12639520Q0203 Carrizo Cane Topping Solicitation AMEND 0001 CHANGE PAGES.pdf
PDF 899 KB Posted
- Attached to
- Carrizo Cane Topping
- Solicitation number
- 12639520Q0203
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 Maverick Cty WD 2015-5301.pdf | ||
| ATTACHMENT 1 - 13 AREAS.zip | ZIP file | |
| Attachment 3 Val Verde - Kinny WD 2015-5305.pdf | ||
| 12639520Q0203 Carrizo Cane.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12639520Q0203 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
MINNEAPOLIS MN 55403
APHIS-MRPBS-ASD-6395
100 N 6TH STREET
Butler Square, 5th Floor ASD Procurement Branch
USDA APHIS MRPBS
APHIS-MN-126395
MINNEAPOLIS MN 55401
SUITE410
250 MARQUETTE AVE
USDA APHIS
06/16/20200001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/16/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Tax ID Number: Not Available
DUNS Number: Not Available
The purpose of this amendment is to add clarifications to Section 1.6 (p.5) and Section 2.0
(p.8). See attached change pages.
All other terms and conditions remain the same.
Contact Leah Schultz at leah.h.schultz@usda.gov with any questions.
Period of Performance: 06/23/2020 to 07/16/2020
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
LEAH H. SCHULTZ
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
TEL: EMAIL: 612-336-3625 leah.h.schultz@usda.gov
Solicitation # 12639520Q0203 Amendment 0001 6/23/20
6. Cane must be topped 15 feet from each side and including the road/trail identified in each of the
13 areas in Attachment 1.
5.7. On the occasion the contractor seeks approval from the USDA liaison to leave any equipment on-site overnight, the contractor must take appropriate precautions to ensure that:
Parked equipment does not impede traffic access along the river trail;
Parked equipment is not damaging any endangered species of plant or wildlife;
Parked equipment have sufficient quantity of drip pans to prevent contamination of river trail;
The Government recommends that all equipment be removed from sites daily to prevent damage or loss to equipment. The Government is not responsible for any damaged or stolen equipment or belongings that may be left overnight at a work site.
6.8. Trash generated by cane cutting operations and work crews shall be removed at the end of each work day;
7.9. Only authorized personnel are allow access to the work sites (i.e, no visitors, no pets, etc).
8.10. Carrizo Cane shall be accessed from designated USDA and CBP roadways and any approved excursion off the road should use the same path for both ingress and egress in order to minimize any negative environmental impacts.
9.11. The Carrizo Cane should be cleanly cut at the 3 foot (1 meter) height to stimulate and enhance the effect of the predatory insect species and encourage branching which will minimize the height for regrowth and give greater access to the control insects. The tops, which still contain insect larvae, are to be left in place to encourage newly developed insects to further attack and degrade the carrizo cane stands.
10.12. The contractor will provide proof that background checks have been successfully completed and provided to USDA liaison before employees work on identified sites. This includes all employees that may join the effort during the execution of this requirement all new employee proof of background lists are provided to the USDA liaison.
11.13. Provide qualified personnel to transport and operate the equipment on site.
12.14. Obtain proper licenses and follow all other local, state and federal laws and regulations.
13.15. Must follow all equipment manual operation instructions including all safety protocol.
14.16. Provide any utilities needed to power the equipment listed and provide for any restrooms or other break areas the contractor may require.
15.17. The contractor shall arrive on-time, and at the designated site fully prepared for an 8-hour work day.
a. If work is taking place during hunting season, alternate work schedules may need to be coordinated through landowner by USDA Liaison and approved by contractor.
16.18. Repair any damage done to property while working on-site.
17.19. Coordinate with USDA liaison on whether equipment needs to be disinfected before moving to a new property.
Solicitation # 12639520Q0203 Amendment 0001 6/23/20
1.9 Period of Performance and Contract Instrument
The period of performance for this requirement is from date of award for 1 year. The government intends to issue one or more IDIQ contracts for this requirement based on the quotes received. Thirteen task orders will be issued for the initial 13 areas identified to be cut. If during the performance period, additional areas are identified, they will be competed amongst the contract holders.
1.10 Contractor Quality Control
The Contractor shall develop and maintain an effective pro-active quality control program to ensure services are performed in accordance with this SOW. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor shall ensure management oversight and supervision, training to employees (including subcontractor employees), error-free work, early problem detection and corrective actions, increased productivity and efficiency, and superior public relations. The Contractor shall provide to the USDA designated COR a report of quality control field observations as mutually agreed by both parties. This report should include any problems identified and corrective actions taken. It is expected that 100% of Carrizo cane identified will be cut at the appropriate level as identified in this SOW. The contractor will only be compensated for work successfully completed.
1.11 Government Quality Surveillance
According to the Inspection of Services clause, FAR 52.246-4 INSPECTION OF SERVICES - FIXED PRICE (Aug 1996), located at Section 5 of this solicitation, the USDA will evaluate the contractors performance under any contract awarded under this solicitation for cane cutting. USDA personnel will record surveillance observations and provide them to the contractor for review. Then, the contractor will be expected to evaluate the current QC plan and corrective actions taken as suggested by the Government.
2.0 PRICE
CTEFP has identified 13 areas along the Rio Grande Valley that require can cutting. Please see ATTACHMENT 1 with 13 KMZ files for a total of 83 miles along with instructions for access. Based on these images, offerors MUST submit a fixed price quote on at least 3 of the 13 areas. It is not necessary to provide a quote for all 13 areas to be considered responsive. The firm fixed price quote must be listed in the appropriate line below and be inclusive of all costs related to that particular area including, but not limited to, transportation, labor, material, facilities/utilities required, security, indirect costs, etc. Again, the cane must be topped 15 feet from each side and including the road/trail identified in each of the 13 areas in Attachment 1.
ATTACHMENT 1\Google Earth Pro Instructions for Using KMZ files.docx
Maverick County – Attachment 2 Wage Determination 2015-5301 Rev. 14 applies to the following areas
AREA 1: Chandler Cane Trails $__________
AREA 2: Stone North Cane Trail $___________
AREA 3: City Vega South Cane Trail $_________
AREA 4: Stone Sapos Cane Trails $__________
AREA 5: Rosita Cinco Cane Trails $ ___________ file:///C:/Users/jpicanso/AppData/Local/Microsoft/Windows/INetCache/Content.Outlook/NFFD54PE/ATTACHMENT%201/Google%20Earth%20Pro%20Instructions%20for%20Using%20KMZ%20files.docx
| 12639520Q0203 AMEND P0001 |
| 20Q0203 Carrizo Cane Topping Solicitation AMEND P0001 5 |
| 20Q0203 Carrizo Cane Topping Solicitation AMEND P0001 8 |
File details come from the government source that posted it. Updated .