Attachment_A_-_Schedule_of_Items_(Wood_Super).docx
DOCX document 15 KB Posted
- Solicitation number
- 12569R19B0008
About this file
Attachment A
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12569R19B0008 Attachment A - Schedule of Items
Item Item Code No.
Estimated Quantities
Units
Unit Price
Amount
| MOBILIZATION |
| 15101 |
| 1 |
| LPSM |
CONSTRUCTION SURVEY AND STAKING,
METHOD 1, TOLERANCE CLASS C
15201
0.09
MILE
| SILT FENCE |
| 15702 |
| 685 |
| LNFT |
CLEARING AND GRUBBING, DISPOSAL METHOD
F
20102
0.1
ACRE
| PAVEMENT REMOVAL |
| 20303 |
| 104 |
| SQYD |
| REMOVAL OF OLD STRUCTURE |
| 20304 |
| 1 |
| LPSM |
| SELECT BORROW, COMPACTION METHOD 2 |
| 20407 |
| 80 |
| CUYD |
| STRUCTURE EXCAVATION |
| 20801 |
| 228 |
| CUYD |
| STRUCTURAL BACKFILL |
| 20803 |
| 228 |
| CUYD |
| RIPRAP, CLASS IV |
| 25101 |
| 100 |
| CUYD |
| GEOTEXTILE, TYPE IV, CLASS I |
| 25319 |
| 120 |
| SYD |
AGGREGATE BASE, GRADING D, COMPACTION
METHOD B
30103
CUYD
ASPHALT CEMENT, MICHIGAN STATE DOT
GRADE LVSP
40312
TON
| SAW CUTTING AND JOINT SEALING |
| 41406 |
| 96 |
| LNFT |
14 INCH DIA x 0.375 INCH STEEL SHELL CIP
CONCRETE PILES, FURNISHED & DRIVEN
55109
LNFT
| FURNISH PILE DRIVING EQUIPMENT |
| 55151 |
| 1 |
| LPSM |
| BRIDGE SUBSTRUCTURE, TREATED TIMBER |
| 57105 |
| 1 |
| LPSM |
BRIDGE SUPERSTRUCTURE, TREATED TIMBER
57106
LPSM
| SEEDING, DRY METHOD |
| 62503 |
| 1 |
| LPSM |
| MULCHING, DRY METHOD |
| 62509 |
| 1 |
| LPSM |
| OBJECT MARKERS |
| 63306 |
| 4 |
| EACH |
| TEMPORARY TRAFFIC CONTROL |
| 63501 |
| 1 |
| LPSM |
| TOTAL COST = |
| $ |
File details come from the government source that posted it.