This is a Solicitation Evaluation Criteria document for Solicitation Number 127870 O5 InterRAI Assessment with an opening date of December 9, 2026. The solicitation requires respondents to submit a Corporate Overview, Technical Response, Completed Cost Sheet, Completed Solicitation Sections II through IV, and a manually signed or DocuSign-executed Contractual Agreement Form to meet mandatory requirements. Responses failing to address these mandatory elements will be deemed non-responsive and excluded from further evaluation. Responsive proposals will be evaluated across three primary categories: Corporate Overview (30 points), Technical Response (60 points), and Cost (10 points), for a total of 100 points, with an optional Vendor Demonstrations component worth an additional 20 points for a maximum total of 120 points.

Cost points are calculated using a competitive formula whereby the lowest realistic cost submitted receives the maximum 10 points, and all other proposals receive points proportional to their cost relative to the lowest bid. The formula multiplies the lowest cost submitted by the maximum possible cost points (10), then divides by the cost submitted to determine the points awarded, ensuring cost competitiveness is evaluated on a reasonable and realistic basis. No additional information regarding pricing terms, set-asides, incumbent contractors, funding sources, or contract duration is provided in this evaluation criteria document.

View the file

Other files

File Type Posted
127870 O5 Cost Sheet.docx DOCX document
127870 O5 RFP.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION EVALUATION CRITERIA

SOLICITATION NUMBER: 127870 O5

InterRAI Assessment Evaluation Opening Date: December 9, 2026

Mandatory Requirements The solicitation responses will first be examined to determine if all mandatory requirements listed below have been addressed to warrant further evaluation. Responses not meeting mandatory requirements may be deemed non-responsive and be excluded from further evaluation. The mandatory requirement items are as follows:

Corporate Overview;

Technical Response;

Completed Cost Sheet;

Completed Solicitation Sections II through IV; and Contractual Agreement Form signed manually in ink or by Docusign.

Evaluation Criteria All solicitation responses which are deemed responsive will be evaluated. Each category will have a maximum possible point potential. Areas that will be addressed and scored during the evaluation include:

Evaluation Criteria
Possible Points
Part 1 Corporate Overview
30
Part 2 Technical Response
60
Part 3 Cost
10
Total Points without Vendor Demonstrations
100
Vendor Demonstrations, (if required)
20
Total Points with Vendor Demonstrations
120

Part 3 – Cost Cost points should be calculated as follows, accounting for cost realism and reasonableness:

0. Establish lowest realistic cost submitted – lowest cost submitted receives the maximum points.

0. To assign points to all others, the following formula should be followed:

Lowest Cost Submitted Cost Submitted x Maximum Possible Cost Points = Cost Points to Award (see samples below)

Formula

Sample

Sample

Sample

Lowest Cost Submitted

$100,000

$100,000

$100,000

Cost Submitted

$100,000

$200,000

$150,000 x Maximum Possible Cost Points

= Points To Award

10.00

5.00

6.67