12740 B77367 - EL - Fortify License Renewal.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
77367 _ A12740 - FORTIFY LICENSE RENEWAL
Solicitation number
77367
Issued by

About this file

This is an Equipment List file for a Fortify Software License Renewal solicitation for the Department of the Air Force Materiel Command Air Force Sustainment Center. The solicitation (Number 77367) is a Request for Quotation (RFQ) conducted under Simplified Acquisition Procedures, specifically targeting FAR 8 Mandatory Sources and Enterprise Software Initiative (ESI) vendors.

The equipment list details the renewal of two software licenses: 6 units of Fortify Scan Machine USGovt Subscription SW E-LTU for a 1-year term (Part Number SB-AF406) and 6 units of Fortify Content for Subscription for a 1-year term (Part Number SB-AF149). Delivery is specified as 10 days After Receipt of Order (ARO), with shipping to David Tate at 78 ABW/SCOSD, located at 205 Perry Street, Building 228, Robins AFB, GA 31098-1607. The acquisition is explicitly for software license renewal only, with no new software being purchased.

View the file

Other files

File Type Posted
77367 - Letter RFQ.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions Equipment List Instructions

Alexsys & PRIIdentify the Alexsys # and the PRI # applicable to this purchase
Acquisition TypeIdentify whether the acquisition is for Service, Supply, New Software Only, Software Renewal Only or a combination of new and renewal of software licenses. If using the combo for software licenses be sure to identify which ones are new and which ones are renewals on separate line items. If an acquisition is a hybrid of service and supply, the acquisition type shall be identifed as the predominant type.
Acquisition ScheduleService - Identify Period of Performance Dates (From/To)

*If specific dates are unknown, identify the number of months After Receipt Of (ARO) contract award (e.g., 90 days ARO)* Supply - Identify delivery due date New Software - Identify software delivery due date and license coverage period Software License Renewal - Identify software delivery due date and software license coverage period *** All dates shall be from contract award forward. Contracts shall not be backdated due to missed license renewal or to avoid reinstatement fees for gaps in coverage. If license was not renewed prior to expiration renewal/reinstatement fees are mandatory and shall be included as a separate line item when developing CLIN structure***

Shipping InformationIf applicable, insert the physical shipping address or inbox location for deliverables. Include the POC Name and Phone #
Line Item StructureIAW DFARS 204.7103-1; Contract Line Item Numbers (CLINs) are established based on specific characteristics:

Single Unit Price Separately Identifiable Supplies = Separately identifiable National Stock Numbers (NSNs), Item Description, Manufacturer Part Number Services = Separately identifiable scope of work or description of services Separate Delivery Schedule The line item listed on the equipment list shall correlate to the Purchase Request (PR) CLIN structure

Description Write a description of the supply or service required. If purchasing a supply that includes incidental services (travel, installation, maintenance, or other support separate from the supply unit cost), a separate CLIN is required.

Include license coverage period with the applicable software line item If Options are required for continued services beyond the first year, include a separate line item for every year, to include the services required for those option years.

ManufacturerIf applicable, identify manufacturer for brand name or equivalent
Part NumberVerify part numbers are not End-of-Life (EOL) or obsolete when selecting.

Utilize market research to identify software versions available on the market that meet the Government's need to avoid rework later in the acquisition process that causes delays.

Software Renewal InformationWhen renewing software licenses provide the current/prior software account information from the manufacturer. This helps the manufacturer to identify current license status and reinstatement/renewal fees without delays in the acquisition process.
QuantityIdentify quantities needed
Unit of MeasureIdentify the appropriate Unit of Measure for each line item. Supplies are generally "Each"; Services can be "Months" or "Lots" depending on when payment/invoicing is most appropriate.
Additional lines needed on Equipment ListSelect the last cell in the bottom right corner of the table and hit Tab. This will drop down a new line. Continue to do this for as many line items as needed

Equipment List

Equipment List
Acquisition Information
Alexsys # and PRI12740 B77367
Acquisition Type (select from drop down at right)Software License Renewal
Acquisition ScheduleDelivery 10 Days ARO
Shipping InformationAttn: David Tate

78 ABW/SCOSD (BSLM)

205 Perry Street Bldg 228 Robins AFB, GA 31098 – 1607

Line ItemDescriptionManufacturerPart NumberIndicate New or Renewal Licenses from Drop Downs in each cellSoftware Renewal Information
Current account identifier informationQuantityUnit of Measure
1Fortify Scan Machine USGovt Subscription SW E-LTU - 1 YearSB-AF406Renewal LicenseSW E-LTU6Each
2Fortify Content for Subscription - 1 YearSB-AF149Renewal License6Each

File details come from the government source that posted it. Updated .