12787 Bid Results.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- 12787 Prefabricated FRP Pedestrian Bridge
- Solicitation number
- S-63400-00012931
- Issued by
- Baker County, Oregon
About this file
The document is a preliminary bid results spreadsheet for Oregon Parks and Recreation Department (OPRD) contract #12787, soliciting bids for a prefabricated Fiber Reinforced Polymer (FRP) pedestrian bridge. The project involves the purchase and delivery of one 30-foot FRP bridge to the Sumpter Valley Dredge State Heritage Area, with bids closing on March 5, 2025. Three bidders submitted proposals: Orenco Systems Inc from Sutherlin, OR; Technology International, Inc. from Houston, TX; and AIK Global Inc. from Houston, TX.
The bid results sheet shows varying total costs for the bridge, ranging from $39,500 (Orenco Systems Inc) to $44,134.60 (AIK Global Inc), with Technology International, Inc. submitting a mid-range bid of $41,595. The document is marked as a preliminary result, indicating that the final evaluation is still pending and the results are not yet official. No additional details are provided about funding sources, contract terms, or specific technical requirements for the bridge.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB 12787 Prefabricated Pedestrian Bridge.pdf | ||
| 12787 - Notice of Intent to Award.docx | DOCX document | |
| Sample Contract - Madras Janitorial ~1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRELIM. BID RESULTS
BID RESULTS
| OPRD # | 12787 | |||||||
| OregonBuys # | S-63400-00012578 | |||||||
| Closing: | 03/05/2025 | |||||||
| Title: | Purchase of Prefabricated FRP Pedestrian Bridge | |||||||
| Orenco Systems Inc | Technology International, Inc. | AIK Global Inc. | ||||||
| 814 Airway Ave | 1331 South International Parkway, Suite 2251 | 6201 Bonhomme Rd, Suite 454S | ||||||
| Sutherlin, OR 97479 | Houston, TX 77036 | |||||||
| Item # | Description | Quantity | TOTAL COST | TOTAL COST | TOTAL COST | |||
| A1 | Thirty (30) foot FRP Bridge for delivery to Sumpter Valley Dredge State Heritage Area | 1 | $ 39,500.00 | $ 41,595.00 | $ 44,134.60 | |||
| Total | $ 39,500.00 | $ 41,595.00 | $ 44,134.60 |