12569R18Q0011_OTT_Henry_Lake_Fishing_Pier.rtf
RTF text file 561 KB Posted
- Attached to
- OTT - Henry Lake Fishing Pier
- Solicitation number
- 12569R18Q0011
About this file
12569R18Q0011 Henry Lake Fishing Pier Solicitation Document
Text of this file
Ottawa National Forest 12569R18Q0011 Henry Lake Fishing Pier
REQUEST FOR QUOTATION
PAGE OF PAGES
(THIS IS NOT AN ORDER)
THIS RFQ
IS
IS NOT A SMALL BUSINESS SET- ASIDE
1. REQUEST NO.
2. DATE ISSUED
3. REQUISITION/PURCHASE REQUEST NO.
4. CERT. FOR NAT.DEF.
RATING
12569R18Q0011 April 17, 2018
UNDER BDSA REG. 2
AND/OR DMS REG. 1
5a. ISSUED BY
6. DELIVER BY (Date) LSAT Contracting, 820 Rains Drive, Gladstone, MI 49837 See Section F 5b. FOR INFORMATION CALL (NO COLLECT CALLS)
7. DELIVERY
FOB DESTINATION
NAME
TELEPHONE NUMBER
OTHER (See Schedule)
AREA CODE
NUMBER
9. DESTINATION
Annette Caliguri (Administrative) Eric Johnson (Technical) 428-5842 285-6898
NAME OF CONSIGNEE
OTTAWA NATIONAL FOREST
BESSEMER RANGER DISTRICT
8. TO:
a. NAME
b. COMPANY
b. STREET ADDRESS
E6248 US HWY 2
c. STREET ADDRESS
c. CITY
IRONWOOD
d. CITY
e. STATE
f. ZIP CODE
d. STATE
e. ZIP CODE
MICHIGAN
49938
10. PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5A ON OR BEFORE CLOSE OF BUSINESS IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in BLOCK 5A. This request does not commit the Government to pay any costs incurred in the preparation of the May 21, 2018 4:30 pm EST submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
ITEM NO.
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(a) (b) (c) (d) (e) (f)
HENRY LAKE FISHING PIER
OTTAWA NATIONAL FOREST
Enter pricing on schedule of items in Sec. B Please complete, sign, date, and return the following documents:
SF18 Form – Blocks 13 & 14 & include DUNS # below Schedule of Items
Section K – Certifications & Representations Technical Proposal or Experience Questionnaire
DUNS #_________________________
This project is 100% set-aside for small businesses.
Payment protections are required on this project.
Please submit hard copy responses to the address in block 5(a) above, referencing the “Request No “on the outer mailing envelope, or electronically to acaliguri@fs.fed.us
a. 10 CALENDAR DAYS (%)
b. 20 CALENDAR DAYS (%)
c. 30 CALENDAR DAYS (%)
d. CALENDAR DAYS
12. DISCOUNT FOR PROMPT PAYMENT
NUMBER
PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER
14. SIGNATURE OF PERSON AUTHORIZED TO
15. DATE OF
a. NAME OF QUOTER
SIGN QUOTATION
QUOTATION
b. STREET ADDRESS
16. SIGNER
a. NAME (Type or print)
b. TELEPHONE
c. COUNTY
AREA CODE
d. CITY
e. STATE
f. ZIP CODE
c. TITLE (Type or Print)
NUMBER
NSN 7540-01-152-8084
Previous edition not usable 18-121 STANDARD FORM 18 (Rev. 6-95) Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
| CONSTRUCTION RFQ | SOL NO |
| UNIT | |
| PROJ NAME | |
| PAGE 1 of 30 |
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
Schedule of Items
ITEM
NO.
DESCRIPTION
PAY
UNIT
EST.
QTY.
TOTAL
PRICE
Henry Lake Fishing Pier
Lump Sum
Contractor Acceptance Statement: By signing the offer, the Contractor agrees to all terms, conditions, and provisions included in the solicitation and agrees to furnish any awarded items at the price set in the schedule unless otherwise excepted as follows: _______________________________________________________________.
NOTES:
There is a requirement for payment protections (Irrevocable Letter of Credit (ILC) or payment bond) if quote is over $35,000. The payment bond or ILC will be for 100% of the award price and submitted within 10 days after contract award. See Section I for additional information. There is no bid guarantee required.
Contractor must be registered at www.sam.gov to be considered. THIS IS A FREE REGISTRATION.
There is a pre bid meeting scheduled for May 14, 2018 at 10:00 a.m. CST, at the Henry Lake Campground Day Use Area.
There is a requirement to submit a technical proposal with your offer. See Section L & M for preparation instructions.
e. Award will be made to one contractor.
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
Scope of Contract
The Henry Lake Fishing Pier project includes removal and disposal of the old fishing pier currently at the location, improvement of the walkway leading to the fishing pier, and construction of a new permanent fishing pier. Potential bidders will bid on work to be performed to specifications and drawings provided as attachments to this solicitation. The preferred fishing pier design for this project will be one that is permanent in nature to eliminate the need for removal/installation during the fall/spring of each year by staff. Potential bidders should bid on the cost to construct a permanent fishing pier with wood pilings installed into the lake substrate that is set forth in the drawings developed by the Region 9 Technical Service Team. Refer to the solicitation attachments for additional details.
Project Location
This project is located at the Henry Lake Campground on the Bessemer Ranger District of the Ottawa National Forest in the Upper Peninsula of Michigan.
From Bessemer, Michigan you will travel east on US 2, approximately 13 miles and turn right (south) onto Dunham Road. Travel approximately 3 miles and turn right (south) onto FR 8100, travel approximately 4.25 miles to the campground.
From Watersmeet, Michigan you will travel west on US 2 approximately 28 miles and turn left onto M 64. Travel approximately 3.5 miles and turn right onto FR 8300, travel approximately 5 miles and turn left onto FR 8100, travel approximately 3 miles to the campground.
Price Range
The Government's estimate is:
between $25,000 and $100,000
AGAR 452.211-72 Statement of Work/Specifications (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
AGAR 452.211-73 Attachments to Statement of Work/Specifications (FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
Sustainable Acquisitions The Contractor shall comply with FAR Part 23 Sustainable Acquisition Policy and all associated laws, rules, regulations, and executive orders referenced therein. Contracts that include the supply of products and for the acquisition of services (including construction) that include the supply of products, require that the products provided are—
(1) Energy-efficient (ENERGY STAR® or Federal Energy Management Program (FEMP)-designated); (applicable if FAR Clause 52.223-15 is included)
(2) Water-efficient; (applicable if FAR Clause 52.223-15 is included)
(3) Biobased; (applicable if FAR Clause 52.223-2 is included)
(4) Environmentally preferable (e.g., EPEAT®-registered, or non-toxic or less toxic alternatives); (applicable if FAR Clause 52.223-13,14, or 16 are included)
(5) Non-ozone depleting; (applicable if FAR clause 52.223-11,12,20, or 21 are included), and/or
(6) Made with recovered materials (EPA-Designated products) (applicable if FAR clause 52.223-9 or 17 is included).
(b) The required products in the contract actions for services include products that are—
(1) Delivered to the Government during performance;
(2) Acquired by the contractor for use in performing services at a Federally-controlled facility; or
(3) Furnished by the contractor for use by the Government.
Sustainable products identified for this solicitation:
The following is a list of sustainable products that that may be used in the performance of this contract. The list is not all inclusive; the Contractor shall research for available products.
Biobased Products: (requires reporting at www.sam.gov by 10/31 each year)
Other files
| File | Type | Posted |
|---|---|---|
| QUESTIONS,_ANSWERS_&_CLARIFICATIONS.docx | DOCX document | |
| 20180523Revised-ATTACHMENT_B_-_PLANS__DRAWINGS.pdf | ||
| SF_30_Amendment_12569R18Q0011_Henry_Lake_Fishing_Pier.pdf | ||
| Henry_Lake_Pre_Bid_Meeting_Attendees.pdf | ||
| ATTACHMENT_D_-_TECHNICAL_EVALUATION_-_EXPERIENCE_QUESTIONNAIRE.docx | DOCX document | |
| ATTACHMENT_C_-_WAGE_DETERMINATION_MI36.txt | TXT text file | |
| ATTACHMENT_B_-_PLANS_&_DRAWINGS.pdf | ||
| ATTACHMENT_A_-_STATEMENT_OF_WORK.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it.