Waterline_site_visit_QA.docx
DOCX document 12 KB Posted
- Solicitation number
- 1256A119R0002
About this file
site visit Q&A
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF-30_Amendment_2.rtf | RTF text file | |
| Waterline_Site_Visit_Attendance_Sheet.pdf | ||
| 1256A119R0002_RFP_Waterline_Amendment_1.pdf | ||
| SF-30_Amendment_1.rtf | RTF text file | |
| Waterline_Scope_of_Work.pdf | ||
| 1256A119R0002_RFP_Waterline.pdf | ||
| Core_Borings.pdf | ||
| SF24-Bid_Bond.pdf | ||
| Location_Map.pdf | ||
| Wage_Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Stuart Park Waterline Pre-bid Clarifications 08/19/2019 @ 0900
Question: Are there any fire hydrants in this portion of waterline?
Answer: Not specified by the Forest Service, however the waterline shall be built according to state specifications.
Question: What pressure will be at the end of Midland PSD’s line?
Answer: After contacting Midland PSD, they are not sure of the pressure of the line since the line has not been installed. The pressure will not be known until the line is put in service.
Question: Is Midland placing a valve at the end of the waterline?
Answer: After contacting Midland PSD, they notified us that a valve was not planned at the end of the line because their waterline project stops there.
Question: Who will conduct the bat studies required for clearing trees?
Answer: The Forest Service will conduct these studies.