing PWS) Allowable

Deviation Method of Quality Assurance

Disincentive

Mowing, Edging, Weeding and Trimming.

II. A. and Contract Specification

5% from standard Bi-Monthly Inspections/ Quality Assurance Report

Rework at no cost to the Government.

Dispose of Tree Limbs, Branches, and Other Vegetative Matter.

II.A. and

5% from standard Bi-Monthly Inspections/ Quality Assurance Report

Rework at no cost to the Government.

Clear Paved Walks, Driveways, and Parking Lots of Limbs, Twigs, and Leaves Resulting From Windstorm as Requested.

II.C. and

5% from standard Random Inspections/ Quality Assurance Report

Rework at no cost to the Government.

Special/Emergency Event Cleaning Clean area of service to meet standards specified in Column 1 of the SDS and the delivery order for that task

5% from standard Random Inspections/ Quality Assurance Report, Appendix D

Rework at no cost to the Government.

Procedures

1. Each COR and Inspector will use one Quality Assurance (QA) monitoring form to document and evaluate the contractor’s performance under the contract. The form, when complete, will document what the contractor was supposed to do, what was actually done, and the impact or consequences of what was done.

2. Each COR will judge each event in accordance with the performance standards and performance requirements stated in section 5 of the Performance of Work Statement (PSW), Section C-1.

3. Each COR must substantiate all tasks which he judges to be indicative of “unacceptable” performance.

Performance at the “acceptable” level is expected and need not be substantiated.

4. The contractor will furnish to the COR, copies of all contractor-generated inspection forms. The COR will then forward copies of all completed QA monitoring forms and contractor inspection records to the CO. The contractor is required to respond in writing to any negative QA monitoring form within 5 working days after receipt of the form.

9 | P a g e

9 9

Quality Assurance Checklist

For Grounds Maintenance Supervisor’s Office Admin Site

As Ordered: DATE DATE Mowing, Edging, Weeding and Trimming.

--all grass surfaces surrounding Office buildings and employee/customer parking in front;

--all grass surfaces surrounding and inside of Office fleet parking lot;

--all grass surfaces along access drive from Raguet Street to the Office building;

--all grass surfaces to the tree line on all sides of Supervisor’s Office Complex.

--all concrete/asphalt surfaces and edges along drives and walk-ways will be trimmed as well as around structures such as buildings, poles, signs, and posts

As directed by the Contracting Officer’s Representative or designated personnel.

--The interior island of the employee parking lot.

Dispose of Tree Limbs, Branches, and Other Vegetative Matter.

Clear Paved Walks, Driveways, and Parking Lots of Limbs, Twigs, and Leaves Resulting From Windstorm as Requested.

Comments:

Unless noted, services performed were satisfactory.

Conducted by: Date:

Contracting Officer's Representative

10 | P a g e

1 1

CONTRACT CLAUSES

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS-

COMMERCIAL ITEMS (OCT 2019)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Aug 2019) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).

(5) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).

(6) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78

(19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

[Contracting Officer check as appropriate.] _X_ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

_X_ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509)).

__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

__ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2018) (Pub. L. 109-282) (31 U.S.C. 6101 note).

__ (5) [Reserved].

__ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

__ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub. L.

111-117, section 743 of Div. C).

__ (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Oct 2015) (31 U.S.C. 6101 note).

__ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (41 U.S.C.

2313).

__ (10) [Reserved].

__ (11) (i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Nov 2011) (15 U.S.C.657a).

__ (ii) Alternate I (Nov 2011) of 52.219-3.

__ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

__ (ii) Alternate I (Jan 2011) of 52.219-4.

__ (13) [Reserved] _X_ (14) (i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2011) (15 U.S.C.644).

__ (ii) Alternate I (Nov 2011).

__ (iii) Alternate II (Nov 2011).

__ (15) (i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).

__ (ii) Alternate I (Oct 1995) of 52.219-7.

__ (iii) Alternate II (Mar 2004) of 52.219-7.

__ (16) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and (3)).

__ (17) (i) 52.219-9, Small Business Subcontracting Plan (Aug 2018) (15 U.S.C. 637(d)(4)) __ (ii) Alternate I (Nov 2016) of 52.219-9.

__ (iii) Alternate II (Nov 2016) of 52.219-9.

11 | P a g e

__ (iv) Alternate III (Nov 2016) of 52.219-9.

__ (v) Alternate IV (Aug 2018) of 52.219-9 __ (18) 52.219-13, Notice of Set-Aside of Orders (Nov 2011) (15 U.S.C. 644(r)).

_X_ (19) 52.219-14, Limitations on Subcontracting (Jan 2017) (15 U.S.C.637(a)(14)).

__ (20) 52.219-16, Liquidated Damages-Subcontracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).

__ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Oct 2019) (15 U.S.C. 657f).

_X_ (22) 52.219-28, Post Award Small Business Program Rerepresentation (Jul 2013) (15 U.S.C. 632(a)(2)).

__ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (Dec 2015) (15 U.S.C. 637(m)).

__ (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Dec 2015) (15 U.S.C. 637(m)).

_X_ (25) 52.222-3, Convict Labor (June 2003) (E.O.11755).

_X_ (26) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (Oct 2019) (E.O.13126).

_X_ (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

_X_ (28) (i) 52.222-26, Equal Opportunity (Sept 2016) (E.O.11246).

_X_ (ii) Alternate I (Feb 1999) of 52.222-26.

_X_ (29) (i) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).

_X_ (ii) Alternate I (July 2014) of 52.222-35.

_X_ (30) (i) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C.793).

_X_ (ii) Alternate I (July 2014) of 52.222-36.

_X_ (31) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212).

_X_ (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).

_X_ (33) (i) 52.222-50, Combating Trafficking in Persons (Jan 2019) (22 U.S.C. chapter 78 and E.O. 13627).

__ (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

_X_ (34) 52.222-54, Employment Eligibility Verification (Oct 2015). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

__ (35) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (36) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun 2016) (E.O. 13693).

__ (37) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Jun2016) (E.O. 13693).

__ (38) (i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514).

__ (ii) Alternate I (Oct 2015) of 52.223-13.

__ (39) (i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (Jun 2014) (E.O.s 13423 and 13514).

__ (ii) Alternate I (Jun 2014) of 52.223-14.

_X_ (40) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).

__ (41) (i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (Oct 2015) (E.O.s 13423 and 13514).

__ (ii) Alternate I (Jun 2014) of 52.223-16.

__ (42) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) (E.O. 13513).

__ (43) 52.223-20, Aerosols (Jun 2016) (E.O. 13693).

__ (44) 52.223-21, Foams (Jun 2016) (E.O. 13693).

__ (45) (i) 52.224-3 Privacy Training (Jan 2017) (5 U.S.C. 552 a).

__ (ii) Alternate I (Jan 2017) of 52.224-3.

__ (46) 52.225-1, Buy American-Supplies (May 2014) (41 U.S.C. chapter 83).

__ (47) (i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (May 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L.

103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

__ (ii) Alternate I (May 2014) of 52.225-3.

__ (iii) Alternate II (May 2014) of 52.225-3.

__ (iv) Alternate III (May 2014) of 52.225-3.

12 | P a g e

__ (48) 52.225-5, Trade Agreements (Oct 2019) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

__ (49) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

__ (50) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

__ (51) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).

__ (52) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).

__ (53) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C.4505, 10 U.S.C.2307(f)).

__ (54) 52.232-30, Installment Payments for Commercial Items (Jan 2017) (41 U.S.C.4505, 10 U.S.C.2307(f)).

_X_ (55) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (Oct 2018) (31 U.S.C. 3332).

__ (56) 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award Management (Jul 2013) (31 U.S.C.3332).

__ (57) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C.3332).

__ (58) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).

__ (59) 52.242-5, Payments to Small Business Subcontractors (Jan 2017) (15 U.S.C. 637(d)(13)).

__ (60) (i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).

__ (ii) Alternate I (Apr 2003) of 52.247-64.

__ (iii) Alternate II (Feb 2006) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

[Contracting Officer check as appropriate.] __ (1) 52.222-17, Nondisplacement of Qualified Workers (May 2014)(E.O. 13495).

_X_ (2) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter 67).

__ (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

_X_ (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option Contracts) (Aug 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

__ (5) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

__ (6) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) (41 U.S.C. chapter 67).

__ (7) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (May 2014) (41 U.S.C. chapter 67).

__ (8) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015).

__ (9) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2017) (E.O. 13706).

__ (10) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (May 2014) (42 U.S.C. 1792).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records-Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

13 | P a g e

(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) in a subcontract for commercial items.

Unless otherwise indicated below, the extent of the flow down shall be as required by the clause-

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).

(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(iii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).

(iv) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Aug 2019) (Section 889(a)(1)(A) of Pub. L. 115-232).

(v) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C.637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $700,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(vi) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495). Flow down required in accordance with paragraph (l) of FAR clause 52.222-17.

(vii) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

(viii) 52.222-26, Equal Opportunity (Sept 2015) (E.O.11246).

(ix) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C.4212).

(x) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C.793).

(xi) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C.4212)

(xii) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).

Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(xiii) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter 67).

(xiv) (A) 52.222-50, Combating Trafficking in Persons (Jan 2019) (22 U.S.C. chapter 78 and E.O 13627).

(B) Alternate I (Mar 2015) of 52.222-50(22 U.S.C. chapter 78 and E.O 13627).

(xv) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) (41 U.S.C. chapter 67).

(xvi) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (May 2014) (41 U.S.C. chapter 67).

(xvii) 52.222-54, Employment Eligibility Verification (Oct 2015) (E.O. 12989).

(xviii) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015).

(xix) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2017) (E.O. 13706).

(xx) (A) 52.224-3, Privacy Training (Jan 2017) (5 U.S.C. 552a).

(B) Alternate I (Jan 2017) of 52.224-3.

(xxi) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

(xxii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (May 2014) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.

(xxiii) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C.

Appx.1241(b) and 10 U.S.C.2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.

(2) While not required, the Contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.

(End of clause) Alternate I (Feb 2000). As prescribed in 12.301(b)(4)(i), delete paragraph (d) from the basic clause, redesignate paragraph

(e) as paragraph (d), and revise the reference to “paragraphs (a), (b), (c), or (d) of this clause” in the redesignated paragraph

(d) to read “paragraphs (a), (b), and (c) of this clause”.

Alternate II (Aug 2019). As prescribed in 12.301(b)(4)(ii), substitute the following paragraphs (d)(1) and (e)(1) for paragraphs (d)(1) and (e)(1) of the basic clause as follows:

(d)(1) The Comptroller General of the United States, an appropriate Inspector General appointed under section 3 or 8 G of the Inspector General Act of 1978 (5 U.S.C. App.), or an authorized representative of either of the foregoing officials shall have access to and right to—

(i) Examine any of the Contractor’s or any subcontractors’ records that pertain to, and involve transactions relating to, this contract; and

14 | P a g e

(ii) Interview any officer or employee regarding such transactions.

(e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), and (c), of this clause, the Contractor is not required to flow down any FAR clause in a subcontract for commercial items, other than-

(i) Paragraph (d) of this clause. This paragraph flows down to all subcontracts, except the authority of the Inspector General under paragraph (d)(1)(ii) does not flow down; and

(ii) Those clauses listed in this paragraph (e)(1). Unless otherwise indicated below, the extent of the flow down shall be as required by the clause-

(A) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).

(B) 52.203-15, Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5).

(C) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).

(D) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Aug 2019) (Section 889(a)(1)(A) of Pub. L. 115-232).

(E) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $700,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(F) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

(G) 52.222-26, Equal Opportunity (Sept 2016) (E.O. 11246).

(H) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).

(I) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul2014) (29 U.S.C. 793).

(J) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O.

13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(K) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C.chapter 67).

(L) ___(1) 52.222-50, Combating Trafficking in Persons (Jan 2019) (22 U.S.C. chapter 78 and E.O 13627).

___(2) Alternate I (Mar2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O 13627).

(M) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) (41 U.S.C. chapter 67).

(N) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (May2014) (41 U.S.C. chapter 67).

(O) 52.222-54, Employment…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .