Cadastral_Exhibit 1-14.pdf

PDF 9 MB Posted

Attached to
Huron-Manistee National Forest Cadastral Survey IDIQ
Solicitation number
12569R20R0002
Issued by

View the file

Other files

File Type Posted
QA 2.pdf PDF
SF 30 Amend 002.pdf PDF
Q&A.pdf PDF
SF 30 Amend 001.pdf PDF
Solictation_HM Cadastral.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12569R20R0002 Huron-Manistee National Forests Cadastral Survey A&E IDIQ

Exhibit 1 – Statement of Work

HURON – MANISTEE NATIONAL FORESTS CADASTRAL SURVEY:

END-RESULT SPECIFICATIONS

TABLE OF CONTENTS

3000 SCOPE OF CONTRACT …………………………………………………… 2

3100 PROJECT DESCRIPTION AND LOCATION …………………………….. 2

3122 SURVEY METHODS AND PROCEDURES ……………………………… 3

3122.1 Survey Standards ………………………………………………

3122.2 Determination of Bearing …………………………………………. 3

3122.3 Use of Global Navigation Satellite Systems (GNSS) …………….. 3

3122.4 Records Research ………………………………………………… 4

3122.5 Adjoiner Notification …………………………………………….. 4

3122.6 Conflicts and Encroachments …………………………………….. 5

3122.7 Field Notes and Point Numbering ………………………………... 5

3122.8 Clearing for Control Survey ……………………………………… 6

3125 CONTROL DIAGRAM ……………………………………………………. 6

3130 CORNER MAINTENANCE AND ACCESSORIES ……………………… 8

3135 CORNER MONUMENTATION AND ACCESSORIES …………………. 8

3136 Monumentation …………………………………………………….. 8

3136.1 Monument Stamping ……………………………………………... 9

3136.2 Signing ……………………………………………………………. 9

3137 Bearing Trees and Accessories …………………………………….. 9 3138 Recordation of Corner Certificates ………………………………… 10

3140 PROPERTY LINE MAINTENANCE AND REPOSTING ……………….. 11

3141 Property Line Maintenance ……………………………………… 3142 Property Line Reposting …………………………………………… 11

3145 PROPERTY LINE LOCATION AND POSTING ………………………… 11

3146 Locating the Property Line ………………………………………… 11 3147 Posting the Property Line ………………………………………….. 12

3147.1 Clearing Property Line …………………………………………... 12

3147.2 Boundary Sign Placement ……………………………………….. 12

3147.3 Blazing and Painting Property Line ……………………………… 13

3147.4 Visually Sensitive Areas …………………………………………. 13

3150 CERTIFICATE OF SURVEY ……………………………………………... 13

3151 Conflicts and Encroachments ………………………………………. 14 3152 Filing or Recording of Certificates and LCRC Forms ……………... 15

3155 TOPOGRAPHIC MAP …………………………………………………….. 15

3160 SUMMARY OF SURVEY SUBMITTALS ……………………………….. 16

3170 PERFORMANCE OF SERVICES ………………………………………… 17

3180 SELF INSPECTION AND QUALITY CONTROL PLAN ……………….. 18

3190 DEFINITIONS …………………………………………………………….. 19

HURON – MANISTEE NATIONAL FORESTS CADASTRAL SURVEY:

END-RESULT SPECIFICATIONS

3000 SCOPE OF CONTRACT

The intent of this contract is to procure surveying services on an “as needed” basis for a period of up to five years from date of initial award.

3100 PROJECT DESCRIPTION AND LOCATION

All work performed under this contract shall be under the direct supervision of a Professional Surveyor licensed in Michigan. All surveys shall comply with applicable state laws and regulations, as well as applicable portions of the appropriate GLO/BLM Manual of Surveying Instructions.

The work to be performed under this contract involves retracement surveys of the Public Land Survey System (PLSS). The surveys will be performed between recovered and/or accepted controlling corner positions to reestablish lost or obliterated General Land Office (GLO) corners and to establish section subdivisional corners designated by the Contracting Officer’s Representative (COR). Government property boundaries will be designated for posting to Forest Service standards. A Certificate of Survey may be required to be prepared for recordation. Topographic surveys may be requested either in conjunction with boundary surveys or as a stand alone item.

The Huron-Manistee National Forests project zones are located on the project vicinity map (Exhibit 2). Actual work locations and services to be performed have not been determined at this time. These will be specified by delivery/task order(s), issued when the Government determines its specific surveying needs.

The following specifications are specific requirements of the work performed under this contract in addition to (or as a clarification of) the professional services listed above.

3122 SURVEY METHODS AND PROCEDURES

The Contractor shall select the methods and instruments to be used for field data collection and boundary location. Methods such as remote sensing, traverse, and Global Navigation Satellite Systems (GNSS) may be used. The system selected shall meet the accuracy standards prescribed by the State of Michigan. Where state standards are less restrictive than the specifications contained herein, the specifications contained herein shall apply.

All work shall be performed in a safe manner and in accordance with OSHA regulation. Refer to Exhibit 3, the Land Surveying Job Hazard Analysis (JHA), for examples of work hazards and abatement actions that may be taken to prevent accidents. Note that federal law requires at least a Class 2 high visibility safety vest be worn by workers within the right-of-way of federally funded highways. For the scope of this contract safety vests are required to be worn for any work performed along county maintained roadways. The Contracting Officer may, in writing, require the Contractor to remove from the work any employee found to be working in an unsafe manner.

3122.1 Survey Standards

The position of each corner and/or piece of evidence (BT stumps, topo calls, etc.)

reestablished, established or found must be determined as part of a closed traverse loop, an acceptable radial tie, or a point positioning procedure designed to meet the standards prescribed by the State of Michigan and/or the specifications contained herein. Proposed procedure for performing radial ties shall be included in the Contractor’s Quality Control Plan and submitted to the COR at the post award conference. The precision of each traverse loop shall be demonstrated in the field notes and closure report required in Section 3160. An appropriate adjustment is required to be performed on all traverse loops with errors > 0.20’, but may be performed on all loops. The standard for locating the boundary line between corners is specified in Section 3146.

3122.2 Determination of Bearing

The method used to determine a bearing base for each project must be capable of establishing astronomic, geodetic, or state plane grid azimuth to within 1 minute of arc. Assumed bearings will not be accepted.

3122.3 Use of Global Navigation Satellite Systems (GNSS)

Geodetic/survey grade GNSS equipment and methods may be utilized for measurements and staking by contractors having that capability when it saves cost and/or time compared to conventional methods, but only in situations where appropriate relative accuracy standards can be achieved at the 2σ (95%) confidence interval. It is the contractor’s responsibility to be aware of the limitations of any measurement/staking tool used and be able to demonstrate that relative accuracy standards have been achieved. The use of GNSS to measure a line does not relieve the Contractor from the responsibility to search and evaluate all evidence of GLO and/or subsequent surveys and to tie evidence of encroachment and occupation onto Government land.

If field procedures include the use of GNSS equipment, clearing the site location is limited to shrubs and trees under 6 inches in diameter except in areas of forest disease mitigation outlined in the project scope. The COR must approve all other clearing by the Contractor on National Forest System lands. All clearing on privately owned lands must be approved in writing by the property owner.

All GNSS work shall conform to the Forest Service “Standards For the Positional Accuracy of Cadastral Surveys When using Global Navigation Satellite Systems (GNSS)”. Note that these standards refer to 3-dimensional position solutions at the 2σ (95%) confidence level. If Real Time Kinematic (RTK) techniques are used, ensure that repeat measurement tolerances are set in both field and office software at or below required positional accuracy at the 95% confidence level. A minimum of 3 independent measurements of at least 30 epochs of data shall be collected for each RTK point. Any station with uncertainties greater than those outlined in these standards will either need to be re-occupied or made part of a conventional traverse to confirm the coordinate values. Distances between intervisible pairs of project GNSS control points shall be checked by EDM measurement to verify relative positional accuracy prior to utilizing control to perform additional conventional traverse or radial ties.

3122.4 Records Research

It is the Contractor's responsibility to research the records of public agencies, and private records to the extent necessary, to obtain the survey history of the subject property and relevant adjoining properties. The Contractor shall provide the results of any records research to the COR prior to the start of field work. Copies of any subsequent research shall also be provided to the COR as they are acquired.

The Government will provide the Contractor information in their possession:

Government title records, any corner recovery information and previous survey records at the time of Request for Services. It is the Contractor’s responsibility to evaluate corner and survey records for accuracy and completeness as well as relevance to survey decisions made in determining Government property boundaries.

3122.5 Adjoiner Notification

Prior to the start of field work, the Contractor shall develop a list of adjoining property owners and notify the affected adjoiners of the pending survey in writing

(see Exhibit 8 for example). In addition to notification, the letter will address the necessity for access, marking of accessories and minor clearing of line on private land if necessary. A list of adjoiners, including property descriptions, shall be provided to the COR prior to the start of field work.

3122.6 Conflicts and Encroachments

The Contractor is not required to resolve title or possession conflicts, but shall accurately report the facts and any professional opinions that are relevant to the conflict prior to posting boundary lines. The Contractor shall identify, by survey, any encroachments or lines of occupation along the boundaries of National Forest System (NFS) lands. The nature and extent of the encroachment or lines of occupation shall be documented in a narrative as part of the Report of Survey as well as graphically on the Control Diagram and Certificate of Survey drawings. When encountering fences, please be specific as to the condition of the fence and whether it is being maintained.

3122.7 Field Notes and Point Numbering

During the field work, the contractor will keep a record of the survey in a field book with sufficient detail to provide verification of the final survey record. Field notes should be well organized, accurate, neat, legible, detailed and complete (see Exhibit 11 for example). On multi-section projects, field notes shall be organized, labelled and separated by section. This can most easily be achieved by utilizing loose leaf field books. Field notes should contain sketches roughly to scale that accurately depict and clarify the ground survey and contain neatly printed annotation and a north arrow. Avoid crowding too much information onto a page.

Field data should be recorded in such a manner as to allow another technically qualified person to readily retrace the survey without consultation with the Contractor. Field notes shall include information on all monuments recovered and set, including: monument size and type, height above or below ground, reference to occupation lines and roads, and accessories listed in clockwise order from North.

Bearings and distances to accessories and any conflicting monumentation should be measured with a compass and tape. Monument dimensions shall also be measured with a tape and not estimated.

If the Contractor uses an electronic data collector, the raw data file shall contain all measurements and error checks and be submitted as part of the Report of Survey.

Hardcopy field notes are also required as summary documentation of field measurements and monument information as required above.

In an effort to maintain clarity and consistency of Forest Service survey records, the contractor shall adhere to the following point numbering scheme:

1-2999 Survey control, including recovered monuments, recovered evidence, GPS control and intermediate traverse points.

3000-3999 Computed controlling or property corner positions.

4000-4999 Check shots on set corner monuments. Should correspond to computed point number, i.e. check on 3012 should be 4012.

5000+ Topographic ties, property line offset points, encroachment/occupation ties, etc.

All descriptive codes used for points should be concise, consistent, and easy to interpret.

3122.8 Clearing for Control Survey

Clearing shall be kept to the minimum necessary for the survey and may be limited in the project scope to mitigate spread of forest diseases. Survey operation should be kept on Government land whenever possible. No timber or brush of scenic or commercial value shall be cut along control traverse lines. In an effort to preserve homes for various wildlife, please refrain from cutting standing dead trees unless they pose a safety hazard. The contractor is responsible for obtaining permission from landowners prior to clearing line on private land.

3125 CONTROL DIAGRAM

The Contractor shall electronically provide a control diagram in an AutoCAD 2020 (or previous release) compatible .dwg file showing reduced data of the control survey and any survey computations made to determine property boundaries. If the project is within a township that the Contractor has previously performed work for the Government, then the AutoCAD file shall contain both the previous work as well as the current project work.

Control diagrams shall be drawn to a scale of 1”=800’ with dimension text at a height of 64. Orientation of all text shall be to read from the top or left side of the sheet.

Diagrams should be configured to plot on no larger than an “E” size sheet. A surveyor’s legend shall be included to identify record measurements by the 3 initials of the surveyor’s name. Distance measurements shall be shown in reverse chronological order, with current measurement shown first and adjacent to line (see Exhibit 9 for example). The following standard symbols shall be used on all drawings:

The legend shall also state monument type for section subdivisional corners set (i.e., ½”X18” rebar with cap #12345). All diagrams shall also contain statements regarding the project combined grid factor and conversion to ground units, the method of section subdivision, and a concise narrative of any existing conflicting monumentation found and why it was not accepted. The following CAD layer standards shall also be followed and a drawing template shall be submitted to the COR at the post award conference:

Layer Name Linetype Color BUILDING Continuous Cyan CENTERLINE Center2 Green DRIVE-TRAIL Continuous Red EASEMENT Dashed2 Yellow FENCE Fence --x-- Yellow POINTS CONTROL Continuous White POINTS COMP Continuous Green POINTS CHECK Continuous Yellow POINTS TOPO Continuous Cyan PROPERTY LINE Continuous Magenta RIGHT-OF-WAY Hidden2 White SECTION LINE Phantom2 Red SYMBOLS Continuous White TEXT-DIMENSION Continuous Green TEXT-SMALL Continuous Red TEXT-LARGE Continuous Cyan TOPO FEATURES Continuous Cyan TREELINE Treeline_L or Treeline_R Green VIEWPORT Continuous Gray Minimal additional layers needed for drawing border.

A preliminary control diagram and Land Corner Recordation Certificates (LCRC’s) for all GLO corners requiring monumentation shall be provided to the COR prior to the posting or monumentation on any project. A narrative report shall be included with the control diagram and shall describe the basis for the survey decisions made and a discussion of the evidence, methods, and procedures used in determining the location of all controlling corners within the survey.

The COR will be allowed 5 working days to review the submitted documentation. A comma delimited text file of coordinates with descriptors for each point shall be provided with all diagrams. If the control diagram contains previous work within a township, then point numbers shall not be reused within the current project work (see Section 3122.7 for point numbering standards). A final control diagram showing all survey control shall be included in the Report of Survey as specified in Section 3160.

3130 CORNER MAINTENANCE AND ACCESSORIES

For all controlling corners measured as part of the control survey, all existing bearing trees that falls on NFS lands shall have a 4” red band painted at a height shown in Exhibit 5. All other maintenance of existing corners must be approved by the COR and shall only be performed when requested through a delivery/task order.

When maintenance is performed, the Contractor shall ensure that existing monuments are firmly and securely set in their original location. The Contractor shall also ensure that existing signs on posts and trees are securely attached and legible. Signs that are damaged or deteriorated shall be replaced. The Contractor shall establish new bearing trees or objects to replace dead, damaged, dying, or missing bearing trees or objects in accordance with Section 3137. Signs to be used are shown in Exhibit 4.

Sign placement shall be in accordance with Exhibit 5.

3130.1 Brush and debris within a 3-foot radius of the corner shall be cleared away.

3130.2

The Contractor shall notify the COR of any damaged or missing monuments.

3135 CORNER MONUMENTATION AND ACCESSORIES

3136 Monumentation

All original GLO corners requiring monumentation under this contract shall be perpetuated or reestablished using a monument provided by the Government. Section subdivisional and other corners will be marked with a monument that meets State of Michigan requirements and will be supplied by the Contractor and monument type will be included in all drawing legends. If a conflicting monument is found at a C ¼ corner, then the C ¼ corner may be established using a monument provided by the Government. An appropriate measuring tool that can achieve required relative accuracy standards shall be used to establish the position where each monument will be set.

Corner positions that fall in non-hard surface roadways shall be set 10-12” below the surface of the road. GLO corner positions that fall in hard surface roadways shall be contained within a visible protected enclosure and shall comply with any requirements of the agency having jurisdiction over the roadway. Per Act 132 of 1970 and Act 283 of 1909, the intersections of boundary lines with year round state/county maintained road rights-of-way shall be monumented. If a road generally follows a section or ¼ line, then that shall be held for the centerline. The COR shall be contacted prior to monumenting a right-of-way other than 2 rods from a section or ¼ line. All corner positions reestablished/established shall meet the specifications in Section 3122.1.

3136.1 Monument Stamping

All original GLO and C ¼ corners monumented under this contract using a monument provided by the Government shall be stamped in accordance with the current BLM Manual of Surveying Instructions (limited examples shown in Exhibit 5). The Contractor should make examples of proper stamping readily available to field staff to avoid incorrect stamping. Monuments that are incorrectly stamped by the Contractor will be replaced with a properly stamped monument at the Contractor’s expense. In addition to the corner designation and year the monument was set, the surveyor’s license number shall be stamped near the lower perimeter of the cap. A 1/8” stamp set shall be used for all monument and sign stamping.

3136.2 Signing

Signs to be used are shown in Exhibit 4. Sign placement and attachment shall be in accordance with Exhibit 5. All metal or fiberglass posts and signs will be provided by the Government. Each bearing tree requires a sign 54-3. All other accessories such as posts or poles require a sign 54-5. Posts or poles should only be used as accessories as a last resort.

Each corner monument set and/or accepted under this contract shall have a metal post with sign 54-9 attached or fiberglass post with decal P71-10 affixed, placed within 1 foot of the monument and along the property line where the corner does not fall in a roadway, if one does not already exist. For corners that fall in a roadway and a line originating from the corner is being posted, then a fiberglass post with decal P54-1 will be set along the line at the approximate road right-of-way limit, if one does not already exist. For corners that fall in a roadway and a line originating from the corner is not being posted, then a fiberglass post with decal P71-10 will be set at the approximate road right-of-way limit and facing the corner, if one does not already exist. For forest roads of unknown right-of-way width, posts shall be placed at an appropriate distance from the corner as to not sustain damage from road use and/or maintenance activities.

3137 Bearing Trees and Accessories

All corners established, reestablished and/or maintained in this contract shall have a minimum of four accessories marked in accordance with Exhibit 5, unless otherwise directed by the COR. Bearing trees should typically be greater than 30 feet from the corner, outside of road right-of-ways, greater than 30° apart, and be selected based on their durability (refer to Exhibit 7 for excerpts from BLM training publication “Durability of Bearing Trees”). If historical bearing trees are found to not meet the above criteria, they should still be remeasured and included as an additional accessory to the corner. If historical bearing trees are either in poor condition or within 10 feet of the corner, they should be shown in addition to the minimum four “good” accessories.

Bearing, to the center of the base of accessories, shall be referenced to true North and have a tolerance of ≤3°. Note that metal objects, such as watches, pencil clips, spikes, hammers, etc. should not be in or near hands when obtaining bearings using a magnetic compass. To ensure an accurate compass reading the compass must be held level so the needle swings freely and independent readings should be taken at least twice (refer to Exhibit 13 for excerpts from Basic Land Navigation). Accessories shall always be listed in clockwise order from North. Note that posts identifying the corner are not considered accessories for the purpose of reestablishing the corner position and should be listed last. Location of reference nails in accessories shall be reported as well as horizontal distances to the nearest 0.01 feet. Note that it typically requires two people to effectively tape an accurate horizontal distance, slope distance is not acceptable. Also, distances obtained by inversing between GNSS measurements generally will not meet relative accuracy standards and should always be verified with a tape.

3138 Recordation of Corner Certificates

For each GLO and C ¼ corner position monumented or maintained under this contract, a corner certificate meeting the requirements of Act 74 shall be prepared.

Additional requirements for submitting corners through the county remonumentation program may also be required when part of a project scope. Corner certificates may be required for section subdivisional corners when part of a project scope. The certificates will document the entire survey history of the corner position, including method of any previous restoration and measurements made to adjacent controlling corners. The current condition of all previous accessories for the corner shall also be noted and all existing accessories in good condition shall be included in Part C. For clarity and consistency, the format of information to be included on submitted LCRC’s shall be similar to that shown in Exhibit 10.

If conflicting monumentation is recovered at a corner position, this shall be documented on the LCRC. Rationale for accepting and rejecting positions when conflicting monumentation exists shall be presented in a concise but detailed and defendable manner. A detailed list of all collateral evidence supporting the decision for acceptance or rejection shall be included in Part B (see Exhibit 10 for example).

In order to maintain clarity for the reader, it is imperative that the narrative be as concise as possible and focus on the evidence recovered, not necessarily on how it was recovered, although the extent of search area/effort should be included.

Preliminary LCRC’s for all GLO corners requiring monumentation along with a preliminary control diagram shall be provided to the COR prior to the posting or monumentation of any designated project. The COR will be allowed 5 working days to review the submitted documentation. A maximum of 1 GLO or 2 section subdivisional corners shall be documented per form. Prior to recordation, the final certificate(s) will be submitted to the COR for review.

3140 PROPERTY LINE MAINTENANCE AND REPOSTING

Maintenance and/or reposting of previously surveyed and marked property line may be requested to be performed through a delivery/task order.

3141 Property Line Maintenance

Maintenance shall consist of repainting existing line and corner posts, line and off line trees, and corner accessories. If fiberglass posts are found along property lines, then orange flagging shall be tied along the tops. If corner posts are found to be missing or in poor condition, they shall be replaced.

A report shall be submitted noting the density of vegetation along the lines, the general condition of the line posts, and condition of each corner accessory, including current diameter and if tags are missing. If line posts are found to be missing or moved, specific information shall be provided regarding the location and number of posts. The report shall also include information regarding any encroachments or other unauthorized uses occurring along the lines being maintained. The report can consist of neat and legible notations on survey documents of record or a more formal report format. If the prior survey documents of record include identified encroachments, the report shall include the status of those encroachments (ex.

resolved, still exist, expanded).

3142 Property Line Reposting

If the condition of a previously marked line(s) is reported to be extremely over grown and/or no longer adequately posted, then reposting of the line may be requested through a delivery/task order. Reposting shall consist of clearing the property line, painting and reflagging of existing posts, placing additional posts and signs, and blazing and painting trees in accordance with Sections 3146 thru 3147.4.

3145 PROPERTY LINE LOCATION AND POSTING

The Contractor shall locate and post the property lines in accordance with the following specifications.

3146 Locating the Property Line

The position of property corners controlling the location of the property line shall be based on the deeded ownership of the USA along with controlling corners that were relied upon at the time of acquisition. All property corners shall be located by survey methods that ensure that they meet or exceed the accuracy requirements set forth in Section 3122. If a conflict is discovered between deeded ownership of the USA and 1 or more adjoiners, this shall be brought to the attention of the COR prior to any marking or posting. Documentation of conflicting title lines shall be included as part of the Report of Survey as specified in Section 3160.

3147 Posting the Property Line

Posting is the act of placing posts and signs along the property line so that it is readily identifiable. The posts and signs defining the property line shall have a positional error tolerance of ±0.5 feet in relation to the boundary line being posted. Some of the signs that are available are shown on Exhibit 4. All signs and posts will be provided by the Government. Temporary lath may be left in place between posts, however, all other temporary lath should be removed and reused as a cost control measure.

3147.1 Clearing Property Line

Line clearing shall be limited in areas of forest disease mitigation when outlined in the project scope. When not specifically limited in the scope the property line will be cleared of small trees, brush, and debris to allow easy foot travel, unless the line is defined by a feature such as a hedge. In an effort to preserve necessary homes for various wildlife, please refrain from cutting standing dead trees when clearing National Forest property lines unless they pose a safety hazard. It is not necessary to disturb or remove existing large down logs from the line. Trees over 6 inches in diameter shall not be cut along property lines. All cutting debris shall be placed on the government side of the line. If greater than 50% of the property lines for a designated project cross densely vegetated wetland, the Forest Service may provide a sawyer, if available, upon request of the Contractor.

If a chainsaw is used for line clearing, the following personal protective equipment (PPE) is required for the operator: Forest Service approved hardhat (ANSI Z89.1, Type1, Class E), eye protection, hearing protection (85 dB and above), appropriate gloves (cut-resistant for chain filing), long sleeved shirt, chainsaw chaps, heavy duty, cut resistant or leather 8” high laced boots with nonskid soles.

3147.2 Boundary Sign Placement

Posting the property line shall include placing fiberglass line posts along the true property line located to the standard specified in Section 3147. A properly designed driver shall be used to install posts to a minimum depth of 24”. Orange flagging shall be tied to the top of each post to increase their visibility along the line.

Line posts shall be placed at ridge, stream, road, and trail crossings (see Exhibit 6).

Where Forest Service trails and roads are intersected, posts shall be placed 5-10 feet either side of the traveled roadway. Where county/state roads are intersected, posts shall be placed on each side at approximate right-of-way limits. Please be specific in describing the type of road or trail that crosses a NFS property line. Examples are;

year-round county maintained, county seasonal, FR #1234, access drive to private, user created road or ATV trail accessing NFS.

Posts shall be placed 75-125 feet from each corner controlling the location of the property line where the corner does not fall in a roadway. Where corners fall in a roadway, the first post shall be placed as directed above then the second post shall be placed 75-125 feet from the first. Additional posts shall be placed at not more than 250 foot intervals elsewhere along the line. Exact interval between posts will be dependent upon terrain. Posts shall be placed so as to be intervisible, if the trees and brush were removed. Sign 54-2, “Property Boundary”, may be placed on line trees where they fall approximately mid-way between line posts when required by the project scope.

3147.3 Blazing and Painting Property Line

Posting the property line shall include blazing all trees (over 4 in. dia.) on National Forest lands within arm’s reach (±3’) of the property line. If a situation is encountered where many closely spaced trees fall within arm’s reach of the property line, then trees may be blazed at ±30 foot intervals. The only acceptable tool for blazing is a sharp long handled axe. New blazes should be narrow and just through the bark into the live wood tissue. Old blazes along the property line shall not be reopened, just repainted. Trees located on private lands will not be marked but may be repainted if previously blazed. See Exhibit 6 and 14 for blazing specifications.

A durable, oil-based red enamel paint shall be applied to all blazes, new and old, on trees used to mark the property line and bearing tree blazes and bands. Oil-based paint is to be applied only with a disposable brush and shall be applied in sufficient quantity to completely cover the entire surface of the blaze. All use of oil-based paint shall be in accordance with the manufacturer’s material safety data sheet.

3147.4 Visually Sensitive Areas

Visually sensitive areas near homes and public use areas should be posted in a less visible manner. The COR shall be contacted if the visually sensitive nature of an area is in question. Areas determined to be visually sensitive shall only be posted using fiberglass posts with decals P54-1 and P71-10. Tree blazes and paint will be limited to areas outside of the visually sensitive areas.

3150 CERTIFICATE OF SURVEY

The Contractor shall prepare a recordable Michigan PA 132 of 1970 Certificate of Survey drawing similar to that shown in Exhibit 9 when included as part of the scope of work. The control diagram should not be included as part of the certificate. The certificate(s) shall show the relationship of recovered, reestablished and established corner positions used for the survey. This may also include corner positions measured under previous delivery/task orders. A description of all monuments recovered, reestablished and established along with their accessories shall be included on the certificate(s). Any monuments found near a corner position and rejected shall also be described and shown. Distance from monument to any line(s) of occupation shall be included in the description.

The National Forest property boundary posted shall be shown with a heavier solid line. All overlaps, hiatus, lines of occupation and/or encroachments will be clearly shown on the drawing (may require separate detail), whether created by deed calls, man-made features or monumentation.

All certificates of survey will display measured distance, as well as previous record data, in feet. Distance measurements shall be shown in reverse chronological order, with current measurement first and adjacent to line (see Exhibit 9 for example).

Projects performed using a state plane grid system shall display distances as grid in international feet. The certificate shall include a statement describing the distance units, mean project combined grid factor, and a conversion formula from grid to ground distance. All certificates shall also contain statements regarding the method of section subdivision and a concise narrative of any existing conflicting monumentation found and why it was not accepted. The certificate shall also include a data table listing the geodetic and grid coordinates, to at least 3 decimal places, for all GLO corner positions recovered, reestablished and established.

The survey drawing shall be prepared using a CAD system and shall be of high quality and to professional standards. Drawings should be sharp, clean, distinct, and legible. The drawing shall utilize the symbol, layer and surveyor’s legend standards outlined in Section 3125. Submission of the certificate is required in both hard copy and an AutoCAD 2020 (or previous release) compatible .dwg file. The AutoCAD file shall include all point data, including descriptors for each point, but need not include the Contractor’s drawing border.

All Contractor produced AutoCAD drawings shall become the property of the Government and the Government shall have the right to reuse these items in future projects as it sees fit without further compensation to the Contractor.

3151 Conflicts and Encroachments

Information regarding visible signs of encroachment, trespass, or lines of occupation shall be shown and described on the certificate of survey. The extent of all encroachments shall be detailed on the certificate. If a project does not require a certificate of survey, the extent of all encroachments shall be detailed on the control diagram. When reporting fences, please be specific as to the condition of the fence and whether it is being maintained.

3152 Filing or Recording of Certificates and LCRC Forms

The Contractor shall file or record the certificate of survey and the applicable LCRC forms in the appropriate jurisdiction in accordance with local and state statutes. Prior to filing or recording, one hard copy of the certificate and any land corner recordation forms shall be submitted to the COR for final review and acceptance. The Contractor may be asked to present/defend their corner position(s) before a county remonumentation peer review group. After acceptance and recordation, a copy of the recorded data with county filing information shall be furnished to the Government.

3155 TOPOGRAPHIC MAP

When topographic surveying is requested, the size and scale of the drawing will be specified in the scope of work. The survey drawing shall be prepared using a CAD system and shall be of high quality and to professional standards. Drawings should be sharp, clean, distinct, and legible. Submission of the topographic map is required in both hard copy and an AutoCAD 2020 (or previous release) compatible .dwg file.

The AutoCAD file shall include all point data, including descriptors for each point, but need not include the Contractor’s drawing border.

3160 SUMMARY OF SURVEY SUBMITTALS

The following is a summary of the items to be furnished to the Government during the course of executing a project. Items 3160.5 thru 3160.12 shall be submitted in a report format with cover page and table of contents:

3160.1 Records research acquired during course of project.

3160.2 List of adjoining landowners with legal descriptions.

3160.3 Electronic preliminary control diagram with points and narrative report describing basis for and survey decisions made.

3160.4 Preliminary LCRC’s for all GLO corners requiring monumentation (see

Exhibit 10 for required format).

3160.5 Report of Survey narrative to include conflicts and encroachments, contact with adjacent landowners regarding conflicts, and quality control checks performed by the Contractor.

3160.6 Final Control Diagram and/or Topographic map with all points in both hard copy and AutoCAD 2020 (or previous release) compatible .dwg file.

3160.7 Certificate of Survey drawing (if required) in both hard copy and AutoCAD 2020 (or previous release) compatible .dwg file (see Exhibit 9 for example format, also include statements required under 3150-1).

3160.8 Final Land Corner Recordation Certificates for all monumented and maintained corners.

3160.9 Report of closure for all traverse loops and/or report of relative accuracies obtained by methods other than a closed loop.

3160.10 Copy of field notes and raw data files that include all error checks.

3160.11 Project coordinate listing including descriptors for each point in hard copy and a comma delimited text file.

3160.12 GNSS measurement report to include how state plane coordinates were established for the project and OPUS solution reports. Survey measurements performed using RTK GNSS techniques shall include a summary report showing all independent measurements observed for each point. The difference between multiple independent measurements shall be within acceptable tolerance according to state statute and Forest Service standards.

3170 PERFORMANCE OF SERVICES

(A) Quality Control:

The Contractor shall provide adequate internal controls and review procedures to eliminate conflicts, errors and omissions, and to insure the technical accuracy of all services and products. The Contractor should review their Quality Control Plan prior to commencing work on each project. All submittals shall be reviewed for contract compliance prior to delivery.

(B) Site Visits, Inspections, and Investigations:

The Contractor shall notify the Government of all project site visits, inspections, meetings, or conferences. The Contractor shall visit and inspect/investigate the identified project site(s) as necessary and as required during the preparation and accomplishment of the work.

(C) Meetings and Conferences:

Periodic meetings shall be held, whenever requested by the Government or the Contractor, to resolve questions and problems relating to the work required under each delivery/task order.

The Contractor shall be required to attend and participate in all conferences. These conferences may be located at the project site, Contractor’s Office, a Forest Service Office, or other locations.

(D) Coordination and Execution of the Work:

The Contractor shall furnish sufficient technical, supervisory, and administrative personnel to insure execution of the work in accordance with the schedule in the delivery/task order.

During the execution of the work, the Contractor shall keep in close liaison with the Government Project leader.

Work beyond the original scope of work shall be accomplished only at the direction of the Contracting Officer or designated representative.

(E) Submission of Project Data:

The Contractor shall submit all documentation as required under Section 3160 for review by the Contracting Officer or designated representative by the negotiated delivery date as specified in the delivery/task order.

3180 SELF INSPECTION AND QUALITY CONTROL PLAN

The Contractor shall prepare a proposed inspection and quality control plan and submit to the COR for review and discussion at the post award conference. The plan should include the steps the Contractor will take to ensure that all work performed meets the requirements of the contract. At a minimum, the plan shall address the following items:

(a) The Contractor shall be responsible for performing self-inspection for quality control on all measurement, corner monumentation and line posting of Forest boundaries. This shall include:

1. Utilizing proper tools and field techniques to achieve required positional accuracy of measurements and staking.

2. Checking all bearings and distances to evidence and accessories.

3. Proper stamping and setting of monuments.

4. Proper marking and posting of lines and accessories.

(b) The Contractor shall be responsible for performing quality control checks to ensure acceptable error of closure is met for all survey work performed. The results of these quality control checks shall be included in the Report of Survey narrative as required in Sections 3122.1 and 3160.

(c) The Contractor shall be responsible for performing quality control checks on all survey documents prior to their submittal to the COR for review and acceptance. The Contractor’s Quality Control Plan shall include a project submission checklist.

3190 DEFINITIONS:

The Definition of Work Items shown below establishes and defines the work that may be performed under this contract. Project locations and specific work items have not been determined at this time. Delivery/task orders, issued in accordance with the contract specifications, will be used to specify project locations and work items to be performed.

Negotiated cost for services performed under this contract will be based upon the Definition of Work Items and scope of each project.

Definition of Work Items:

A. Corner Search – To include all records search and field work (except line measurement) associated with corner evidence evaluation necessary to perpetuate or reestablish a historical corner position. The rate for this item is typically related to the complexity of the corner history and/or recoverability of record evidence. This item does not pertain to obtaining ties to monumentation established during post ±1970 surveys. Ties to these monuments are considered an incidental part of the survey and are required to be shown on the control diagram and certificate of survey.

This item of work may only be performed during snow free periods.

B. Corner Maintenance – To ensure that existing monuments are firmly and securely set in their original location and that existing signs on posts and trees are securely attached and legible. Signs that are damaged or deteriorated shall be replaced. Also to replace dead, damaged, or destroyed bearing trees or objects with new references marked to BLM Manual and Forest Service standards so that the corner has 4 good accessories. Includes the documentation and filing of a Michigan Land Corner Recordation Certificate (LCRC).

C. Corner Monumentation – To place a monument and establish accessories at each position recovered from evidence, reestablished and established when a substantial monument does not already exist and typically includes the documentation and filing of a Michigan LCRC. This item may include original GLO corner positions and C ¼ corners where a conflicting monument exists to be submitted through the county remonumentation program and also time to attend a peer review meeting. Section subdivisional corners of 1/16 or less or other National Forest System (NFS) land property corners may not require establishing accessories and filing a LCRC.

D. Property Line Measured – The measuring of Government property lines on exterior or interior of sections. Measurement of the line can be performed by conventional traverse, GNSS, or a combination of the two methods. This item includes locating of traverse routes, all line clearing, measurements, data collection, reduction, and reporting.

E. Control Measurement – Measurements resulting in the straight horizontal line derived by inversing between controlling and monumented corner positions along the original survey. The total miles of control measurement will not include measurement along property lines designated under the Property Line Measured. Measurement of the line can be performed by conventional traverse, GNSS, or a combination of the two methods. This item includes locating of traverse routes, all line clearing, measurements, data collection, reduction, and reporting. It also includes painting of red bands on all controlling corner bearing trees falling on NFS lands.

F. Property Line Posted – The horizontal line between controlling and monumented corner positions posted as property line with posts and signs according to the specifications in Section 3147.

G. Property Line Maintenance - The horizontal line between controlling corner positions previously surveyed and posted requested to be maintained in accordance with the specifications in Section 3141 and includes reporting.

H. Property Line Reposted - The horizontal line between controlling corner positions previously surveyed and posted requested to be reposted in accordance with the specifications in Section 3142 and includes reporting.

I. Certificate of Survey – A multi-page drawing, meeting the specifications as defined in Section 3150. This item pertains to a drawing showing the retracement and subdivision of a single section within a township. This shall include ties to all controlling corners used to reestablish GLO corner positions. A multi-section project may require additional drawings of sections within the same or a different township.

This item may not be payable until the COR has approved the Certificate of Survey.

J. Topographic Survey – A survey that determines ground relief and location of natural and man-made objects and delineates those features on a drawing. This item includes the combination of field and drafting work required to complete the survey and drawing.

K. Monument Box Installation – Provide a monument box (visible protected enclosure) with lid that has approximate opening size of 6 ½” and height of 10”. Provide labor and other tools and materials necessary to install the monument box in accordance with county/state road agency standards.

DELTA

KENT

HURON

BAY

SANILAC

LAKE

IONIA

MACKINAC

OAKLAND

CASS

ALLEGAN

IOSCO

WAYNE

CLARE

SAGINAW

TUSCOLA

BARRY EATON

LAPEER

ALCONA

NEWAYGO

ST. CLAIR

LENAWEE

JACKSON

ALPENA

CALHOUN

INGHAM

MASON

ANTRIM

OTTAWA

GENESEE

EMMET

OSCODA

CLINTON

BERRIEN

OCEANA

GRATIOT

MONROE

MONTCALM

CHEBOYGAN

OGEMAW

BRANCH

OTSEGO

ISABELLA

OSCEOLA

MIDLANDMECOSTA

HILLSDALE

WEXFORD

GLADWIN

MANISTEE

KALKASKA

WASHTENAWVAN BUREN

MACOMB

MISSAUKEE

LIVINGSTON

BENZIE

CRAWFORD

KALAMAZOO

PRESQUE ISLE

MUSKEGON

ST. JOSEPH

ARENAC

ROSCOMMON

SHIAWASSEE

MONTMORENCY

LEELANAU

CHARLEVOIX

GRAND TRAVERSE

Exhibit 2 - Huron-Manistee National Forests Vicinity Map

Zone 1 - Huron National ForestZone 2 - Manistee

National Forest

Exhibit 3 – Land Surveying Job Hazard Analysis

FS-6700-7 (01/01)

U.S. Department of Agriculture 1. WORK PROJECT/ACTIVITY 2. LOCATION 3. UNIT

Forest Service Land Surveying Huron-Manistee National Forests Huron-Manistee N.F.

JOB HAZARD ANALYSIS (JHA) 4. NAME OF ANALYST 5. JOB TITLE 6. DATE PREPARED

References-FSH 6709.11 and -12

(Instructions on Reverse) Carol A. Waite Forest Land Surveyor January 2008

7. TASKS/PROCEDURES 8. HAZARDS 9. ABATEMENT ACTIONS

Engineering Controls * Substitution * Administrative Controls * PPE

Driving to, from and at Site

Corner search, monumentation, and traversing

Power Tool Use:

Brush Cutter, Chain saw

Hand Cutting Tool Use:

Axe, Sandvik, Machete

Posting and Painting

Vehicle Accidents

Highway Traffic, Flying Objects, Flammable Substance, Heavy Loads

Cutting self or others, Flying Objects, Fires, Kick out

Cutting self or others

Impacts from posts or driver, splash or spray of paint

Perform safety checks on vehicle before driving, wear safety belt, use defensive driving techniques, at work site park vehicle in a location that will not impede the normal flow of traffic and facing in the direction of departure. When backing, always use a spotter if available. When a spotter is not available, the driver shall make a visual inspection around vehicle prior to backing. When turning around, always face the danger. FSH 6709.11, 12.

Post signs and safety cones when working along roads. Wear high visibility safety vest.

Use spotter on hills and curves.

Wear hardhat, eye protection and gloves when digging in roadways. Follow manufacturer’s safety guidelines for use of chipping hammer and torch to thaw gravel roads in winter and proper outside storage of portable propane tank.

Make additional trips instead of carrying too many pieces of equipment or materials.

Wear proper PPE: Chaps, hardhat, long sleeved shirt, leather gloves, hearing protection, eye protection heavy-duty non-slip leather boots or waterproof rubber boots with steel toes. Utilize spotter when falling trees. Maintain safe working distance from operator of at least 2 ½ tree lengths for chainsaw and 50ft for brush cutter. Predetermine escape routes and use safety zone concept when falling. Follow manufacturer’s safety guidelines for proper use and storage of power tools. Ensure proper maintenance of equipment and perform daily checks.