12740 B77367 - EL - Fortify License Renewal.xlsx
XLSX spreadsheet 29 KB Posted
- Attached to
- 77367 _ A12740 - FORTIFY LICENSE RENEWAL
- Solicitation number
- 77367
About this file
This is an Equipment List file for a Fortify Software License Renewal solicitation for the Department of the Air Force Materiel Command Air Force Sustainment Center. The solicitation (Number 77367) is a Request for Quotation (RFQ) conducted under Simplified Acquisition Procedures, specifically targeting FAR 8 Mandatory Sources and Enterprise Software Initiative (ESI) vendors.
The equipment list details the renewal of two software licenses: 6 units of Fortify Scan Machine USGovt Subscription SW E-LTU for a 1-year term (Part Number SB-AF406) and 6 units of Fortify Content for Subscription for a 1-year term (Part Number SB-AF149). Delivery is specified as 10 days After Receipt of Order (ARO), with shipping to David Tate at 78 ABW/SCOSD, located at 205 Perry Street, Building 228, Robins AFB, GA 31098-1607. The acquisition is explicitly for software license renewal only, with no new software being purchased.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 77367 - Letter RFQ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions Equipment List Instructions
| Alexsys & PRI | Identify the Alexsys # and the PRI # applicable to this purchase |
| Acquisition Type | Identify whether the acquisition is for Service, Supply, New Software Only, Software Renewal Only or a combination of new and renewal of software licenses. If using the combo for software licenses be sure to identify which ones are new and which ones are renewals on separate line items. If an acquisition is a hybrid of service and supply, the acquisition type shall be identifed as the predominant type. |
| Acquisition Schedule | Service - Identify Period of Performance Dates (From/To) |
*If specific dates are unknown, identify the number of months After Receipt Of (ARO) contract award (e.g., 90 days ARO)* Supply - Identify delivery due date New Software - Identify software delivery due date and license coverage period Software License Renewal - Identify software delivery due date and software license coverage period *** All dates shall be from contract award forward. Contracts shall not be backdated due to missed license renewal or to avoid reinstatement fees for gaps in coverage. If license was not renewed prior to expiration renewal/reinstatement fees are mandatory and shall be included as a separate line item when developing CLIN structure***
| Shipping Information | If applicable, insert the physical shipping address or inbox location for deliverables. Include the POC Name and Phone # |
| Line Item Structure | IAW DFARS 204.7103-1; Contract Line Item Numbers (CLINs) are established based on specific characteristics: |
Single Unit Price Separately Identifiable Supplies = Separately identifiable National Stock Numbers (NSNs), Item Description, Manufacturer Part Number Services = Separately identifiable scope of work or description of services Separate Delivery Schedule The line item listed on the equipment list shall correlate to the Purchase Request (PR) CLIN structure
Description Write a description of the supply or service required. If purchasing a supply that includes incidental services (travel, installation, maintenance, or other support separate from the supply unit cost), a separate CLIN is required.
Include license coverage period with the applicable software line item If Options are required for continued services beyond the first year, include a separate line item for every year, to include the services required for those option years.
| Manufacturer | If applicable, identify manufacturer for brand name or equivalent |
| Part Number | Verify part numbers are not End-of-Life (EOL) or obsolete when selecting. |
Utilize market research to identify software versions available on the market that meet the Government's need to avoid rework later in the acquisition process that causes delays.
| Software Renewal Information | When renewing software licenses provide the current/prior software account information from the manufacturer. This helps the manufacturer to identify current license status and reinstatement/renewal fees without delays in the acquisition process. |
| Quantity | Identify quantities needed |
| Unit of Measure | Identify the appropriate Unit of Measure for each line item. Supplies are generally "Each"; Services can be "Months" or "Lots" depending on when payment/invoicing is most appropriate. |
| Additional lines needed on Equipment List | Select the last cell in the bottom right corner of the table and hit Tab. This will drop down a new line. Continue to do this for as many line items as needed |
Equipment List
| Equipment List |
| Acquisition Information |
| Alexsys # and PRI | 12740 B77367 |
| Acquisition Type (select from drop down at right) | Software License Renewal |
| Acquisition Schedule | Delivery 10 Days ARO |
| Shipping Information | Attn: David Tate |
78 ABW/SCOSD (BSLM)
205 Perry Street Bldg 228 Robins AFB, GA 31098 – 1607
| Line Item | Description | Manufacturer | Part Number | Indicate New or Renewal Licenses from Drop Downs in each cell | Software Renewal Information | ||||
| Current account identifier information | Quantity | Unit of Measure | |||||||
| 1 | Fortify Scan Machine USGovt Subscription SW E-LTU - 1 Year | SB-AF406 | Renewal License | SW E-LTU | 6 | Each | |||
| 2 | Fortify Content for Subscription - 1 Year | SB-AF149 | Renewal License | 6 | Each |
File details come from the government source that posted it. Updated .