About this file

This is a project drawing document for repairs and rehabilitation of structural components at the Fresno-Clovis Regional Wastewater Reclamation Facility (RWRF) Headworks Building located at 5607 W Jensen Avenue, Fresno, California 93706. The project, identified as Phase 2 of headworks building repairs, involves comprehensive concrete repairs, reinforcement work, coating applications, and structural rehabilitation of various building levels and systems. The design is based on California Building Code 2022 requirements and incorporates structural loads per ASCE 7-16, with seismic design category D criteria. The construction drawings include general notes, multiple floor and roof level plans, and detailed specifications for concrete repair methodologies, reinforcement practices, formwork requirements, and quality assurance protocols. The plans were initially issued for owner review on September 1, 2025, submitted for plan check on October 25, 2025, and issued for bid on December 17, 2025, with an addendum dated March 5, 2026 (Addendum 3) issued on September 30, 2026.

The technical specifications outline concrete repair materials utilizing polymer-modified mortars from approved manufacturers including Sika Corporation, MBCC Group, RPM International, and MAPEI Corporation for horizontal, vertical, and overhead applications. Reinforcement requirements specify ASTM A 615 Grade 60 deformed steel with concrete clear coverage minimums ranging from 3 inches for cast-against-ground conditions to 1½ inches for exposed weather conditions, depending on reinforcement size. The contractor is responsible for all demolition means and methods, structural stability during construction, and protection of existing utilities and embedded elements. Special inspections are required for concrete construction, post-installed anchors, reinforcing steel placement, structural steel welding, and bolting, with reports to be submitted to the building official prior to permit closeout. Construction documents reflect existing conditions based on available record drawings and include provisions for contractor-engineer coordination regarding utility penetrations, embedded items location verification using non-destructive methods, and detailed pre-construction surveys documenting existing conditions and designated removal items.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR

O

JE

C

T

D R

AW

IN

G

FR

ES

N O

-C

LO

VI

S

R W

R F

H

EA

D W

O R

KS

B

U

IL

D

IN

G R

EP

AI

R S

- P H

AS

E

W

J

EN

SE

N

A

VE

, F R

ES

N

O , C

AL

IF

O R

N

IA

ARCHITECT / ENGINEER STAMP

SHEET NUMBER

Date Revision / SubmissionNo.

09/01/2025 Issued For Owners Review1

Checked by: PRG

Drawn by: JU, PG

Project Number: 24x032 in fo pc ub ed as so ci at es .c om

Ph on e:

.9

.8

P c u b ed

A ss o c ia te s C o ns u lt in g E ng in ee r s

Pa ss io n

· P rid e

· P er fo rm an ce

10/25/2025 Issued For Plan Check2

12/17/2025 Issued for Bid3

C O

VE

R

S H

EE

T

S0.0

CITY OF FRESNO

DEPARTMENT OF PUBLIC UTILITIES

FRESNO-CLOVIS RWRF HEADWORKS BUILDING REPAIRS -

PHASE 2

5607 W JENSEN AVE

FRESNO, CALIFORNIA 93706

SHEET LIST

SHEET SHEET TITLE

S0.0 COVER SHEET

S0.1 GENERAL NOTES

S1.0 PLAN FIRST LEVEL WEST

S1.1 PLAN FIRST LEVEL EAST

S1.2 PLAN CHANNEL LEVEL WEST

S1.3 PLAN CHANNEL LEVEL EAST

S1.4 PLAN SECOND LEVEL WEST

S1.5 PLAN SECOND LEVEL EAST

S1.6 PLAN ROOF LEVEL

S2.0 DETAILS -1

S2.1 DETAILS -2

RWRC HEADWORKS BUILDING

W JENSEN AVE

FACILITY MAIN ENTRY AND

SECURITY CHECKPOINT

FACILITY ADMINISTRATIVE OFFICES

09/30/2026

(ADDENDUM 3)

F

Mar 05 2026

JE

C

T

D R

AW

IN

G

FR

ES

N O

-C

LO

VI

S

R W

R F

H

EA

D W

O R

KS

B

U

IL

D

IN

G R

EP

AI

R S

- P H

AS

E

W

J

EN

SE

N

A

VE

, F R

ES

N

O , C

AL

IF

O R

N

IA

ARCHITECT / ENGINEER STAMP

SHEET NUMBER

Date Revision / SubmissionNo.

09/01/2025 Issued For Owners Review1

Checked by: PRG

Drawn by: JU, PG

Project Number: 24x032 in fo pc ub ed as so ci at es .c om

Ph on e:

.9

.8

P c u b ed

A ss o c ia te s C o ns u lt in g E ng in ee r s

Pa ss io n

· P rid e

· P er fo rm an ce

10/25/2025 Issued For Plan Check2

12/17/2025 Issued for Bid3

G

EN

ER

A

L N

O

TE

S

S0.1

GENERAL NOTES

1 2 3 4 5

I. DESIGN CRITERIA

A. GENERAL BUILDING CODE

1. The Repair Construction Documents are based on the requirements of the California Building Code 2022. The Contractors work shall be in general conformance with these Documents and the following Codes and Standards.

a. Structural Loads: ASCE 7 “Minimum Design Loads for Buildings and Other

Structures”

b. Concrete Tolerances: ACI 117 “Standards Specifications for Tolerances for

Concrete Construction and Materials”

c. Structural Concrete: ACI 318 “Building Code Requirements For Structural

Concrete”

d. Structural Steel: AISC 360 “Specification For Structural Steel Buildings”

B. WIND LOADS

1. Wind pressures are based on ASCE 7-16 using the following criteria:

a. Ultimate design wind speed (Vult): 100 MPH (3 second gust)

b. Building risk category: III

c. Wind exposure category: C

d. Internal pressure coefficient (GCpi): ±0.18

C. SEISMIC DESIGN CRITERIA

1. Seismic loads are based on ASCE 7-16 with the following criteria:

a. 0.2 sec. Spectral Acceleration (Ss): 0.678g

b. 1 sec. Spectral Acceleration (S1): 0.252g

c. Site Class: D

d. Site Coefficient, short period (Fa): 1.258

e. Site Coefficient, 1 sec. period (Fv): 2.096

f. 0.2 sec Spectral Response Coeff. (Sds): 0.568g

g. 1 sec Spectral Response Coeff. (Sd1): 0.352g

h. Risk Category: III

i. Seismic Importance Factor, I: 1.25

j. Seismic Design Category: D

II. CONCRETE REPAIRS

A. CONCRETE REPAIR MATERIALS

1. All concrete shall conform to the requirements as specified in Specification Section “Concrete Repairs.”

B. CONCRETE REPAIR MORTARS

1. Polymer Modified Mortar for Horizontal Repairs:

a. Sika Corporation; SikaTop 122 Plus

b. MBCC Group | Master Builders Solutions; MasterEmaco T 310 CI

c. RPM International | Euclid Chemical Company; Eucocrete Supreme

d. MAPEI Corporation; Mapecem 102 or Mapecem 202

2. Polymer Modified Mortar for Overhead/Vertical Repairs:

a. Sika Corporation; SikaTop 123 Plus

b. MBCC Group | Master Builders Solutions; MasterEmaco N 425

c. RPM International | Euclid Chemical Company; Verticoat Supreme

d. MAPEI Corporation; Planitop 23

3. Polymer Modified Self-Consolidating Form and Pour Materials:

a. Sika Corporation; Sikacrete 211 SCC Plus

b. MBCC Group | Master Builders Solutions; MasterEmaco S 440CI

c. RPM International | Euclid Chemical Company; EucoRepair SCC

d. MAPEI Corporation; Planitop 11 SCC

C. REINFORCEMENT COATINGS

1. Three-component, cementitious, epoxy-modified, corrosion inhibiting coating for reinforcement.

a. Sika Corporation; Armatec 110 EpoCem

b. MBCC Group | Master Builders Solutions; MasterEmaco P 124

c. RPM International | Euclid Chemical Company; Duralprep A.C.

d. MAPEI Corporation; Planibond 3C

2. Contractor shall provide adequate mixing equipment on site to install bag mix concrete in the quantities required to perform a monolithic placement. The presence of cold joints following removal of formwork shall be grounds for rejection.

Concrete shall be mixed in accordance with the manufacturer's written instructions.

3. Concrete shall be extended with aggregate in accordance with the manufacturer's written instructions where applicable. Aggregate extension shall comply with ASTM C 33 and shall be obtained from the concrete manufacturer. Maximum aggregate size shall not exceed the following:

a. 1/5 the narrowest dimension between sides of forms

b. 1/3 the depth of slab placements

c. 3/4 the specified clear spacing between reinforcement and other elements

D. SURFACE PREPARATION FOR JOINING NEW CONCRETE TO EXISTING

CONCRETE

1. Roughen existing concrete to the specified concrete surface profile (ICRI CSP) using 15 lbf to 30 lbf air hammers equipped with chisel point bits. Do not damage or nick embedded reinforcement during chipping. Report the presence of spalling or delamination to the Engineer for further direction.

E. CONSTRUCTION JOINTS IN CONCRETE PLACEMENTS

1. Where new concrete repairs bridge existing construction joints, Contractor shall reform the construction joints in the new concrete repair. Construction joints shall not be present in new concrete placements unless shown on the drawings or permitted by the previous statement.

F. REINFORCEMENT

1. Reinforcing Steel: ASTM A 615 Grade 60, deformed, typical UNO.

2. Smooth Welded Wire Reinforcement: ASTM A 1064, Grade 65.

G. PLACEMENT OF WELDED WIRE REINFORCEMENT

1. Welded wire reinforcement shall be continuous across the entire concrete surface and lap spliced in accordance with ACI 318 sections 25.5.3 and 25.5.4.

H. REINFORCING COVERAGE

1. Concrete clear coverage over reinforcement shall conform to the requirements specified on the drawings. Cover specified shall be considered minimum, however existing reinforcement may have a smaller cover. Concrete patches can be built up to provide the required cover as long as the patch appearance is acceptable to Owner and it does not represent a tripping hazard to pedestrians or a bump to vehicles. Cover in structural members not specified in the details shall conform to the requirements of ACI 318, UNO.

2. Minimum cover for non-prestressed cast-in-place concrete

a. Cast against and permanently in contact with ground: 3” cover

b. Exposed to weather or in contact with ground

1) #6 and larger: 2” cover

2) #5, W31, or D31 and smaller: 1-1/2” cover

c. Not exposed to weather or in contact with ground

1) Slabs, Joist and Walls, #14 and larger: 1-1/2” cover

2) Slabs, Joist and Walls, #11 and smaller: 3/4" cover

3) Beams, Columns, Pedestals, and Tension Ties: 1-1/2” cover

I. SPLICES AND HOOKS IN REINFORCING STEEL

1. Refer to drawing details for splice requirements.

2. Mechanical Tension Splices and Anchors

a. Mechanical splices shall conform to Type 1 and Type 2 splices. Type 1 splices shall develop, in tension and compression, 1.25 times the Fy strength of the reinforcement being spliced. Type 2 splices shall additionally, develop the Fu strength of the reinforcement being spliced.

b. Mechanical Splices shall have a valid ICC-ES Report. ESR shall be the submitted for Engineer review.

c. Threaded bar ends that are to attach to the splice shall be prepared and installed in accordance with the manufacturer's requirements.

d. The following are acceptable mechanical tension splices and anchors, provided that their ESR's are still valid and provided they meet the Type requirements:

1) Retrofit Mechanical Tension Splices

a) Erico Products, Inc.; nVent Lenton Coupler S2 Shear Bolt

(ER-129, Type II)

b) BarSplice Products, Inc; Zap Screwlock (ESR-3517, Type II)

c) Dayton Superior Corporation; Bar-Lock Coupler System, L-Series

(ER-319, Type II)

J. POST-INSTALL ANCHORS

1. All post-installed anchors and reinforcement shall be as indicated on the drawing.

III. CONCRETE FORMING

A. RESPONSIBILITY

1. The design, construction, and safety of all formwork shall be the responsibility of the Contractor. All forms, shores, bracing, and other temporary supports shall be engineered to support all loads imposed including the wet weight of concrete, construction equipment, live loads, lateral loads due to wind and wet concrete imbalance. The Contractor shall also be responsible for determining when these temporary supports may be safely removed.

B. FORM-FACING MATERIALS

1. Rough Formed finished Concrete: The finish for formed surfaces shall be rough-form finish constructed with plywood, lumber, metal, or other acceptable material, UNO. Lumber shall be dressed on at least two edges and one side for tight fit. The minimum grade shall be B-C, exterior grade.

C. FORMWORK COATINGS

1. Formwork coatings shall be of a commercial formulation that will not bond with, stain, nor adversely affect concrete surfaces or impair subsequent treatment of concrete surfaces requiring bond or adhesion, nor impede curing with water or curing compounds. Provide a product that has a maximum VOC (Volatile Organic Compounds) of 100 g/L but not greater than that permitted by the local government agency having jurisdiction in the area where the project is located. Subject to compliance with requirements, provide one of the following:

D. FORMING ACCESSORIES

1. Nails and Fasteners: Use only galvanized nails and fasteners for securing formwork in structures exposed to weather or unconditioned spaces.

2. Form Ties: Factory-fabricated and designed to resist lateral pressure of fresh concrete on forms and to minimize spalling of concrete on removal. Provide removable, glass-fiber-reinforced plastic, stainless steel, or galvanized form ties that will leave no corrodible metal closer than 1 1/2" in surfaces that will be exposed to weather or in an unconditioned space in the final structure. The ties shall leave holes no larger than one inch in diameter in concrete surfaces when the ends or end-fasteners are removed.

3. Chamfer Strips: Provide wood, metal, PVC, or rubber strips, 3/4" by 3/4", minimum.

IV. SPECIAL FIRE DEPARTMENT NOTE:

1. Submit plans to and obtain permit from the Fire Prevention Division for the installation or modification of fire sprinkler system. Installations must also comply with FFD policy section 405. FFD Policies can be found at:

https://www.fresno.gov/fire-training/manuals-and-forms/.

V. QUALITY ASSURANCE

A. SPECIAL INSPECTION

1. The Owner's Testing and Inspection Agency shall provide special inspection services in accordance with the referenced building code for the following items.

a. Concrete Construction:

1) Post-Installed Anchors

2) Reinforcing Steel Placing

3) Concrete Materials and Placement

b. Steel Construction:

1) Field Welding of Structural Steel

2) Structural Steel/ Bolting

c. Concrete Construction:

1) Post-Installed Anchors

2) Post-Installed Reinforcement

3) Reinforcing Steel Placing

4) Formwork

5) Concrete Materials and Placement

2. In accordance with the referenced building code, Special Inspection reports and a other final report shall be submitted to the building official prior to close out of the building permit.

B. ADDITIONAL TESTING AND INSPECTIONS

1. The Owner's Testing and Inspection Agency shall provide testing and inspection services for the following items as defined in the relevant technical specification section.

a. Weather and Environmental Protection Systems

1) High Performance Steel Coatings

2) High Performance Concrete Coatings

3) Pedestrian Traffic Coatings

4) Epoxy Coatings

5) Waterproofing Systems

VI. SUBMITTALS

A. SUBMITTAL LIST AND SCHEDULE

1. The Contractor shall prepare a detailed list and schedule of all submittal items to be sent to the Structural Engineer prior to the start of construction. This list shall be updated and revised and kept current as the job progresses. The submittal list shall be organized as shown below:

a. Shop Drawings

b. Design Calculations

c. Product Technical Data

d. Product MSDS/SDS

e. Certificates, Reports, and Other Literature

B. SUBMITTALS TO BE PROVIDED TO STRUCTURAL ENGINEER

1. Product Submittals: In addition to the submittals required by the project documents, the following submittals shall be provided:

a. Epoxy-Modified Cementitious Coating for Embedded Reinforcement

b. Concrete Repair Materials

c. Concrete Ready-Mix Design

d. Epoxy for Bonding Fresh Concrete to Hardened Concrete

e. Epoxy for Post-Installing Anchors

f. Post-Installed Anchors

g. Mechanical Splice Couplers

h. Epoxy Resin for Crack Injection

i. Welder Certifications

j. Welding Procedure

k. Weld Electrodes and Filler Metals

l. Bolts, Rivets, Rods, Nuts, Washers, and Associated Components

m. Cold Galvanizing Coating for Repair of Galvanized Steel

2. Submittal Requirements:

a. Contractor shall review and stamp all submittals and shop drawings.

b. All submittals shall be submitted in an electronic portable document format

(PDF).

c. Use of these drawings, specification, or other contract documents instead of producing and submitting project specific shop drawings indicates the Contractor's and their team's acceptance of the project requirements.

VII. SELECTIVE DEMOLITION

A. GENERAL REQUIREMENTS

1. The Contractor is responsible for the means and methods of demolition.

2. The Contractor shall use qualified, experienced personnel for demolition and removal operations. Perform demolition and removal operations in a careful and orderly manner to prevent hazards to persons, damage to property, and the spreading of dust and debris.

3. Do not permit portions of the structure to fall nor debris to drop except by methods which will ensure integrity of the structure.

4. Prior to the start of work, verify that the scope of demolition indicated on the contract documents shall not damage, cut or disrupt service of any mechanical system, electrical system or utility embedded in the existing structure

5. Do not remove more of the existing structure than indicated on contract documents.

Do not damage, mar, cut or deface the remaining structure or materials to be reused.

B. RESPONSIBILITY OF THE CONTRACTOR FOR STABILITY OF THE STRUCTURE

DURING DECONSTRUCTION / DEMOLITION

1. It is the responsibility of the Contractor to provide all required bracing during demolition to maintain the stability and safety of all structural elements during the demolition process. Contractor shall engage a professional engineer to survey condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during selective demolition operations.

C. MATERIAL OWNERSHIP

1. Demolished materials shall become the Contractor's property and shall be removed from Project site, except for items or materials indicated to be reused, salvaged, or otherwise indicated to remain Owner's property. The materials removed shall be disposed of in a proper and legal manner per federal, state, and local regulations.

VIII. CONSTRUCTION

A. CONTRACT DOCUMENTS

1. It is the responsibility of the Contractor to obtain all Contract Documents and the latest addenda. The Contractor shall be responsible for submitting these documents to all Subcontractors and Material Suppliers prior to the submittal of shop drawings, fabrication, and erection.

2. The Contract Documents represent the repaired structure. These documents generally do not indicate the means or methods of construction, except where specifically noted. The Contractor shall supervise and direct the work and shall be solely responsible for all construction means, methods, procedures, safety precautions, techniques, and sequences.

3. The Contractor shall coordinate openings through structural elements for utility penetrations. The Contractor shall verify the locations and sizes of the opening with the Mechanical, Electrical, Plumbing, Fire Protection, and Telecommunication drawings and the respective Subcontractors.

4. If certain elements are not fully depicted on the drawings or specified in the specifications, their construction shall be of the same quality depicted and specified in similar conditions and shall generally match the existing or surrounding construction conditions.

5. Notes, typical details, and schedules apply to all structural work unless otherwise noted. For conditions not specifically shown, provide details of a similar nature.

Verify applicability by submitting shop drawings for review.

6. Refer to the available existing record documents for complete information including the specified structural systems, reinforcement systems, presence of post-tensioning, previous repairs, alterations, modification, and other information relevant to the project.

7. The Contractor shall be responsible for developing and implementing engineering controls, work practices, and respiratory protection against toxic and hazardous substances including respirable crystalline silica according to California\Occupational Safety and Health Administration (OSHA) regulations.

8. Contractor shall pay all costs, including investigation and/or redesign, due to contractor's mis-location of structural elements or other lack of conformance with the contract documents to bring work in compliance with the contract documents.

B. CONTRACT DOCUMENT CONFLICTS

1. In cases of conflict within structural contract documents, structural drawings, general notes, and specifications, the strictest requirements shall govern.

C. ITEMS EMBEDDED IN CONCRETE STRUCTURES

1. The Contractor shall locate all embedded items with non-destructive methods before executing the work of these documents. Contractor shall mark on the structure the location of embedded items prior to beginning work.

2. Do not damage items embedded in concrete when performing the work required by these documents. Embedded items may include conventional reinforcement, prestressing reinforcement, dowels, embedded connections, electrical conduits, plumbing, and other construction elements.

3. Do not proceed with fabrication of new elements until items embedded in concrete have been located at the proposed anchorage locations. Contact Engineer if the depicted anchorage installation tolerances for the proposed post-installed anchors conflict with existing embedded items.

D. EXISTING CONDITIONS

1. Existing dimensions shown on the drawings are based on existing construction documents of the structure which are not survey grade. These dimensions are for reference only and should not be used for final construction or detailing. The Contractor shall verify all dimensions and conditions of existing construction at the project site. Report any relevant differenced from assumed conditions shown on the drawings to the Engineer prior to proceeding ordering materials, fabrication, erection and proceeding with the specified work.

2. The Contractor shall conduct a pre-construction survey to document site conditions prior to start of work. The survey shall document location and condition of any construction designated for removal and re-installation. The survey shall be submitted to the Owner and Engineer.

3. Work depicted on the drawings is existing, unless noted as new.

4. Existing construction shown on the drawings is based on existing construction documents and limited site observation. The drawings of existing construction are available for Contractor use and shall be referenced to understand existing conditions of the project site. The Contractor shall be knowledgeable of information depicted in available drawings relevant to the project site.

5. Use care when performing demolition, cutting, drilling, chipping, and other associated work of existing construction to protect the integrity of the structure. The Contractor shall notify the Owner of any architectural elements, MEP elements, or structural members, not designated for removal that interfere with the new work, prior to their removal.

6. The Contractor shall conduct a survey to locate all existing utilities including subgrade utilities prior to the start of construction. Protect utilities to remain in service. Existing civil, mechanical, electrical, plumbing, and emergency protection systems servicing any areas outside the work area shall be operational. Alternately, the Contractor shall establish temporary utility connections to keep existing service operational. Temporary and isolated interruption of these services shall be approved by the Owner.

7. The Contractor shall repair all damage caused during construction. Repairs shall be of similar materials and workmanship to restore conditions to levels acceptable to the Owner.

8. The Contractor shall shore existing construction when structural supports are removed. All shoring methods and sequencing of demolition shall be the responsibility of the Contractor and their engineer.

E. STABILITY OF THE STRUCTURE DURING CONSTRUCTION

1. Repairs of structural elements of the project have been designed to resist the gravity and lateral forces indicated in part Design Criteria. The ability of the structural to resist these forces is based on the completion of the specified work. It is the Contractor's responsibility to design, install, and maintain all required bracing and shoring during demolition and construction operation to ensure the safety and stability of the structure until all specified structural work at each isolated location is complete, structural epoxies are fully cured, and concrete elements have reached their specified strength.

F. CONSTRUCTION LOADS

1. The Contractor shall not overload the structure during construction. The Contractor shall be responsible for checking the adequacy of the structure to support any applied construction loads, including those due to construction vehicles or equipment, material handling or storage, shoring or reshoring, or any other construction activity. The Contractor shall submit calculations verifying the adequacy of the structure for any proposed construction loads that are in excess of the 50 PSF. Calculations shall be signed and sealed by an engineer licensed in the state where the project is located.

G. PROTECTION

1. The Contractor shall ensure that all means and methods used for demolition and construction will not cause damage to the adjacent properties, facilities and utilities.

2. The Contractor shall provide dust, odor, noise protection, and safety measures as necessary for the duration of construction. Provide all measures necessary to protect the existing structure, building interior, vehicles, machinery, facility patrons, and other persons during construction. Such measures shall include, but not limited to temporary bracing, shoring, formwork, protective enclosures, traffic controls, temporary wall partitions, overhead protection, and fencing.

3. The Contractor is advised to perform a photographic surveys or other means of documentation of the adjacent properties and building zones before the start of construction.

H. CONTRACTOR SUBSTITUTIONS

1. Any materials or products submitted for approval that are different from the material or products specified in the structural contract documents will be considered for approval only if the following criteria are satisfied:

a. A cost savings to the Owner is documented and submitted with the request.

b. Product specified is not readily available. Submit availability documentation with the substitution request.

c. Superior product at the same or lower cost. Submit cost analysis and performance documentation with the substitution request.

d. The material or product is in conformance with the requirements of the referenced building code and the ICC-ES evaluation report is submitted with the request. The ICC-ES evaluation report submitted must reference the building code under which the project is permitted. ICC-ESR evaluation reports that are expired or withdrawn will not be accepted.

2. Submittals not meeting the criteria above will not be considered.

I. STRUCTURAL ENGINEER'S ROLE DURING CONSTRUCTION

1. The Engineer does not have control of, and is not responsible for, construction means; methods; techniques; sequences; procedures; safety precautions; omission of the Contractor, Subcontractor, or any other persons performing work; or for the failure of any of them to carry out the work in conformance with the contract documents.

2. Periodic site observations by the Engineer are solely for the purpose of becoming generally familiar with the progress and to determine if the work is in general conformance with the intent of the construction documents. These limited site observations are not considered inspections and are not exhaustive or continuous in nature.

J. MAINTENANCE STATEMENT

1. All structures require periodic maintenance to extend lifespan and maintained structural integrity due to environment exposure. A planned program of maintenance shall be established and executed by the building Owner. This program shall include items such as but not limited, to coating of structural steel and concrete, replacement of deteriorated sealants, replacement of deteriorated expansion joints, repair of spalls and cracks in concrete, cleaning of floor drains, and pressure washing of exposed structural elements exposed to corrosive environments.

IX. DRAWING INTERPRETATION

A. TYPICAL DRAWING

1. Plans, elevations, sections, details, and schedules labeled “Typical” shall apply to all situations on the project that are the same or similar to the conditions depicted.

The title of the drawing describes the intent of these typical elements and shall apply whether or not they are referenced at each location. Decisions regarding applicability shall be determined by the Structural Engineer.

B. STRUCTURAL ABBREVIATIONS AND NOTATIONS

1. The following abbreviations and notations may appear on the drawings:

& And ~ Approximately @ At # Number Ø Round, Diameter ACI American Concrete Institute AISC American Institute of Steel Construction AL Aluminum ALT Alternate ASTM American Society for Testing and Materials AWS American Welding Society BI Bid Item BOF Bottom of Footing CANT Cantilever CBC California Building Code CG Center of Gravity CIP Cast In Place CL Center Line COL Column CONC Concrete CRSI Concrete Reinforcing Steel Institute CTR Center CSP Concrete Surface Profile DN Down DT Precast Double Tee E Existing EA Each EJ Expansion Joint ELEV Elevation ENGR Engineer ES Each Side ESR Evaluation Service Report EW Each Way EXIST Existing f'c Concrete Strength FDN Foundation FV Field Verify Fy Yield Strength Fu Ultimate strength GALV Galvanized

GEN General ICC International Code Council ICRI International Concrete Repair Institute INFO Information KIPS 1000 Pounds Force MAX Maximum MEP Mechanical, Electrical, & Plumbing MIN Minimum MISC Miscellaneous MSD Material Safety Data MSDS Material Safety Data Sheet N New NDT Nondestructive Testing NTS Not To Scale OC On Center PSF Pounds Per Square Foot QTY Quantity RDI Record Drawings Indicate REF Reference REINF Reinforcement SECT Section SHT Sheet SIM Similar SOG Slab-On-Grade SPA Spacing STD Standard SS Stainless Steel T&B Top and Bottom TEMP Temporary TOC Top Of Concrete TOS Top Of Steel, Top Of Slab TYP Typical UNO Unless Noted Otherwise WWR Welded Wire Reinforcement

C. STRUCTURAL SYMBOLS

1. Bid Items are indicated by: ##.##

09/30/2026

Details

M

AT

C H

L

IN

E A-

A

EXISTING SOIL BACKFILL

4.22 4.22

4.22

4.22

4.22

2.11A

2.11 4.12

2.11

REMOVE EXISTING PUMPS

AND DEMOLISH PEDESTALS.

PUMPS TO BE PROVIDED TO

OWNER

REMOVE EXIST PEDESTALS

/REBUILD PEDESTALS

MARKED (R). REMOVE SAVE

AND REINSTALL PUMP

EQUIPMENT SEE DETAIL 2.15

2.15TYP

2.11

4.12

4.12

4.22

4.12 4.22

2.11

2.11

2.03

3.14

4.22 24.11 24.12

REMOVE AND REINSTALL

FIBERGLASS GRATING

AFTER COATING

25.14

25.14

25.14

25.14

REMOVE EXIST SODIUM

HYPOCHLORITE

TANKS/PEDESTALS SEE BID

ITEM 3.81

(R) (R) (R) (R) (R)

REMOVE AND REINSTALL PIPES THAT

CONFLICT WITH COATING APPLICATION.

SOME PIPES MAY BE REMOVED

PERMANENTLY PER OWNERS DIRECTION

SEE BID ITEM 0.06

CHEMICAL FEED/

STORAGE ROOM

SODIUM

HYPOCHLORITE TANK

TO BE DEMOLISHED

SODIUM

HYPOCHLORITE TANK

TO BE DEMOLISHED

SODIUM

HYPOCHLORITE TANK

TO BE DEMOLISHED

SODIUM

HYDROXIDE

TANK TO BE

DEMOLISHED

SODIUM

HYDROXIDE

TANK TO BE

DEMOLISHED

FERRIC

CHLORIDE

TANK

FERRIC

CHLORIDE

TANK

FERRIC

CHLORIDE

TANK GRIT

STORAGE

HOPPER

GRIT

STORAGE

HOPPER

GRIT

STORAGE

HOPPER

GRIT

STORAGE

HOPPER

MECHANICAL

ROOM

MCC ROOM

PR

O

JE

C

T

D R

AW

IN

G

FR

ES

N O

-C

LO

VI

S

R W

R F

H

EA

D W

O R

KS

B

U

IL

D

IN

G R

EP

AI

R S

- P H

AS

E

W

J

EN

SE

N

A

VE

, F R

ES

N

O , C

AL

IF

O R

N

IA

ARCHITECT / ENGINEER STAMP

SHEET NUMBER

Date Revision / SubmissionNo.

09/01/2025 Issued For Owners Review1

Checked by: PRG

Drawn by: JU, PG

Project Number: 24x032 in fo pc ub ed as so ci at es .c om

Ph on e:

.9

.8

P c u b ed

A ss o c ia te s C o ns u lt in g E ng in ee r s

Pa ss io n

· P rid e

· P er fo rm an ce

10/25/2025 Issued For Plan Check2

12/17/2025 Issued for Bid3

PL

A

N F

IR

ST

L

EV

EL

W

ES

T

S1.0 N

PLAN FIRST LEVEL WEST

SCALE: NTS1

LEGEND

SYMBOL DESCRIPTION

BID ITEM/BID ITEM DETAIL

(SEE SHEETS S2.0 AND S2.1 FOR DETAILS

09/30/2026

AND REBUILD PEDESTALS

C H

L

IN

E A-

A

EXISTING SOIL BACKFILL

4.22

4.22

4.22

2.03

3.14

2.11

2.11

2.03TYP

22.03

22.03

22.03

7.12 7.13

4.22 24.11 24.12

24.11 24.12

MECHANICAL

ROOM

MCC ROOM

OPEN TO

BELOW

OPEN TO

BELOW

OPEN TO

BELOW

PUMP MEZZANINE ROOM

ODOR CONTROL ROOM

MCC ROOM

SAMPLING ROOM PR

O

JE

C

T

D R

AW

IN

G

FR

ES

N O

-C

LO

VI

S

R W

R F

H

EA

D W

O R

KS

B

U

IL

D

IN

G R

EP

AI

R S

- P H

AS

E

W

J

EN

SE

N

A

VE

, F R

ES

N

O , C

AL

IF

O R

N

IA

ARCHITECT / ENGINEER STAMP

SHEET NUMBER

Date Revision / SubmissionNo.

09/01/2025 Issued For Owners Review1

Checked by: PRG

Drawn by: JU, PG

Project Number: 24x032 in fo pc ub ed as so ci at es .c om

Ph on e:

.9

.8

P c u b ed

A ss o c ia te s C o ns u lt in g E ng in ee r s

Pa ss io n

· P rid e

· P er fo rm an ce

10/25/2025 Issued For Plan Check2

12/17/2025 Issued for Bid3

PL

A

N F

IR

ST

L

EV

EL

E

A

ST

S1.1 N

PLAN FIRST LEVEL EAST

SCALE: NTS1

LEGEND

SYMBOL DESCRIPTION

BID ITEM/BID ITEM DETAIL

(SEE SHEETS S2.0 AND S2.1 FOR DETAILS

09/30/2026

C H

L

IN

E A-

A

0.07 0.08 2.12 25.15

0.07 0.08 2.11 25.15

0.07 0.08 2.11 4.12

2.12 S2.0

2.12 S2.0

25.15

6'-0" 3'-0" 14'-0"

'-0

'-0

'-7

/4

6'-0"

'-7

/4

'-0

'-0

6'-0"

FLOW SPLIT

STRUCTURE

PARSHALL FLUME

PARSHALL FLUME

GRIT BASIN

GRIT BASIN

GRIT BASIN

GRIT BASIN

PR

O

JE

C

T

D R

AW

IN

G

FR

ES

N O

-C

LO

VI

S

R W

R F

H

EA

D W

O R

KS

B

U

IL

D

IN

G R

EP

AI

R S

- P H

AS

E

W

J

EN

SE

N

A

VE

, F R

ES

N

O , C

AL

IF

O R

N

IA

ARCHITECT / ENGINEER STAMP

SHEET NUMBER

Date Revision / SubmissionNo.

09/01/2025 Issued For Owners Review1

Checked by: PRG

Drawn by: JU, PG

Project Number: 24x032 in fo pc ub ed as so ci at es .c om

Ph on e:

.9

.8

P c u b ed

A ss o c ia te s C o ns u lt in g E ng in ee r s

Pa ss io n

· P rid e

· P er fo rm an ce

10/25/2025 Issued For Plan Check2

12/17/2025 Issued for Bid3

PL

A

N C

H A

N N

EL

L

EV

EL

W

ES

T

S1.2 N

PLAN CHANNEL LEVEL WEST

SCALE: NTS1

LEGEND

SYMBOL DESCRIPTION

BID ITEM/BID ITEM DETAIL

(SEE SHEETS S2.0 AND S2.1 FOR DETAILS

C H

L

IN

E A-

A

SLOPE

PR

O

JE

C

T

D R

AW

IN

G

FR

ES

N O

-C

LO

VI

S

R W

R F

H

EA

D W

O R

KS

B

U

IL

D

IN

G R

EP

AI

R S

- P H

AS

E

W

J

EN

SE

N

A

VE

, F R

ES

N

O , C

AL

IF

O R

N

IA

ARCHITECT / ENGINEER STAMP

SHEET NUMBER

Date Revision / SubmissionNo.

09/01/2025 Issued For Owners Review1

Checked by: PRG

Drawn by: JU, PG

Project Number: 24x032 in fo pc ub ed as so ci at es .c om

Ph on e:

.9

.8

P c u b ed

A ss o c ia te s C o ns u lt in g E ng in ee r s

Pa ss io n

· P rid e

· P er fo rm an ce

10/25/2025 Issued For Plan Check2

12/17/2025 Issued for Bid3

PL

A

N C

H A

N N

EL

L

EV

EL

E A

ST

S1.3 N

PLAN CHANNEL LEVEL EAST (NO WORK SPECIFIED ON THIS SHEET)

SCALE: NTS1

LEGEND

SYMBOL DESCRIPTION

BID ITEM/BID ITEM DETAIL

(SEE SHEETS S2.0 AND S2.1 FOR DETAILS

4.22

4.22

2.11

7.91

4.22 7.914.22 7.914.22 7.91

4.22 7.91 4.22 7.91 4.22 7.91

2.04

2.04

2.04

22.04A

31.05

31.05

2.11 25.13A

2.11

2.11 25.13A

25.13

M

AT

C H

L

IN

E A-

A

REMOVABLE METAL

ROOF COVER

REMOVABLE METAL

ROOF COVER

REMOVABLE METAL

ROOF COVER

REMOVABLE METAL

ROOF COVER

REMOVABLE METAL

ROOF COVER REMOVABLE METAL

ROOF COVER

EXTERIOR FLOOR

DECK

FAN ROOM

ODOR CONTROL

ROOM

EXTERIOR FLOOR

DECK

4.22 24.11 24.127.14

PR

O

JE

C

T

D R

AW

IN

G

FR

ES

N O

-C

LO

VI

S

R W

R F

H

EA

D W

O R

KS

B

U

IL

D

IN

G R

EP

AI

R S

- P H

AS

E

W

J

EN

SE

N

A

VE

, F R

ES

N

O , C

AL

IF

O R

N

IA

ARCHITECT / ENGINEER STAMP

SHEET NUMBER

Date Revision / SubmissionNo.

09/01/2025 Issued For Owners Review1

Checked by: PRG

Drawn by: JU, PG

Project Number: 24x032 in fo pc ub ed as so ci at es .c om

Ph on e:

.9

.8

P c u b ed

A ss o c ia te s C o ns u lt in g E ng in ee r s

Pa ss io n

· P rid e

· P er fo rm an ce

10/25/2025 Issued For Plan Check2

12/17/2025 Issued for Bid3

PL

A

N S

EC

O

N D

L

EV

EL

W

ES

T

S1.4 N

PLAN SECONDLEVEL WEST

SCALE: NTS1

LEGEND

SYMBOL DESCRIPTION

BID ITEM/BID ITEM DETAIL

(SEE SHEETS S2.0 AND S2.1 FOR DETAILS

3.02

4.12

4.22

2.11

4.22

2.11 25.13A

2.11

2.04

2.04

22.04A

31.05

31.05

4.22 24.11 24.12

2.11 25.13A

2.11

2.11 25.13A

25.13

4.22

2.04

2.04

4.22

4.12

4.12

M

AT

C H

L

IN

E A-

A

FAN ROOM

ODOR CONTROL

ROOM

EXTERIOR FLOOR

DECK

GRIT SCREENNG

ROOM OPEN TO BELOW

OPEN TO BELOW

MECHANICAL ROOM

CONTROL ROOM

EXTERIOR BALCONY

7.14

PR

O

JE

C

T

D R

AW

IN

G

FR

ES

N O

-C

LO

VI

S

R W

R F

H

EA

D W

O R

KS

B

U

IL

D

IN

G R

EP

AI

R S

- P H

AS

E

W

J

EN

SE

N

A

VE

, F R

ES

N

O , C

AL

IF

O R

N

IA

ARCHITECT / ENGINEER STAMP

SHEET NUMBER

Date Revision / SubmissionNo.

09/01/2025 Issued For Owners Review1

Checked by: PRG

Drawn by: JU, PG

Project Number: 24x032 in fo pc ub ed as so ci at es .c om

Ph on e:

.9

.8

P c u b ed

A ss o c ia te s C o ns u lt in g E ng in ee r s

Pa ss io n

· P rid e

· P er fo rm an ce

10/25/2025 Issued For Plan Check2

12/17/2025 Issued for Bid3

PL

A

N S

EC

O

N D

L

EV

EL

E

A

ST

S1.5 N

PLAN SECOND LEVEL EAST

SCALE: NTS1

LEGEND

SYMBOL DESCRIPTION

BID ITEM/BID ITEM DETAIL

(SEE SHEETS S2.0 AND S2.1 FOR DETAILS

09/30/2026

(ADDENDUM 3)

4.22 24.11 24.12

O

JE

C

T

D R

AW

IN

G

FR

ES

N O

-C

LO

VI

S

R W

R F

H

EA

D W

O R

KS

B

U

IL

D

IN

G R

EP

AI

R S

- P H

AS

E

W

J

EN

SE

N

A

VE

, F R

ES

N

O , C

AL

IF

O R

N

IA

ARCHITECT / ENGINEER STAMP

SHEET NUMBER

Date Revision / SubmissionNo.

09/01/2025 Issued For Owners Review1

Checked by: PRG

Drawn by: JU, PG

Project Number: 24x032 in fo pc ub ed as so ci at es .c om

Ph on e:

.9

.8

P c u b ed

A ss o c ia te s C o ns u lt in g E ng in ee r s

Pa ss io n

· P rid e

· P er fo rm an ce

10/25/2025 Issued For Plan Check2

12/17/2025 Issued for Bid3

PL

A

N R

O O

F

LE

VE

L

S1.6 N

PLAN ROOF LEVEL

SCALE: NTS1

LEGEND

SYMBOL DESCRIPTION

BID ITEM/BID ITEM DETAIL

(SEE SHEETS S2.0 AND S2.1 FOR DETAILS

JE

C

T

D R

AW

IN

G

FR

ES

N O

-C

LO

VI

S

R W

R F

H

EA

D W

O R

KS

B

U

IL

D

IN

G R

EP

AI

R S

- P H

AS

E

W

J

EN

SE

N

A

VE

, F R

ES

N

O , C

AL

IF

O R

N

IA

ARCHITECT / ENGINEER STAMP

SHEET NUMBER

Date Revision / SubmissionNo.

09/01/2025 Issued For Owners Review1

Checked by: PRG

Drawn by: JU, PG

Project Number: 24x032 in fo pc ub ed as so ci at es .c om

Ph on e:

.9

.8

P c u b ed

A ss o c ia te s C o ns u lt in g E ng in ee r s

Pa ss io n

· P rid e

· P er fo rm an ce

10/25/2025 Issued For Plan Check2

12/17/2025 Issued for Bid3

D

ET

A

IL

S -1

S2.0

NOTES:

1. PROTECT EXISTING REINFORCEMENT FROM DAMAGE DURING CHIPPING AND GRINDING.

2. CLEAN AND COAT ALL EXISTING REINFORCEMENT WITH 3 COMPONENT CEMENTITIOUS

EPOXY COATING PER SECTION "CONCRETE REPAIRS."

3. PROVIDE 3/4" CLEARANCE AROUND ALL EXPOSED REINFORCEMENT IN THE REPAIR

CAVITY.

4. EXISTING REINFORCEMENT WITH SECTION LOSS GREATER THAN 10% SHALL BE

SUPPLEMENTED WITH ADDITIONAL REINFORCEMENT. REFER TO TYPICAL REPAIR DETAIL

FOR SUPPLEMENTAL REINFORCEMENT.

TYPICAL CONCRETE CURB REPAIR

SCALE: NTS2.03

EXISTING REINFORCEMENT, TYP

REMOVE CONCRETE WITHIN SHADED

SECTION & INSTALL NEW CONCRETE

REPAIR MORTAR, TYP

EXISTING SPALL OR DELAMINATION TO

BE REPAIRED

GRIND REPAIR PERIMETER TO A DEPTH OF 1/2". INITIAL

GRINDING SHALL BE PERPENDICULAR TO THE CONCRETE

SURFACE, TYP.

CONCRETE REMOVAL LIMITS, ROUGHEN

CONCRETE CAVITY TO ICRI CSP-9, TYP

VARIES

INSTALL REPAIR FLUSH WITH EXISTING

CONCRETE, REPAIR FINISH SHALL

MATCH THE EXISTING FINISH, TYP

NOTES:

1. PROTECT EXISTING REINFORCEMENT FROM DAMAGE DURING CHIPPING AND GRINDING.

2. RESLOPEING OF CONCRETE SHALL ELIMINATE ALL LOCAL STANDING WATER ISSUES AND

PROVIDE A CONDITION THAT PRODUCES SLOPE TO DRAIN.

3. REMOVE CONCRETE SUBSTRATE FOR RESURFACING OF CONCRETE EXHIBITING SCOUR,

CHEMICAL ATTACH, OR OTHER FORMS OF EROSION TO SOUND CONCRETE SUBSTRATE.

4. DO NOT RESLOPE CONCRETE IN ADA PATHS OF TRAVEL UNLESS RE-SLOPING WILL BE

ADA COMPLIANT.

TYPICAL RESLOPE / RESURFACE

EXISTING CONCRETE

SCALE: NTS2.04

GRIND REPAIR PERIMETER TO A DEPTH OF 1/2". INITIAL GRINDING

SHALL BE PERPENDICULAR TO THE CONCRETE SURFACE, TYP.

REMOVE CONCRETE WITHIN SHADED

SECTION & INSTALL NEW CONCRETE

REPAIR MORTAR, TYP

EXISTING CONCRETE FLOOR ADJACENT TO AREA TO BE

RESLOPED AND/OR RESURFACED

INSTALL EPOXY BONDED REPAIR FLUSH WITH

EXISTING CONCRETE, REPAIR FINISH SHALL

MATCH THE EXISTING FINISH, TYP

CONCRETE REMOVAL LIMITS, ROUGHEN

CONCRETE CAVITY TO ICRI CSP-9, TYP

EXISTING REINFORCEMENT, TYP

1" MIN THICKNESS FOR VEHICULAR TRAFFIC SURFACES,

1/2" MIN THICKNESS FOR PEDESTRIAN TRAFFIC SURFACES

VARIES

VA

R

IE

S

NOTES:

1. PROTECT EXISTING REINFORCEMENT FROM DAMAGE DURING CHIPPING AND GRINDING.

2. CLEAN AND COAT ALL EXISTING REINFORCEMENT WITH 3 COMPONENT CEMENTITIOUS

EPOXY COATING PER SECTION "CONCRETE REPAIRS."

3. PROVIDE 3/4" CLEARANCE AROUND ALL EXPOSED REINFORCEMENT IN THE REPAIR

CAVITY.

4. EXISTING REINFORCEMENT WITH SECTION LOSS GREATER THAN 10% SHALL BE

SUPPLEMENTED WITH ADDITIONAL REINFORCEMENT. REFER TO TYPICAL REPAIR DETAIL

FOR SUPPLEMENTAL REINFORCEMENT.

TYPICAL PARTIAL DEPTH CONCRETE

SLAB REPAIR

SCALE: NTS2.11

GRIND REPAIR PERIMETER TO A DEPTH OF 1/2". INITIAL GRINDING

SHALL BE PERPENDICULAR TO THE CONCRETE SURFACE, TYP.

EXISTING SPALL OR DELAMINATION TO BE REPAIRED, TYP

REMOVE CONCRETE WITHIN SHADED

SECTION & INSTALL NEW CONCRETE

REPAIR MORTAR, TYP

EXISTING CONCRETE SLAB

INSTALL REPAIR FLUSH WITH EXISTING CONCRETE,

REPAIR FINISH SHALL MATCH THE EXISTING FINISH, TYP

CONCRETE REMOVAL LIMITS, ROUGHEN

CONCRETE CAVITY TO ICRI CSP-9, TYP

EXISTING REINFORCEMENT, TYP

REMOVE ALL UNSOUND CONCETE APPROX 6" CONCRETE BY

CHIPPING OR HYDRO DEMOLITION

±6

2' -0

SAVE EXISTING REINFORCING STEEL. ADD/SPLICE STEEL THAT IS

DAMAGED SEE 5.01

ROUGHEN SURFACE TO ICRI CSP-9

PLACE NEW CONCRETE OVERLAY MAINTAIN

EXISTING SLOPES. MATCH EXIST FINISH

TYPICAL PARTIAL DEPTH CONCRETE

SLAB REPAIR -6" DEPTH

SCALE: NTS2.11A

NOTES:

1. PROTECT EXISTING REINFORCEMENT FROM DAMAGE DURING CHIPPING AND GRINDING.

2. CLEAN AND COAT ALL EXISTING REINFORCEMENT WITH 3 COMPONENT CEMENTITIOUS

EPOXY COATING PER SECTION "CONCRETE REPAIRS."

3. EXISTING REINFORCEMENT WITH SECTION LOSS GREATER THAN 10% SHALL BE

SUPPLEMENTED WITH ADDITIONAL REINFORCEMENT. REFER TO TYPICAL REPAIR DETAIL

FOR SUPPLEMENTAL REINFORCEMENT.

REMOVE EXIST NON-SHRINK GROUT

FROM FLOOR AND WALLS IN FLUME

AREA WITH FORMED AND POURED

SELF CONSOLIDATING CONCRETE.

FINAL GEOMETRY OF THE FLUME TO

BE DETERMINED BASED ON EXISTING

CONDITIONS

8'-7" 13'-11"

6'

-5

±8

#4 HOOKED DOWELS @ 12" OC EW DRILL AND EPOXY INTO

EXISTING STRUCTURAL SLAB MIN EMBED 6"

1 2"

VA

R

IE

S

#4@12" OC EW MIN LAP IN IN EACH DIRECTION 2'-0"

FLUME GROUT REPLACEMENT

SCALE: NTS2.12

2'-0"

SHAPED FLUME MATCH EXISTING SHAPE

REMOVE NON-SHRINK GROUT. FORM AND POUR WITH SELF

CONSOLIDATING CONCRETE

ROUGHEN SURFACE TO ICRI CSP-9

REMOVE EXISTING EPOXY COATING. INSTALL

NEW 250MIL EPOXY COATING IN CHANNEL AND

FLUME AREA

6"

1' -1

/2

6'-0" 3'-0" 14'-0"

EQUIPMENT PEDESAL REPLACEMENT

SCALE: NTS2.15

NOTES:

1. REMOVE EXISTING EQUIPMENT PAD. REPLACE WITH SAME SIZE AND LOCATION

2. PROTECT EXISTING REINFORCEMENT ROM DAMAGE DURING CHIPPING AND GRINDING.

M

AT

C H

E

XI

ST

MATCH EXIST

REPLACE EXISTING EQUIPMENT

PAD WITH NEW PAD MATCH

EXIST SIZE AND LOCATION

#4@ 12" OC ALONG PERIMETER

#4@8" HORIZ

ROUGHEN AREA TO ICRI -CSP9

DRILL AND EPOXY VERTICAL

REBARS INTO EXIST SLAB MIN

EMBED 6"

EXIST SLAB

NOTES:

1. PROTECT EXISTING REINFORCEMENT FROM DAMAGE DURING CHIPPING AND GRINDING.

2. CLEAN AND COAT ALL EXISTING REINFORCEMENT WITH 3 COMPONENT CEMENTITIOUS

EPOXY COATING PER SECTION "CONCRETE REPAIRS."

3. PROVIDE 3/4" CLEARANCE AROUND ALL EXPOSED REINFORCEMENT IN THE REPAIR

CAVITY.

4. EXISTING REINFORCEMENT WITH SECTION LOSS GREATER THAN 10% SHALL BE

SUPPLEMENTED WITH ADDITIONAL REINFORCEMENT. REFER TO TYPICAL REPAIR DETAIL

FOR SUPPLEMENTAL REINFORCEMENT.

CONCRETE REMOVAL LIMITS, ROUGHEN

CONCRETE CAVITY TO ICRI CSP-9, TYP

REMOVE CONCRETE WITHIN SHADED SECTION AND

INSTALL NEW CONCRETE REPAIR MORTAR, TYP

TYPICAL PARTIAL DEPTH CONCRETE

BEAM REPAIR

SCALE: NTS3.14

GRIND REPAIR PERIMETER TO A DEPTH OF 1/2". INITIAL

GRINDING SHALL BE PERPENDICULAR TO THE CONCRETE

SURFACE, TYP.

EXISTING SPALL OR DELAMINATION TO BE REPAIRED, TYP

INSTALL REPAIR FLUSH WITH EXISTING CONCRETE,

REPAIR FINISH SHALL MATCH THE EXISTING FINISH, TYP

EXISTING REINFORCEMENT, TYP

EXISTING CONCRETE BEAM

EXISTING CONCRETE SLAB

VA

R

IE

S

VARIES

VARIES

TYPICAL PARTIAL DEPTH CONCRETE

COLUMN REPAIR

SCALE: NTS4.11

NOTES:

1. PROTECT EXISTING REINFORCEMENT FROM DAMAGE DURING CHIPPING AND GRINDING.

2. CLEAN AND COAT ALL EXISTING REINFORCEMENT WITH 3 COMPONENT CEMENTITIOUS

EPOXY COATING PER SECTION "CONCRETE REPAIRS."

3. PROVIDE 3/4" CLEARANCE AROUND ALL EXPOSED REINFORCEMENT IN THE REPAIR

CAVITY.

4. EXISTING REINFORCEMENT WITH SECTION LOSS GREATER THAN 10% SHALL BE

SUPPLEMENTED WITH ADDITIONAL REINFORCEMENT. REFER TO TYPICAL REPAIR DETAIL

FOR SUPPLEMENTAL REINFORCEMENT.

VARIES

VA

R

IE

S

EXISTING SPALL OR DELAMINATION TO BE REPAIRED

CONCRETE REMOVAL LIMITS, ROUGHEN

CONCRETE CAVITY TO ICRI CSP-9.

EXISTING REINFORCEMENT, TYP

REMOVE CONCRETE WITHIN SHADED SECTION AND

INSTALL NEW CONCRETE REPAIR MORTAR

GRIND REPAIR PERIMETER TO A DEPTH OF 1/2".

INITIAL GRINDING SHALL BE PERPENDICULAR TO

THE CONCRETE SURFACE

INSTALL REPAIR FLUSH WITH EXISTING CONCRETE,

REPAIR FINISH SHALL MATCH THE EXISTING FINISH

EXISTING CONCRETE COLUMN

TYPICAL PARTIAL DEPTH CONCRETE

WALL REPAIR

SCALE: NTS4.12

NOTES:

1. PROTECT EXISTING REINFORCEMENT FROM DAMAGE DURING CHIPPING AND GRINDING.

2. CLEAN AND COAT ALL EXISTING REINFORCEMENT WITH 3 COMPONENT CEMENTITIOUS

EPOXY COATING PER SECTION "CONCRETE REPAIRS."

3. PROVIDE 3/4" CLEARANCE AROUND ALL EXPOSED REINFORCEMENT IN THE REPAIR

CAVITY.

4. EXISTING REINFORCEMENT WITH SECTION LOSS GREATER THAN 10% SHALL BE

SUPPLEMENTED WITH ADDITIONAL REINFORCEMENT. REFER TO TYPICAL REPAIR DETAIL

FOR SUPPLEMENTAL REINFORCEMENT.

VARIES

VA

R

IE

S

EXISTING SPALL OR DELAMINATION TO BE REPAIRED

CONCRETE REMOVAL LIMITS, ROUGHEN CONCRETE

CAVITY TO ICRI CSP-9.

EXISTING REINFORCEMENT, TYP

REMOVE CONCRETE WITHIN SHADED SECTION AND

INSTALL NEW CONCRETE REPAIR MORTAR

GRIND REPAIR PERIMETER TO A DEPTH OF 1/2".

INITIAL GRINDING SHALL BE PERPENDICULAR TO

THE CONCRETE SURFACE

INSTALL REPAIR FLUSH WITH EXISTING CONCRETE,

REPAIR FINISH SHALL MATCH THE EXISTING FINISH

EXISTING CONCRETE WALL

SHALLOW PARTIAL DEPTH CONCRETE

WALL REPAIR

SCALE: NTS4.12A

NOTES:

1. PROTECT EXISTING REINFORCEMENT FROM DAMAGE DURING CHIPPING AND GRINDING.

2. CLEAN AND COAT ALL EXISTING REINFORCEMENT WITH 3 COMPONENT CEMENTITIOUS

EPOXY COATING PER SECTION "CONCRETE REPAIRS."

3. PROVIDE 3/4" CLEARANCE AROUND ALL EXPOSED REINFORCEMENT IN THE REPAIR

CAVITY.

VA

R

IE

S

EXISTING SPALL OR DELAMINATION TO BE REPAIRED

CONCRETE REMOVAL LIMITS, ROUGHEN CONCRETE

CAVITY TO ICRI CSP-6.

EXISTING REINFORCEMENT, TYP

REMOVE CONCRETE WITHIN SHADED SECTION AND INSTALL

NEW CONCRETE REPAIR MORTAR

GRIND REPAIR PERIMETER TO A DEPTH OF 1/4". INITIAL

GRINDING SHALL BE PERPENDICULAR TO THE CONCRETE

SURFACE

INSTALL REPAIR FLUSH WITH EXISTING CONCRETE, REPAIR

FINISH SHALL MATCH THE EXISTING FINISH

EXISTING CONCRETE WALL

16" Ø X 1-3/4" TAPCON ANCHORS @ 8"EW (MIN 2 IN EACH

DIRECTION) TIE ANCHOR HEADS WITH 12 GAUGE SS WIRES.

EXISTING CONCRETE SLAB

EXISTING CONCRETE BEAM

EXISTING CONCRETE WALL

EXISTING CONCRETE WALL CRACKS

TO BE EPOXY INJECTED

NOTES:

1. INJECT CRACKS > 116" WIDE.

2. EPOXY SURFACE SEAL, EPOXY RESIN, PORTS, AND INJECTION EQUIPMENTS SHALL BE AS

SPECIFIED IN SECTION "EPOXY INJECTION GROUTING."

3. INJECTION PORT SPACING SHALL NOT EXCEED THE LESSER OF 12" OR THE THICKNESS OF

THE WALL. LOCALLY DECREASE PORT SPACING AS REQUIRED TO ENSURE PORT TO PORT

RESIN FLOW IS ARCHIVED.

4. AFTER EPOXY RESIN IS CURED REMOVE THE EPOXY SURFACE SEAL AND PORTS. RESTORE

THE CONCRETE FINISH TO MATCH THE EXISTING CONDITION.

TYPICAL EPOXY INJECTION OF

CONCRETE WALL CRACKING

SCALE: NTS4.22

EXISTING CONCRETE COLUMN

NOTES:

1. REMOVE EXISTING CENTERING PIN IF APPLICABLE. MARK EDGE LOCATION FOR

CENTERED COUPLER ON NEW AND EXISTING REINFORCEMENT WITH A WAX PEN

OR CHALK.

2. MECHANICAL COUPLERS SHALL MEET THE ACI 318 REQUIREMENTS FOR TYPE II

MECHANICAL COUPLERS THAT DEVELOP THE FULL TENSION CAPACITY OF THE

REINFORCEMENT BEING SPLICED AND HAVE A VALID ICC EVALUATION REPORT.

ACCEPTABLE MECHANICAL COUPLERS ARE ERICO PRODUCTS, INC NVENT

LENTON COUPLER S2 SHEAR BOLT (ER-129), BARSPLICE PRODUCTS INC ZAP

SCREWLOCK (ESR-3517), OR DAYTON SUPERIOR CORPORATION BAR-LOCK

COUPLER SYSTEM, L-SERIES (ER-319).

3. MECHANICAL COUPLERS MAY NOT BE USED WITH SQUARE REINFORCEMENT.

4. LAP SPLICES MAY BE USED INSTEAD OF MECHANICAL COUPLERS WHERE

CONCRETE REMOVAL FOR SPALL / DELAMINATION REPAIR PROVIDES SUFFICIENT

LENGTH OF BAR TO LAP AGAINST. ENLARGING CONCRETE REMOVAL AREA

SIGNIFICANTLY TO ACCOMMODATE LAP SPLICES LENGTHS INSTEAD OF USING

MECHANICAL COUPLERS IS NOT ACCEPTABLE.

5. SUPPLEMENTAL REINFORCEMENT ONLY NEEDS TO MAKE UP THE PERCENTAGE

OF REINFORCEMENT LOST BY CORROSION OR OTHER DAMAGE.

6. SUPPLEMENTAL REINFORCEMENT IS INCIDENTAL ON THE APPROPRIATE BID ITEM.

TYPICAL SUPPLEMENTING OF CORRODED CONCRETE REINFORCING STEEL

SCALE: NTS

TYPICAL MECHANICAL

COUPLER SPLICE

NEW MECHANICAL COUPLER

LOCATION DURING REINFORCEMENT

ALIGNMENT, NOTE 1

NEW MECHANICAL COUPLER IN

FINAL LOCATION, NOTE 1

EXISTING REINFORCEMENT

NEW REINFORCEMENT

EDGE OF CONCRETE

REMOVAL FOR SPALL

REPAIR.

CLASS B LAP SPLICE FOR

SUPPLEMENTAL REINFORCEMENT

CLASS B LAP SPLICE FOR

SUPPLEMENTAL REINFORCEMENT

SECTION LOSS IN EXISTING REINFORCEMENT

NEW SUPPLEMENTAL REINFORCEMENT

TYPICAL LAP SPLICE AT REINFORCEMENT DAMAGE

5.01

DEVELOPED REINFORCEMENT SUPPLEMENT PERCENTAGE AND LAP SPLICE LENGTH

EXISTING CORRODED REINFORCEMENT (GRADE 60)

#3 Ø

#4 Ø

#5 Ø

SU

PP

LE

M

EN

TA

L

RE

IN

FO

RC

EM

EN

T

(G

RA

DE

0)

#3 100% 55% 35% #4 - 100% 64% #5 100% #6

#6 Ø

25% 45% 70%

#7

#7 Ø

18% 33% 51% 73%

#8 Ø

13% 25% 39% 55% 75%

#9 Ø

11% 20% 31% 44% 60%

#10 Ø

8% 15% 24% 34% 47%

#11 Ø

7% 12% 19% 28% 38%

1"

11% 20% 31% 44% 60%

#8 79% 62% 50% 79% #9 78% 64%

#10 - 81%

1-1/8"

8% 15% 24% 34% 47% 62% 78%

1-1/4"

7% 12% 19% 28% 38% 50% 64%

Ø DESIGNATES MODERN DEFORMED ROUND REINFORCEMENT, □ DESIGNATES HISTORIC SQUARE REINFORCEMENT

100%

CLASS B

5000 PSI

=1.00

LAP SPLICE

LENGTH

1'-6"

1'-11" 2'-4"

2'-10" 4'-1" 4'-8" 5'-3"

5'-11"81% - - - - - - 100% - 100%

- - - - - - 100%

- - - - - 100%

- - - - 100%

- - - 100%

1/2"

44% 80%

100%

CONCRETE REMOVAL LIMITS, ROUGHEN CONCRETE

CAVITY TO ICRI CSP-9, TYP

REMOVE CONCRETE WITHIN SHADED SECTION & INSTALL

NEW CONCRETE REPAIR MORTAR, TYP

GRIND REPAIR PERIMETER TO A DEPTH OF 1/2". INITIAL GRINDING SHALL

BE PERPENDICULAR TO THE CONCRETE SURFACE, TYP.

EXISTING SPALL OR DELAMINATION TO BE REPAIRED, TYP

EXISTING REINFORCEMENT, TYP

NOTES:

1. PROTECT EXISTING REINFORCEMENT FROM DAMAGE DURING CHIPPING AND GRINDING.

2. CLEAN AND COAT ALL EXISTING REINFORCEMENT WITH 3 COMPONENT CEMENTITIOUS

EPOXY COATING PER SECTION "CONCRETE REPAIRS."

3. PROVIDE 3/4" CLEARANCE AROUND ALL EXPOSED REINFORCEMENT IN THE REPAIR

CAVITY.

4. EXISTING REINFORCEMENT WITH SECTION LOSS GREATER THAN 10% SHALL BE

SUPPLEMENTED WITH ADDITIONAL REINFORCEMENT. REFER TO TYPICAL REPAIR DETAIL

FOR SUPPLEMENTAL REINFORCEMENT.

TYPICAL PARTIAL DEPTH CONCRETE

SOFFIT REPAIR

SCALE: NTS3.11

VARIES

VA

R

IE

S

INSTALL REPAIR FLUSH WITH EXISTING CONCRETE, REPAIR FINISH

SHALL MATCH THE EXISTING FINISH, TYP

JE

C

T

D R

AW

IN

G

FR

ES

N O

-C

LO

VI

S

R W

R F

H

EA

D W

O R

KS

B

U

IL

D

IN

G R

EP

AI

R S

- P H

AS

E

W

J

EN

SE

N

A

VE

, F R

ES

N

O , C

AL

IF

O R

N

IA

ARCHITECT / ENGINEER STAMP

SHEET NUMBER

Date Revision / SubmissionNo.

09/01/2025 Issued For Owners Review1

Checked by: PRG

Drawn by: JU, PG

Project Number: 24x032 in fo pc ub ed as so ci at es .c om

Ph on e:

.9

.8

P c u b ed

A ss o c ia te s C o ns u lt in g E ng in ee r s

Pa ss io n

· P rid e

· P er fo rm an ce

10/25/2025 Issued For Plan Check2

12/17/2025 Issued for Bid3

D

ET

A

IL

S -2

S2.1

TYPICAL ROUT AND SEAL CRACK

SCALE: NTS22.01

NOTES:

1. NON-DESTRUCTIVELY LOCATE EMBEDDED ELEMENTS. NOTIFY ENGINEER IF DEPTH OF

ROUTED CRACK INTERFERES WITH EMBEDDED ELEMENTS PRIOR TO ROUTING CRACKS.

2. REMOVE EXISTING JOINT SEALANT IF CRACK HAS BEEN PREVIOUSLY ROUTED.

3. CLEAN ROUTED CAVITY TO REMOVE LATENCIES AND PRIME ROUTED CAVITY.

4. SEALANT SHALL BE TRAFFIC GRADE AND AS SPECIFIED IN SECTION "JOINT SEALANTS."

ROUTING WIDTH, 1/2" OR SIZE OF EXISTING

ROUTED CRACK PREVIOUSLY SEALED

3/ 4"

EXISTING SLAB

EXISTING CRACK

ROUT CRACK WITH CRACK ROUTER. CLEAN AND

PRIME CAVITY. INSTALL SEALANT TOOLED WITH A

1/16" CONCAVE PROFILE.

TYPICAL ROUT AND SEAL CRACK FOR

TRAFFIC COATING

SCALE: NTS22.01

NOTES:

1. NON-DESTRUCTIVELY LOCATE EMBEDDED ELEMENTS. NOTIFY ENGINEER IF DEPTH OF

ROUTED CRACK INTERFERES WITH EMBEDDED ELEMENTS PRIOR TO ROUTING CRACKS.

2. REMOVE EXISTING JOINT SEALANT IF CRACK HAS BEEN PREVIOUSLY ROUTED.

3. CLEAN ROUTED CAVITY TO REMOVE LATENCIES AND PRIME ROUTED CAVITY.

4. SEALANT SHALL BE TRAFFIC GRADE AND AS SPECIFIED IN SECTION "JOINT SEALANTS."

3/ 4"

EXISTING SLAB

EXISTING CRACK

ROUT CRACK WITH CRACK ROUTER. CLEAN AND

PRIME CAVITY. INSTALL SEALANT TOOLED FLUSH

ROUTING WIDTH, 1/2" OR SIZE OF EXISTING

ROUTED CRACK PREVIOUSLY SEALED

NEW 6" WIDE STRIPE COAT CENTER ON CRACK

NEW TRAFFIC COATING SYSTEM

ABRASIVE SHOT BAST CONCRETE SURFACE TO

ICRI CSP-4 AND APPLY PRIMER

TYPICAL ROUT AND SEAL JOINT

SCALE: NTS22.02

NOTES:

1. NON-DESTRUCTIVELY LOCATE EMBEDDED ELEMENTS. NOTIFY ENGINEER IF DEPTH OF

ROUTED JOINT INTERFERES WITH EMBEDDED ELEMENTS PRIOR TO ROUTING JOINTS.

2. REMOVE EXISTING JOINT SEALANT IF CRACK HAS BEEN PREVIOUSLY ROUTED.

3. CLEAN ROUTED CAVITY TO REMOVE LATENCIES AND PRIME ROUTED CAVITY.

4. SEALANT SHALL BE TRAFFIC GRADE AND AS SPECIFIED IN SECTION "JOINT SEALANTS."

ROUTING WIDTH, 3/4" OR SIZE OF EXISTING

PREVIOUSLY SEALED ROUTED JOINT

3/ 4"

EXISTING SLAB

EXISTING CONTROL JOINT

ROUT JOINT WITH CRACK ROUTER. CLEAN AND PRIME

CAVITY. INSTALL SEALANT TOOLED WITH A 1/16"

CONCAVE PROFILE.

TYPICAL ROUT AND SEAL JOINT FOR

TRAFFIC COATING

SCALE: NTS22.02

NOTES:

1. NON-DESTRUCTIVELY LOCATE EMBEDDED ELEMENTS. NOTIFY ENGINEER IF DEPTH OF

ROUTED JOINT INTERFERES WITH EMBEDDED ELEMENTS PRIOR TO ROUTING JOINTS.

2. REMOVE EXISTING JOINT SEALANT IF CRACK HAS BEEN PREVIOUSLY ROUTED.

3. CLEAN ROUTED CAVITY TO REMOVE LATENCIES AND PRIME ROUTED CAVITY.

4. SEALANT SHALL BE TRAFFIC GRADE AND AS SPECIFIED IN SECTION "JOINT SEALANTS."

3/ 4"

EXISTING SLAB

EXISTING CONTROL JOINT

ROUT JOINT WITH CRACK ROUTER. CLEAN AND PRIME

CAVITY. INSTALL SEALANT TOOLED FLUSH

ROUTING WIDTH, 3/4" OR SIZE OF EXISTING

PREVIOUSLY SEALED ROUTED JOINT

NEW 6" WIDE STRIPE COAT CENTER ON CRACK

NEW TRAFFIC COATING SYSTEM

ABRASIVE SHOT BAST CONCRETE SURFACE TO

ICRI CSP-4 AND APPLY PRIMER

NEW BOND BREAKER

NEW BOND BREAKER

VERTICAL SEALANT AT WALL JOINT

SCALE: NTS22.03

NOTES:

1. REMOVE EXISTING JOINT…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .