Waterline_site_visit_QA.docx

DOCX document 12 KB Posted

Attached to
Engineering and Construction of Waterline Extension on Monongahela NF
Solicitation number
1256A119R0002
Issued by

About this file

site visit Q&A

View the file

Other files

File Type Posted
SF-30_Amendment_2.rtf RTF text file
Waterline_Site_Visit_Attendance_Sheet.pdf PDF
1256A119R0002_RFP_Waterline_Amendment_1.pdf PDF
SF-30_Amendment_1.rtf RTF text file
Waterline_Scope_of_Work.pdf PDF
1256A119R0002_RFP_Waterline.pdf PDF
Core_Borings.pdf PDF
SF24-Bid_Bond.pdf PDF
Location_Map.pdf PDF
Wage_Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Stuart Park Waterline Pre-bid Clarifications 08/19/2019 @ 0900

Question: Are there any fire hydrants in this portion of waterline?

Answer: Not specified by the Forest Service, however the waterline shall be built according to state specifications.

Question: What pressure will be at the end of Midland PSD’s line?

Answer: After contacting Midland PSD, they are not sure of the pressure of the line since the line has not been installed. The pressure will not be known until the line is put in service.

Question: Is Midland placing a valve at the end of the waterline?

Answer: After contacting Midland PSD, they notified us that a valve was not planned at the end of the line because their waterline project stops there.

Question: Who will conduct the bat studies required for clearing trees?

Answer: The Forest Service will conduct these studies.