FP-03 Forest Service Supplemental Specifications-Bogus Jim signed.pdf

PDF 2 MB Posted

Attached to
BHNF Bogus Jim Road (NFSR 201) Resurfacing
Solicitation number
1267T020Q0024
Issued by

View the file

Other files

File Type Posted
DB Act WD SD202000001 1-3-2020.pdf PDF
1267T020Q0024 0001.pdf PDF
1267T0Q0024 RFQ.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

I-2

Table of Contents

Description Page Section I Project Summary

Title Sheet I-1 Table of Contents I-2 Summarized Statement of Work I-3 to I-4

Section II Plans and Description of Work Table of Contents II-2 Forest Location Map II-3 Project Location Map II-4 Schedule of Items II-5 Construction Signs II-6 to II-7 Typical Surfacing Sections II-8 Turnouts II-9 Description of Work II-10 to II-11 Project Notes II-12

Section III Forest Service Supplemental Specifications Table of Contents III-2 Preface III-3 101 - Terms, Format, and Definitions III-3 102 - Bid, Award, and Execution of Contract III-4 103 - Scope of Work III-6 104 - Control of Work III-6 105 - Control of Material III-7 106 - Acceptance of Work III-7 107 - Legal Relations and Responsibility to the Public III-7 108 - Prosecution and Progress III-9 109 - Measurement and Payment III-9 155 - Schedules for Construction Contracts III-10 156 - Public Traffic III-10 171 - Weeds and Disease Prevention III-13 322 - Minor Aggregate Courses III-15 635 - Temporary Traffic Control III-22 703 - Aggregate III-22

I-3

1. Contract Scope. Bogus Jim Road (NFSR 201) Resurfacing Project is located on the Black

Hills National Forest approximately 10.9 miles northeast of Silver City, South Dakota. Under this project, the Contractor shall be required to load, haul and place an aggregate surface course on 3.77 miles of existing Forest System Road to include turnouts and curve widening segments. The roadway surface course shall be placed to a 4” compacted depth, with a 12’ surface width from STA. 0+00 to 161+70 and a 3% crowned finish. The roadway surface course shall be placed to a 4” compacted depth, with a 14’ surface width from STA. 161+70 to 199+00 and a 3% crowned finish. All turnouts and curve widening segments shall be resurfaced to a 4” compacted depth and to a 4’ surface width. The aggregate material for this project shall be government furnished and obtained from Custer Peak quarry.

OPTION A. Nissen Road (NFSR 202) Resurfacing. The roadway surface course shall be placed to a 4” compacted depth, with a 12’ surface width from STA. 0+00 to 105+60 and a 3% crowned finish. All turnouts and curve widening segments shall be resurfaced to a 4” compacted depth and to a 4’ surface width. The aggregate material for this project shall be government furnished and obtained from Custer Peak quarry.

1.1. The Contractor shall provide an itemized bid based on the Pay Items listed in the attached Schedule of Items.

1.2. The intended contract period is for 60 days upon award. The intent is to begin work on or about July 1, 2020.

1.3. Forest Service Construction and Maintenance Crew will blade and shape the roadbed prior to the award of this contract.

1.4. Contract specifications shall be in compliance with both the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects of the Federal Highway Specifications FP-03 manual and the attached Forest Service Supplemental Specifications (FSSS).

1.5. The Contractor shall keep Bogus Jim Road (NFSR 201) and Nissen Road (NFSR 202) open to the public during the execution of this contract. Bogus Jim Road and Nissen Road serve as the primary access routes to several private inholdings in the area.

2. Contract Pay Items.

2.1. Item 151(01) - Mobilization. This is a lump sum payment item. Equipment mobilization, safety related signage and submittals are incidental to this pay item.

2.2. Item 322(22) – Furnish, haul and placement of aggregate surface material. This pay item includes final blading of aggregate material of the road surface, turnouts, and curve widening segments.

2.2.1. The Contractor shall haul and place aggregate surfacing material for the designated project as indicated in the Description of Work to a 4” compacted depth, with a 12’ and 14’ wide surface sections and a 3% crowned finish.

I-4

2.2.2. Compaction. Compaction Method A is the required means of compaction for this project. Reference FSSS 322, Section 322.05, in Section II of this contract package.

2.2.3. Final acceptance for payment for this item will be based on three primary factors, considered equally: (1) 4” compacted depth (2) 12’ and 14’ wide surface sections and (3) a 3% crowned finish. The Contractor is responsible for periodic quality control of their operation in order to meet these factors whereas the Forest Service is responsible for overall quality assurance.

3. Submittals. The Contractor is required to submit the following items to the Contracting

Officer for review within five business days of contract award. All items listed below are incidental to the contract.

3.1. Temporary Traffic Control Plan. This plan will address how the Contractor will execute gravel haul and placement on an arterial forest system road that has high mixed use by the public. The Contractor is required to keep Bogus Jim Road (NFSR 201), Nissen Road (NFSR 202) and all other adjacent roads used during their operation open for all forest road users. The maximum delay permitted shall not exceed 20 minutes. All signage must meet the most recent edition of the Manual on Uniform Traffic Control Devices (MUTCD) standards for material and reflectivity.

3.2. Hazardous Spill Plan. This plan shall outline how the Contractor would handle a fuel, oil and hydraulic fluid spills on public lands to minimize impacts to the public and adjacent natural resources.

3.3. Schedule of Work. This schedule will outline the Contractor’s plan to complete the work items contained within the contract to aid the Forest Service in timely inspection for quality assurance purposes.

3.4. Quality Control Plan. The Contractor’s quality control plan will address the frequency and methodology of inspection to ensure the in-place aggregate surface course is placed to 4” compacted depth, a 12’ and 14’ wide surface sections and a 3% crowned finish.

II-1

Section II – Plans and Description of Work

II-2

Index to Sheets

Description Sheet Page Index to Sheets II-2 Forest Location Map 100-04 II-3 Project Location Map 100-05 II-4 Schedule of Items 100-06 II-5 Construction Signs 156-01 and 156-02 II-6 to II-7 Typical Surfacing Sections 322-01 II-8 Turnouts 204-05 and 212-05 II-9 Description of Work II-10 to II-11 Project Notes II-12

Schedule of Items II-5

• Measured as in place compacted cubic yards.

Item Description Measure Unit Quantity

Base Item Work

151(01) Mobilization AQ LS 1

322(11) Haul and place aggregate surface course, grading V, compaction method A, Government Furnished Material Bogus Jim Road (NFSR 201)

CQ CCY* 4310

322(11)A Option A:

Haul and place aggregate surface course, grading V, compaction method A, Government Furnished Material Nissen Road (NFSR 202)

CQ CCY* 2215

DESCRIPTION OF WORK II-10

ST

A

SP

EC

FE

A

TU

R

E

U N

IT

S

(fe et

U N

IT

S

(m ile

U N

IT

S

(C C

Y)

DESCRIPTION OF WORK

BOP = Beginning of Project CMP = Corrugated Metal Pipe CY = Cubic Yards EOP = End of Project S/B = Sediment Basin TO = Turnout R/D = Rolling Dip CW = Curve Widening W/D = Water Deflector CCY = Compacted Cubic Yards G/S =Grade Sag LWG = Loose Wire Gate TTA = Truck Turnaround LT = Left RT = Right CG = Cattleguard CL = Centerline INT = Intersection ATP = Area to Protect

0+00 BOP Intersection with CTY 208 Merritt Estes Rd.

322(11) 4310

Begin haul and placement of Government furnished aggregate course placed to a 4” compacted depth, 12’ surface width and a 3% crowned finish to STA.161+70.

Use Compaction Method A.

Aggregate haul and placement includes: existing turnouts, curve widening and adjacent open road intersections.

52+35 Bridge Protect route feature. No aggregate shall be placed on bridge.

79+40 INT 2012 Trail, right.

88+90 CG

Protect route feature. Do not permit aggregate material to fill in the cattleguard basin during placement operations.

99+50 INT NFSR 679.1 Duran Rd, left.

161+70 INT NFSR 202 Nissen Rd, right

Continue haul and placement of Government furnished aggregate course placed to a 4” compacted depth, 14’ surface width and a 3% crowned finish to STA.199+00.

199+00 CG

Protect route feature. Do not permit aggregate material to fill in the cattleguard basin during placement operations.

EOP End aggregate haul and placement. Begin county road segment.

DESCRIPTION OF WORK II-11

ST

A

SP

EC

FE

A

TU

R

E

U N

IT

S

(fe et

U N

IT

S

(m ile

U N

IT

S

(C

Y)

DESCRIPTION OF WORK

BOP = Beginning of Project CMP = Corrugated Metal Pipe CY = Cubic Yards EOP = End of Project S/B = Sediment Basin TO = Turnout R/D = Rolling Dip CW = Curve Widening W/D = Water Deflector CCY = Compacted Cubic Yards G/S =Grade Sag LWG = Loose Wire Gate TTA = Truck Turnaround LT = Left RT = Right CG = Cattleguard CL = Centerline INT = Intersection ATP = Area to Protect

0+00 BOP Intersection with NFSR 201 Bogus Jim Road.

322(11)A 2215

Begin haul and placement of Government furnished aggregate course placed to a 4” compacted depth, 12’ surface width and a 3% crowned finish to STA.105+60.

105+60 EOP End aggregate haul and placement.

Bogus Jim Road (NFSR 201) Resurfacing

PROJECT NOTES II-12

1 Contract work shall conform to the specifications in the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03, and Forest Service Supplemental Specifications. The Standard Specifications may be obtained on the Internet at https://flh.fhwa.dot.gov/resources/specs/fp-03 The required Forest Service Supplemental Specifications are contained within this contract.

2 The Contractor's Temporary Traffic Control Plan shall include the appropriate traffic control and warning signs for all active work areas defined in the Description of Work to include the intersection to Custer Peak Pit. All traffic control and warning signs shall comply with the current Manual on Uniform Traffic Control Devices.

3 During normal operating hours, the Contractor may leave unattended windrows of aggregate along the edge of the travelway, prior to spreading and compacting, if the windrow is clearly marked. At a minimum the windrow shall be marked at both ends and at 50’ intervals, with the appropriate traffic safety warning or marking devices that comply with the current Manual on Uniform Traffic Control Devices. However, at no time during aggregate haul and placement operations, shall the Contractor be permitted to leave windrowed aggregate material staged within the travelway of any National Forest System Roads open to public travel overnight.

4 The Contractor is responsible to repair road damage that occurs as a result of the aggregate haul operation on any Forest System Roads utilized during the course of this contract.

5 Utility companies shall be contacted prior to commencement of resurfacing activities. In South Dakota, the Contractor shall contact South Dakota One Call at 1-800-781-7474. All buried utilities shall be marked, avoided and protected during resurfacing activities. This activity is incidental to the Mobilization Pay Item.

6 The contract quantity for roadway aggregate includes a factor for the application of aggregate for intersections with other aggregate surfaced roads and curve widening areas where a location and quantity is not specifically addressed in the Description of Work.

7 The Contractor is required to keep Bogus Jim Road (NFSR 201) and Nissen Road (NFSR 202) open for all forest users. The maximum delay permitted is not to exceed 20 minutes. The Contractor shall not restrict the travel of other forest users or contractors beyond the times outlined in the contract under FSSS 156.05.

8 The Forest Service Construction and Maintenance Crew will recondition the roadbed prior to the Contractor’s aggregate hauling, placing and spreading operation.

9 Gravel inadvertently placed in the cattleguards by the Contractor, will be removed prior to final acceptance.

https://flh.fhwa.dot.gov/resources/specs/fp-03

FP-03 Forest Service Supplemental Specifications III-1

Section III – Forest Service Supplemental Specifications

FP-03 Forest Service Supplemental Specifications III-2

Table of Contents

Table of Contents

Preface

101 - Terms, Format, and Definitions

102 - Bid, Award, and Execution of Contract

103 - Scope of Work

104 - Control of Work

105 - Control of Material

106 - Acceptance of Work

107 - Legal Relations and Responsibility to the Public

108 - Prosecution and Progress

109 - Measurement and Payment

155 - Schedules for Construction Contracts

156 - Public Traffic

171 - Weed and Disease Prevention

322 - Minor Aggregate Courses

635 - Temporary Traffic Control

FP-03 Forest Service Supplemental Specifications III-3

Preface Preface_wo_03_15_2004_m

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.

101 - Terms, Format, and Definitions 101.00_nat_us_07_25_2005

101.01_nat_us_01_22_2009

101.01 Meaning of Terms

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_nat_us_06_16_2006

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau

Add the following to (b) SI symbols:

mp Milepost ppm Part Per Million http://www.nist.gov/

FP-03 Forest Service Supplemental Specifications III-4

101.04_nat_us_03_29_2007

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge--No definition.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.

Culvert--No definition.

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following:

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges.

Under these FP specifications this term is replaced by the term “Contract Quantities”.

Forest Service--The United States of America, acting through the Forest Service, U.S.

Department of Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

FP-03 Forest Service Supplemental Specifications III-5

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

FP-03 Forest Service Supplemental Specifications III-6

102 - Bid, Award, and Execution of Contract 102.00_nat_us_02_16_2005

102 Bid, Award, and Execution of Contract

Delete Section 102 in its entirety.

103 - Scope of Work 103.00_nat_us_02_16_2005

Deletions

Delete all but subsection 103.01 Intent of Contract.

104 - Control of Work 104.00_nat_us_06_16_2006

Deletions

Delete Sections 104.01, 104.02, and 104.04.

104.06_nat_us_02_17_2005

Add the following subsection:

104.06 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

FP-03 Forest Service Supplemental Specifications III-7

105 - Control of Material 105.02_nat_us_01_18_2007

105.02 Material Sources.

105.02(a) Government-provided sources.

Add the following:

Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.

105.05_nat_us_05_12_2004

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

106 - Acceptance of Work 106.07_nat_us_05_11_2004

106.07 Delete

Delete subsection 106.07.

107 - Legal Relations and Responsibility to the Public 107.05_nat_us_05_11_2004

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.06_nat_us_06_16_2006

FP-03 Forest Service Supplemental Specifications III-8

107.06 Contractor’s Responsibility for Work.

Delete the following from the first paragraph.

“except as provided in Subsection 106.07”.

107.09_nat_us_06_16_2006

107.09 Legal Relationship of the Parties.

Delete the entire subsection.

107.10_nat_us_06_16_2006

107.10 Environmental Protection.

Add the following:

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

• Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

• Whether amount spilled is EPA or state reportable, and if so whether it was reported, to whom and where.

• Exact time and location of spill including a description of the area involved.

• Containment procedures.

• Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

• Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.

FP-03 Forest Service Supplemental Specifications III-9

108 - Prosecution and Progress 108.00_nat_us_02_16_2005

108 Delete.

Delete Section 108 in its entirety.

109 - Measurement and Payment 109.00_nat_us_02_17_2005

109 Deletions

Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

109.02_nat_us_06_16_2006

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Add the following:

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

Change the following:

“(b) Cubic yard” to “(c) Cubic yard”.

Add the following definition:

(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

FP-03 Forest Service Supplemental Specifications III-10

155 - Schedules for Construction Contracts 155.00_nat_us_05_11_2004

155 Delete.

Delete Section 155 in its entirety.

156 - Public Traffic 156.00_nat_us_04_17_2007

Delete Section 156 in its entirety and replace with the following:

Description

156.01 This work consists of controlling and protecting public traffic adjacent to and within the project.

Material

156.02 Conform to the MUTCD and the following Sections and Subsections:

Construction sign panels 633

Retro-reflective sheeting 718.01

Temporary concrete barrier 618

Temporary plastic fence 710.11

Temporary traffic control devices 718.22

FP-03 Forest Service Supplemental Specifications III-11

156.03 General. Unless otherwise provided for in Table 156-1, keep existing roads open to all traffic during road improvement work, and maintain them in a condition that will adequately accommodate traffic. Delays may not exceed _20__ minutes at any one time followed by an open period of no less than _30_ minutes.

Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan has been approved. Post construction signs and traffic control devices in conformance with MUTCD. All required signs will be in place and approved prior to beginning work on project.

If the Contractor agrees in writing to allow public traffic to use a new road being constructed prior to completion, it will be considered an existing road for traffic control purposes.

156.04 Temporary Traffic Control. Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the MUTCD. Install and maintain traffic control devices as follows:

(a) Furnish and install traffic control devices before the start of construction operations.

(b) All detours outside of clearing limits will be approved in writing by the Contracting Officer as part of the traffic control plan.

(c) Install only those traffic control devices needed for each stage or phase.

(d) Relocate temporary traffic control devices as necessary.

(e) Remove devices that no longer apply to the existing conditions.

(f) Immediately replace any device that is lost, stolen, destroyed, or inoperative.

(g) Keep temporary traffic control devices clean.

(h) Remove all temporary traffic control devices upon contract completion or when approved.

(i) When required, use flaggers certified by the American Traffic Safety Services

Association, the National Safety Council, the International Municipal Signal Association, a state agency, or other acceptable organization. Perform the work described under MUTCD Part 6. Use type III, VII, VIII, or IX retroreflective sheeting on flagger paddles. Do not use flags. Flaggers must wear high visibility safety apparel as required by MUTCD 6E.02.

FP-03 Forest Service Supplemental Specifications III-12

156.05 Temporary Closures. Road segments may be closed as shown in Table 156-

1. The maximum consecutive days of closure shall be followed by a minimum number of consecutive days open to traffic as shown. Maintain traffic control devices during closure period(s). Appropriate barricades and signs will be erected and maintained as shown in the traffic control plan or as otherwise designated.

Prior to closing roads during construction, give written notice to the Contracting Officer at least 10 days in advance.

Table 156-1

Temporary Road Closures

Road Number

From Terminus

To Terminus

Maximum Consecutive

Days of Closure

Minimum Consecutive Days Open

N/A

156.06 Acceptance. Public traffic work will be evaluated under Subsection 106.02.

Measurement and Payment

156.07 Do not measure Public Traffic for payment. Compensation is made as an indirect payment.

FP-03 Forest Service Supplemental Specifications III-13

171 - Weed and Disease Prevention 171.00_nat_us_03_30_2005

171.01 This work consists of washing and treating construction equipment to remove seeds, plants, and plant fragments from the equipment before the equipment is used on National Forest System lands.

171.02 Conform to the following Subsection:

Water 725.01

Construction Requirements

171.03 General . Notify the CO in writing at least 15 days before moving any construction equipment onto National Forest System lands. Construction equipment does not include cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas outside of National Forest System lands.

Perform all work at a location designated on the plans or other locations approved in writing. Provide the CO with an opportunity to monitor the washing and inspection.

171.04 Equipment. Use a high pressure washing system.

FP-03 Forest Service Supplemental Specifications III-14

For work on National Forest System lands, use a washing system that traps all wash water and either stores it for removal from National Forest System lands or recycles the water for continued use. If the equipment recycles the water, provide adequate filters for seed removal. Dispose of the filter material and removed seeds in an approved manner.

Do not mix soaps, detergents, or other chemicals with the wash water.

For work at a commercial washing facility, use an approved facility.

171.05 Washing. Wash the sides, tops, and undercarriages of all construction equipment. Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment.

171.06 Inspection. Inspect the washed construction equipment, including the undercarriage, to ensure that the washing removed the dirt, debris, and seeds from the construction equipment. Rewash the construction equipment as necessary or as directed.

171.07 Acceptance. Weed prevention will be evaluated under Subsection 106.02.

Measurement

171.08 Do not measure weed prevention for payment.

Payment

171.09 Include all costs associated with the Section 171-Weed Prevention in the unit price for Section 151-Mobilization.

FP-03 Forest Service Supplemental Specifications III-15

322 - Minor Aggregate Courses 322.00_nat_us_10_24_2007

322.01 This work consists of constructing one or more courses of aggregate on a prepared surface. Work includes producing aggregate by grid rolling, screening, or crushing methods, or placing pit-run or Government-furnished aggregate.

Surface aggregate grading is designated as shown in Table 703-3.

Subbase and base aggregate grading is designated as shown in Table 703-2.

Screened aggregate grading is designated as shown in Table 703-16.

322.02 Conform to the following Subsections:

Aggregate 703.05 Water 725.01

Construction Requirements

322.03 General. Prepare the surface on which the aggregate course is placed according to Section 204 or 303 as applicable.

Request approval of the roadbed in writing before placing aggregate.

Develop, haul, and apply water in accordance to Section 170.

Submit target values within the gradation ranges shown in Table 703-2 or 703-3 for the required grading. After reviewing the proposed target values the CO will determine the final values for the gradation and notify the Contractor in writing.

No quality requirements or gradation other than maximum size will be required for pit run and grid-rolled material. For grid rolling, use all suitable material that can be reduced to maximum size.

FP-03 Forest Service Supplemental Specifications III-16

After processing on the road, remove all oversize material from the road and dispose of it as directed by the CO.

If the aggregate is produced and stockpiled before placement, handle and stockpiled according to Section 320. Establish stockpile sites at approved locations.

322.04 Mixing and Spreading. Mix the aggregate and adjust the moisture content to obtain a uniform mixture with a moisture content suitable for the specified compaction method. Spread and shape the mixture on the prepared surface in a uniform layer with no segregation of size, and to a loose depth that will provide the required compacted thickness.

Do not place in layers exceeding 6 inches in compacted thickness for aggregate base and surface courses or twice the maximum particle size for screened aggregate. When more than one layer is necessary, compact each layer according to Subsection 322.05 before placing the next layer. Route hauling and leveling equipment uniformly over the full width.

When placing aggregate over geotextile, place aggregate in a single lift to the full depth specified.

322.05 Compacting. Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.

Compact the aggregate using one of the following methods as specified:

Compaction A. Operating spreading and hauling equipment over the full width of the travelway.

Compaction B. Operate rollers and compact as specified in Subsection 204.11(a)(1).

Compaction C. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in Subsection 204.11(a)(1).

Compaction D. Compact to a density of at least 95 percent of the maximum density, as determined by AASHTO T 99, method C or D.

Compaction E. Compact to a density of at least 96 percent of the maximum density, as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).

Compaction F. Compact to a density of at least 95 per-cent of the maximum density, as determined by AASHTO T 180, method C or D.

FP-03 Forest Service Supplemental Specifications III-17

Compaction G. Compact to a density of at least 100 percent of the maximum density as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).

For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.

322.06 Construction Tolerance. If grade finishing stakes are required, finish the surface to within ±0.10 feet from staked line and grade elevation.

If grade finishing stakes are not required, shape the surface to the required template and check the surface with a 10-foot straightedge. Defective areas are surface deviations in excess of 1/2 inch in 10 feet between any two contacts of the straightedge with the surface.

Correct all defective areas by loosening the material, adding or removing material, reshaping, and compacting.

Ensure that the compacted thickness is not consistently above or below the specified thickness. The maximum variation from the compacted specified thickness is ½ inch.

Ensure that the compacted width is not consistently above the specified width. The maximum variation from the specified width will not exceed +12 inches at any point.

322.07 Maintenance. Maintain the aggregate course to the correct line, grade, and cross-section by blading, watering, rolling, or any combination thereof until placement of the next course. Correct all defects according to Subsection 322.06.

322.08 Acceptance. See Table 322-1 or Table 322-2 as applicable, for sampling and testing requirements.

Aggregate gradation and surface course plasticity index will be evaluated under Subsection

106.04. If the aggregate is obtained from a Government stockpile then the above characteristics will be evaluated under Subsection 106.02. Other aggregate quality properties will be evaluated under Subsections 106.02 and 106.04. Placement of aggregate courses will be evaluated under Subsections 106.02 and 106.04.

The allowable upper and lower aggregate gradation limits are the Target Value plus or minus the allowable deviations shown in Tables 703-2 and 703-3.

FP-03 Forest Service Supplemental Specifications III-18

The allowable upper and lower Plasticity index limits for surface courses are stated in 703.05(b).

Preparation of the surface on which the aggregate course is placed will be evaluated under Section 204 or 303 as applicable.

Measurement

322.09 Measure the Section 322 items listed in the bid schedule according to Subsection

109.02 and the following as applicable.

Measure square yard width horizontally to include the top of aggregate width including designed widening. Measure the square yard length horizontally along the centerline of the roadway.

If the measurement for aggregate is by cubic yard using contract quantities then measure aggregate by the cubic yard in-place once compacted, otherwise measurement for aggregate by the cubic yard is measured by the cubic yard in the hauling vehicle.

Measure thickness perpendicular to the grade of the travelway.

Measure width perpendicular to the centerline.

Payment

322.10 The accepted quantities will be paid at the contract price per unit of measurement for the Section 322 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

FP-03 Forest Service Supplemental Specifications III-19

Ta bl e

2-

Sa m pl in g an d Te st in g R eq ui re m en ts

R ep or tin g Ti m e

Be fo re u si ng in w or k h ou rs

Sp lit

Sa m pl e

Ye s, w he n re qu es te d

Ye s

Po in t o f

Sa m pl in g

So ur ce o f m at er ia l

Fr om dr ow o r ro ad be d af te r pr oc es si ng o r fro ap pr ov ed cr us he r

Sa m pl in g Fr eq ue nc y pe r t yp e so ur ce o f m at er ia pe r d ay

Te st

M et ho ds ec ifi ca tio ns

AA

SH

TO

T

AA

SH

TO

T

TO

T

AS

TM

D

AA

SH

TO

T at eg or y ha ra ct er is tic

LA

a br as io n

(c oa e)

So di um s ul fa te so un dn es s lo ss

(c oa rs e fin

D ab ilit y in de x

(c oa rs e fin

Fr ac tu re d fa ce s

Sa m pl e

Ty pe o f

A cc ep ta nc e

(S ub se ct io n)

M ea su re d an d te fo r c on fo rm an ce

(1

.0

5) su re d an d te on fo rm

.0

4) er ia l o r P ro du ct

Ag gr eg at e so ur ce q ua lit y

3.

Su bb as e, B as e, a nd rfa ce c ou es

FP-03 Forest Service Supplemental Specifications III-20 e

2-

(c on tin ue d) pl in g an d Te st in g R eq ui re m or tin g Ti m e

Be fo re u ng or k

Be re pl ac in g ne xt la ye r

(1

M in im um o f 5 p oi nt s pe r p ro ct or pl e

Ye s, w he n re qu es te

Po t o f

Sa m pl in g

So ur ce o f m at er ia

In -p la pl in g Fr eq ue nc y pe r t yp e an d so ur ce o f m at er ia pe r da y

Te st

M et ifi ca tio

TO

T

(1

R -1

M ar sh al l

AA

SH

TO

T

(1

R -1

M ar sh al l

AA

SH

TO

T o th er a pp ro ve d pr oc ed es eg or y ra ct er is tic oi st ur e-de ity et ho

D st ur e-de ho

E st ur e-de ho d F

M oi st ur e-de ho

G

In -p la ce d en ty oi st ur e co nt en t

Ty pe o f

A cc ep ta nc e

(S ub se ct su re d an d te on fo rm

.0

4) er ia l o r P ro bb as e, B as e, a nd S ur fa

FP-03 Forest Service Supplemental Specifications III-21 e

2-

Sa m pl in g an d Te st in g R eq ui re m or tin g Ti m e h ou pl e

Ye s

Po in t o f

Sa m pl in g

Fr om w in dr ow ro ad be d af te r pr oc es si ng o r fro m a pp ro ve d cr us he r sa m pl in g de vi pl in g Fr eq ue nc y pe r da y

Te ifi ca tio n s

AA

SH

TO

T eg y — ra ct er is ti c

Sa m pl e

Ty pe o f

A cc ep ta nc e

(S ub se ct su re d an d te on fo rm

.0

M at er ia l o r P ro

Sc re en ed

A gg re ga te

FP-03 Forest Service Supplemental Specifications III-22

635 - Temporary Traffic Control 635.03_nat_us_05_13_2004

635.03 General.

Add the following:

Install temporary traffic control signs to temporary posts or approved temporary sign mounts.

FP-03 Forest Service Supplemental Specifications-Bogus Jim signed
FP-03 Forest Service Supplemental Specifications-Bogus Jim
ADP2A02.tmp
Table of Contents
Preface
101 - Terms, Format, and Definitions
101.01 Meaning of Terms
101.03 Abbreviations.
101.04 Definitions.
102 - Bid, Award, and Execution of Contract
102 Bid, Award, and Execution of Contract
103 - Scope of Work
Deletions
104 - Control of Work
Deletions
104.06 Use of Roads by Contractor
105 - Control of Material
105.02 Material Sources.
105.02(a) Government-provided sources.
105.05 Use of Material Found in the Work.
106 - Acceptance of Work
106.07 Delete
107 - Legal Relations and Responsibility to the Public
107.05 Responsibility for Damage Claims.
107.06 Contractor’s Responsibility for Work.
107.09 Legal Relationship of the Parties.
107.10 Environmental Protection.
108 - Prosecution and Progress
108 Delete.
109 - Measurement and Payment
109 Deletions
109.02 Measurement Terms and Definitions.
155 - Schedules for Construction Contracts
155 Delete.
156 - Public Traffic
171 - Weed and Disease Prevention
322 - Minor Aggregate Courses
635 - Temporary Traffic Control
635.03 General.

File details come from the government source that posted it. Updated .