Attachment 1_Price Schedule and SOW - NWS Janitorial Services.doc
DOC document 139 KB Posted
- Attached to
- Janitorial Services for Edinburg, TX
- Solicitation number
- 124PSA27Q0037
About this file
This is a Price Schedule and Statement of Work for janitorial services at the USDA Animal and Plant Health Inspection Service (APHIS) New World Screwworm (NWS) Dispersal Facility in Edinburg, Texas. The contract requires comprehensive janitorial and custodial services for Building 6101 (2,410 square feet), including the administrative offices, multi-purpose space, three restrooms, mother's room, and Quality Control laboratory. Services must be provided daily, seven days per week, between 7:30 a.m. and 3:00 p.m., with no work on federal holidays without prior contracting officer approval. The contract period begins 14 calendar days after the effective date and continues for 12 months.
The contractor must provide all labor, supervision, equipment, tools, materials, and supplies necessary to maintain janitorial standards, including daily trash collection, dusting, sweeping, mopping, restroom cleaning and disinfection, breakroom maintenance, carpet vacuuming, window cleaning (weekly for interior and exterior), and semi-annual carpet shampooing and floor refinishing. The government provides custodial cleaning products, trash containers, keys and security access codes, and utilities. The contractor must supply all other materials, equipment (including ladders and vacuum cleaners), and labor. All pricing must include direct costs (salaries, fringe benefits, taxes, insurance, materials, equipment), indirect costs, overhead, and profit. A supervisor designated as key personnel must be able to read, write, speak, and understand English with full authority to act for the contractor. All contractor employees require a favorable background investigation prior to starting work, including compliance with USDA personnel security requirements, identity verification, and E-Verify processing. The Service Contract Act applies, requiring appropriate wage determination and notification of any increases within 30 days of receiving a new wage determination.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C04_CSS_Commerical Products and Services_NWS Janitorial.docx | DOCX document | |
| Attachment 2_SF 1449 124PSA27Q0037.pdf | ||
| Attachment 3_SAM-Hidalgo County SCA.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2: Price Schedule and Statement of Work
1.0 Price Schedule
The Contractor is responsible for ensuring completeness of quotations. The Government may evaluate solely on the information provided in the quotation. Quotations that include additional terms may be excluded from consideration. Alternate Pricing Schedules will not be considered. Quotations must include a price for all items in the solicitation to be eligible for award.
Contractor shall furnish all the needed personnel, supervision, transportation, material, equipment, services as described in the statement of work, to perform the required maintenance for the USDA, APHIS, NWS Administrative Offices and Lab located in Edinburg, TX. All Pricing to including but not limited to: all direct costs, such as salaries, fringe benefits, licenses, taxes, insurance costs, materials, supplies and equipment, start‑up costs, indirect costs, overhead, general and administrative expense, profit, insurance, transportation, and training.
Contract Period: Beginning 14 calendar days after the effective date of the contract and continuing for 12 months
Item Description of Service Quantity Unit Unit Price Total Amount
0001 Janitorial services in accordance 12 Month $ __________ $ __________ with the statement of work
TOTAL $________________________
1.1 Schedule Notes
· Per FAR 52.222-41 the Service Contract Act applies to this contract. Contractors may be requested to provide proof that all contract employees are paid appropriately.
If the option period is exercised on the contract, each year a new wage determination will be obtained and provided to the contractor with the modification to exercise the option. In accordance with FAR 52.222-43, the contractor shall notify the contracting officer of any increase claimed under this clause within 30 days after receiving a new wage determination unless this notification period is extended in writing by the contracting officer.
SECTION 1. Statement of Work
1.0 PROJECT: NWS – Janitorial Cleaning Services Contract
2.0 LOCATION: U.S. Department of Agriculture (USDA), Animal and Plant Health Inspection Service (APHIS), Plant Protection Quarantine (PPQ), Designated Serviced Buildings.
New World Screwworm Dispersal Facility
22675 N. Moorefield Rd.
Edinburg, TX 78541 Building 6101 – NWS Administrative Offices and Lab
3.0 SCOPE OF WORK: The Contractor shall provide all labor, equipment, tools, supervision and other items or services necessary to perform janitorial/custodial services as defined in this Statement of Work (SOW).
4.0 HOURS OF OPERATION: New World Screwworm Dispersal Facility hours of operation are Sunday through Saturday (7day a week, 24HRs a day). Work will not be performed on Federal holidays without prior approval of the Contracting Officer (CO).
5.0 SUPERVISORY OF PERSONNEL: The Contractor shall designate a supervisor who shall be responsible for maintaining satisfactory standards of employee competency, conduct, appearance, and integrity, and shall be responsible for the performance of work. The supervisor and/or alternate shall be designated as key personnel and both be able to read, write, speak, and understand English, and shall have full authority to act for the Contractor. The Contracting Officer may, in writing, require the Contractor to remove from the workplace any employee who the Contracting Officer deems incompetent, careless, or otherwise objectionable, or for theft, possession and/or removal of materials, supplies, equipment or Government owned property. No persons not employed by the contractor will be allowed on the premises during the performance of duties. The USDA Offices are non-smoking buildings. The Contractor shall enssure his/her employees do not smoke inside the buildings and only in designated areas if available.
6.0 SPECIFIC TASKS:
Daily Requirements:
· Collect trash from all receptacles and deposit in the nearest outside trash collection container. Liners shall be replaced in receptacles free of dirt, residue, soil, and odor.
· Light dusting of all surfaces (desks, tabletops, counters, printers, etc.), without disturbing any paperwork on desks.
· Sweep and mop entrances, lobbies, corridors, hallways, vestibules, restrooms, breakrooms, and spot-sweep offices. Wet areas shall be marked to alert others of slippery surfaces.
· Clean and disinfect restrooms and shower areas, including all fixtures such as toilet bowls, urinals, sinks, faucets, showers, floor drains, and dispensers. Refill dispensers with products supplied by the government agency. The fixtures shall be free of scale, dirt, stains, streaks, residues, rust, scum, debris, and odors. Sweep and mop floors.
· Breakroom cleaning shall include sink, faucet and accessible countertop areas. The fixtures shall be free of scale, dirt, stains, streaks, residues, rust, scum, debris, and odors. Clean and polish drinking fountains. Sweep and mop floors.
· Vacuum all carpeted areas to remove all dirt, debris, and soil from all accessible areas such as corners, carpet edges along walls and furniture, and under furniture such as tables, chairs, and desks.
6.1 Restrooms: Shall be cleaned with a disinfectant cleaner. Fixtures, metal chrome surfaces, doorplates, water closets, urinals, washbasins, shower stalls, mirrors, shelving, and dispensers shall maintain a high level of luster, if applicable, and be free of dust, mold, mildew, streaks, rust, and encrustation. Urinals/bowls shall be cleaned as far into the trap as possible and under the inside rim. Removal of stains with soap grit or grit cake is allowed; however, the use of toilet bowl cleaners, acids, or strong alkalis which tend to damage glaze shall not be allowed. Cleaning shall include the seat, interior/exterior of bowl/urinal, flush valve, and polishing pipe. Maintain traps free from odor. Partitions, doors, vents, sills, and walls shall be free of dust, dirt, and graffiti. The full surface area of all stall partitions, doors, and waste receptacles shall be damp wiped utilizing a multipurpose (disinfectant-deodorizer) cleaner. Restroom supplies, including paper towels, toilet paper, and liquid hand soap, shall be replenished as needed to always maintain an adequate supply. Restrooms shall be free of discarded material and waste receptacles shall be emptied. Trash shall be collected and put into government provided dumpster. Waste receptacles shall be lined and kept free of trash, dirt, stains, and debris. Flooring, base molding, and walls shall be free of dirt, debris, all types of marks, and foreign matter, damp mopped, and washed as the only method of wet. cleaning, using disinfectant cleaner. Fixtures shall be free of smudges, marks, spots, or unsightly discoloration. Toilet bowls and urinals shall be de-scaled, and the entire surface shall be free from streaks, stains, scale, scum, urine deposits, and rust stains. Floors shall be free of visible loose dirt or streaks, scuff marks, heel marks, other stains and discoloration, and mop strings. Corners, crevices, moldings, and ledges shall be free of all dust and dirt. The least amount of water, soap solution, or water cleaner solution required to remove dirt and rinse floors shall be used. Flooding of floors shall be always avoided. Surfaces shall be left dry. Sufficient supplies shall be provided to meet usage.
6.2 Office spaces: Shall be free of obvious surface dust, dirt, debris, carpet stains, (with the exception of current/existing stains), trash, streaks, and smudges, and present an overall appearance of cleanliness. Horizontal surfaces less than 70 inches high will be free of obvious dust, dirt, oil spots, or smudged surfaces. Desks with papers, computers and keyboards will not be dusted. (The Contractor shall prohibit his/her employees from disturbing papers on desks, opening desk drawers or cabinets, or using office equipment provided for official Government use). Trash shall be collected from work areas and put into government provided dumpster. Trash containers shall be lined and kept relatively free of trash, dirt, stains, and debris. Molding shall be free of dirt, debris, all types of marks, and foreign matter. Carpets and rugs shall be free of obvious removable spots, stains, soiled traffic pattern, dirt, debris, gum, and crusted material. Vacuuming and spot cleaning will be done at a frequency that will protect the integrity of the carpet and prolong wear, typically two times a week. There are to be no areas of deterioration or fuzzing to the carpet and rug because of harsh brushing or scrubbing. Cleaned area of carpets and rugs should reasonably blend with surrounding carpet. Carpets shall be dried within 24 hours to prevent mold growth. All floors without carpet will be free of debris, grime, and grease from the floor surface. Mop and mop bucket will be clean and stored appropriately for reuse. (Office space includes mini blinds and vertical blinds) Furniture and blinds shall be free of visible dust and trash cans shall be emptied. Carpeted areas and molding shall be clean and free of dust balls, visible dirt, and other debris. Non carpeted floor area shall be free of debris, grime, and grease.
6.3 Main lobby, entrance ways, porches, access walks, and hallways: shall be free of obvious surface dust, dirt, debris, carpet stains, trash, streaks, and smudges, and present an overall appearance of cleanliness. Horizontal surfaces less than 70 inches will be free of obvious dust, dirt, oil spots, or smudged. surfaces. Assure that walls, baseboards, and other surfaces remain free of spots, residue, and marks. Wood doors and other wood surfaces shall be free of obvious dirt, stains, and streaks. Metal doorknobs, push bars, thresholds, kick plates, railings, and other metal surfaces shall be free of obvious dirt, stains, and streaks. Counters, railings, grilles, fire apparatus, doors, corners, crevices, moldings, and ledges within approximately 70 inches from the floor shall be dusted. Carpets and rugs shall be free of obvious removable spots, stains, soiled-traffic patterns, dirt, debris, gum, and crusted material. Molding shall be free of dirt, debris, all types of marks, and foreign matter. Vacuuming will be done at a frequency that will protect the integrity of the carpet and prolong wear, typically two times a week. There are to be no areas of deterioration of fuzzing to the carpet and rug because of harsh brushing or scrubbing. Cleaned area of carpets and rugs should reasonably blend with surrounding carpet. Carpets shall be dried within 24 hours to prevent mold growth. Trash shall be collected and put into government provided dumpster. Trash containers shall be lined and kept relatively free of trash, dirt, stains, debris, and odors. Interior and exterior windows/glass will be clean and free of obvious dirt, dust, grime, streaks, cloudiness, and smudges. Surrounding and adjacent areas shall be free of standing water, drips, or watermarks. Outside ashtrays and walkway shall be free of accumulated butts.
Furniture shall be free of visible dust and smudges and trash cans shall be emptied twice weekly. Corners, crevices, moldings, and ledges shall be free of all dust. Carpets shall be vacuum cleaned and free of dust balls, dirt, and other debris. All glass shall be clean and free of dirt, grime, dust, streaks, watermarks, and spots and shall not be cloudy. Thresholds shall be clean and free of oils, grease, dirt, and grime. Washed glass shall be clean and free of dirt, grime, streaks, and excessive moisture and shall not be cloudy. Window sashes, sills, woodwork, and other surrounding interior glass shall be wiped free of drippings and other watermarks.
6.4 Drinking fountains: Shall be free of dirt, stains, watermarks, and all other debris or encrustation. Drinking fountain will be sanitized and present a luster appearance. The stainless-steel surface shall be clean and bright, and free of dust spots, stains, and streaks. Drinking fountain shall be kept free of trash, ink, coffee grounds, etc., and nozzles free from encrustation. There shall be no mineral or calcium buildup on bubbler.
6.5 High cleaning surfaces above 70 inches: Shall be cleaned free of obvious dust and cobwebs monthly. This does not include removal of vents, tiles, or fixtures for accomplish high cleaning.
6.6 “Kitchen” area and Utility Sink: Shall be free of obvious dirt debris and extraneous matter. Trash shall be collected daily and put into government provided dumpster. Trash containers shall be lined and kept relatively free of trash, dirt, stains, and debris. Counter and sink surfaces shall be cleaned twice a week with a disinfectant cleaner. Surfaces shall maintain a high level of luster, if applicable, and be free of dust, mold, mildew, streaks, rust, and encrustation. Molding shall be free of dirt, debris, all types of marks, and foreign matter. Flooring shall be free of dirt, debris, and foreign matter, damp mopped as the only method of wet cleaning, using disinfectant cleaner.
6.7 Carpet Cleaning and Floor Surfaces: Shall be performed at a frequency that will protect the integrity of the carpet and prolong wear, typically twice yearly once in the spring, and once in the fall. All carpet areas shall be shampooed with a commercial machine leaving them free of obvious removable spots, stains, soiled traffic pattern, dirt, debris, gum, and crusted material. There are to be no areas of deterioration or fuzzing to the carpet and rug because of harsh brushing or scrubbing. Cleaned area of carpets and rugs should reasonably blend with surrounding carpet. Carpets shall be dried within 24 hours to prevent mold growth.
Non-carpet areas shall be scrubbed and completely removed of old finish, taking care to not splash or mar furniture, baseboards, or walls during process. Application of self-polish finish shall be applied to non-carpeted floors per common industrial standards.
6.8 Exterior and Interior Window Cleaning: Shall be performed weekly to maintain windows clear form streaks, film, stains, and mineral deposits, for exterior and interior. To include storm doors, glass doors, and storm windows. Windows sashes, sills, and surrounding woodwork shall be left clear of oblivious drippings or water marks.
6.9 Inspections: The Government will inspect office space on a random basis. The Contractor shall correct any performance deficiency within one day of notification by the COR.
6.10 Government Furnished Property: The Government shall provide:
· Keys and security access codes to the gates and building.
· A janitor closet, as space is available in the building duty station for the storage of an inventory of supplies and equipment.
· Containers outside the building for disposal of trash.
· Electricity and water for required activities related to the contract only.
· Custodial cleaning products, including cleaning supplies, toilet paper, paper towels, hand soap, restroom deodorizers and plastic trash bags for the various trash cans/bins.
6.11 Other Requirements: The Contractor shall provide all other supervision, labor, materials, supplies, and equipment required (to include ladder and vacuum cleaner).
· The Contractor shall have established, experienced janitorial staff prior to contract award.
· The Contractor shall be directly responsible for instructing employees in utility conservation practices.
· Mechanical equipment controls for heating, ventilation, and air conditioning systems shall not be adjusted by Contractor employees.
· Lights shall be used only in areas at the time when work is being performed.
· Water faucets or valves shall be turned off after the required usage is complete.
· Windows shall be closed, and lights and fans turned off when not in use.
· Government telephones shall not be used.
· The Contractor shall notify the COR whenever a building deficiency is identified (e.g., chemical spill, leaking pipe, stopped up sink, power outage, doors or other equipment that appear to be working improperly) and post as out of order.
· Ensure that the janitor closet is kept clean, free of unpleasant smells, and neat and orderly always.
· Ensure that all articles of personal or monetary value found by the Contractor’s employees are turned into the COR.
· Secure the building upon completion of work and close and lock entry gates.
· Mops and brooms must be left clean and mop heads washed to avoid smell and mildew.
· Vacuum cleaners with bags or containers must be cleaned/emptied out at the end of the day before the next shift or before starting a new day.
· The Government will not be responsible in any way for damage or loss of parts or equipment to the Contractors furnished supplies.
6.12 Buildings to be Serviced, Frequency, and Hours:
· NWS Dispersal Facility, Bldg. 6101 – 2,410 SF
· Services shall be provided daily Sunday thru Saturday (7 days a week), between 7:30 and 3:00 p.m. (the two front offices, multi-purpose space, 3 restrooms, mother’s room, and the Quality Control laboratory.)
6.13 Safety and Security Requirements:
a. In accordance with the USDA regulations, a Background Investigation is required prior to starting work under this contract, as well as maintaining it throughout the duration of the contract. Prior to start of work, the CONTRACTOR shall provide only fully qualified and properly cleared employees for the work to be performed under this SOW. The contractor shall, through their own internal background investigation protocol and preemployment investigation, ensure that each employee submitted for a background investigation is reasonably expected to receive a favorable adjudication of their respective investigations and training.
b. The USDA, APHIS will pay for the required background investigations. The government shall have and exercise full and complete control over granting, denying, withholding, or termination the background investigation clearance for employees.
c. All contractor personnel that will have access to the APHIS facilities will be required to have a Background Investigation (BI) with no less than favorably adjudicated returned results. Once approved and working at the facilities, contractor personnel shall not be removed or diverted from the site without prior notification to the designated COR. The COR will work with HR Classification to determine the level of background investigation for those prime and subcontractor employees consistent with those position sensitivity designations in the Homeland Security Presidential Directive (HSPD) 12. The level of background investigation required will depend upon the work of the position. It is estimated the type of BI’s required for the various personnel will be one of the following: National Agency Check with Inquiries (NACI), Minimum Background Investigation (MBI), or Limited Background Investigation (LBI) either a Public Trust, High Risk or a Public Trust, Moderate Risk – Minimum Background Investigation. The APHIS Security staff will advise the contractor on the appropriate type of BI required under this contract.
d. The contractor shall not employ persons for work on this contract if such employee is considered by the contracting officer to be a potential threat to health, safety, general well-being or operational mission of USDA and its employees. If the contracting officer finds a prospective employee to be unsuitable for his or her assigned duties, the contractor will be advised immediately that such employee cannot continue to work or be assigned to work under the contract.
(1) Contractors shall comply with the personal identity verification (PIV) policies and procedures established by the AGAR Advisory No. 81, Revision 03 dated July 19, 2010 – Common Identification Standard for Contractors. In addition, procedures to be followed by contractors and contractor employees are specified in the Departmental Regulation and Departmental Manual (DM) 4620- 002. Copies can be downloaded from the website at http://hspd12.usda.gov
(2) All applicable contractor employees requiring routine, long term (the aggregate of 6 months or more) physical access to Federally controlled facilities or routine access to Federally controlled information systems must go through the identify proofing, registration, and E-Verify process, and have a successful background investigation conducted by OPM. The level of investigation required is dependent on the duties and may require a low-risk non-sensitive National Agency Check with (Written) Inquiries, an Office of Personnel Management (OPM) Public Trust or an OPM National Security background investigation to serve on the contract. E-Verify is an electronic system which checks employee information obtained from the Employment Eligibility Verification form (I-9 form) against records maintained by both the Department of Homeland Security (DHS) and the Social Security Administration (SSA). If the information input matches the DHS and SSA records, an ‘employment authorized’ message will be received. However, any discrepancy between the information input and the records at DHS and SSA will result in an alert being issued. The alert is called a Notice of Tentative Non-Confirmation (TNC) and further action is required. All background investigations or clearances must be done one week prior to commencing work. Where this is not practical and the prime or subcontractor requires intermittent access to federally controlled facilities or are under the aggregate 180-day limit, a temporary guest ID badge will be issued and/or such laborer may be under constant supervision and their access to areas or data may be more restricted. Laborers who will NOT have routine unaccompanied physical access to a Federally controlled facility and/or routine unaccompanied access to a Federally Controlled information system may be excluded from coverage by AGAR Advisory 81 based on the Linc Pass Distribution Risk Assessment. The Linc Pass Distribution Risk Assessment will be conducted by a USDA Sponsor for laborer’s (Contracting Officer’s Representative, or other Government designated program/project officers) as part of the PIV II registration, identity proofing, and credential issuance procedures. Examples of probable exclusion are couriers, express mail and package or other delivery persons.
(3) The Contractor shall provide to the USDA PIV Sponsor and the Personnel Security Specialist listed below. A list of all contractor and subcontractor employees full name, job title, employer (prime or subcontractor), contract number, performance period and/or the days employee is expected to be on-site for base year and each period of performance, if applicable, and information on OPM’s background investigation or clearance conducted by the prime or subcontractor and that contractor employees pass the background check.
(4) The Contractor shall take full responsibility to ensure that prime and subcontractor employees who require routine, long-term physical access to federally controlled facilities and logical access to Federally controlled information systems except for "national security systems" as defined by 44 U.S.C. 3542(b)(2), are required to complete and submit HRO 1197, Contractor Supplement and the AD-1197, Request for USDA Identification (ID) Badge, along with copies of two identity source documents (one being a photo ID) and two completed fingerprint cards (FD-258 attached), to the following. You can obtain these forms and further guidance from the Personnel Security Specialist who oversees the investigation process for contractors:
USDA, APHIS, MRPBS, HRD
Attn: Security Specialist - Contractors
250 Marquette Ave., Suite 410
Minneapolis, MN 55401
Phone: (612) 336-3294
(5) The Security Specialist will validate the level of background investigation required of the employee’s position and initiate them into OPM’s secure on-line e-QIP portal and will provide further instructions by means of email for completing the electronic questionnaire.
(6) For further information and reference on the USDA personnel security requirements please see the document entitled Agar Advisory 81 entitled “Common Identification Standard for Contractors” at http://www.dm.usda.gov/pdsd/bulletin04-02.pdf
6.14 Key Control: The Contractor will be issued keys and/or security access codes by the Government for office access. No keys shall be duplicated unless authorized in writing by the COR. The supervisor shall issue keys to Contractor employees and be responsible for their return.
The Contractor shall report the occurrence of a lost key immediately to the COR. The Contractor shall prohibit the use of keys and access codes issued by the Government by any persons other than the Contractor’s employees. The Contractor’s employees shall prohibit entrance to the building by anyone other than Contract employees engaged in the performance of contract related work.
6.15 Employee Conduct: All work under this contract shall be performed in a skillful and workman like manner.
The Contracting Officer may, in writing, require the Contractor to remove from the work any employee the Contracting Officer deems incompetent, careless, or otherwise objectionable, or for theft, possession and/or removal of materials, supplies, equipment, or any Government-owned property.
The Contractor shall prohibit his/her employees from disturbing papers on desks, opening desk drawers or cabinets, or using telephones or office equipment provided for official Government use.
The Contractor will not be allowed to have any persons (family members or otherwise) on the premises to either work or accompany the Contractor or his/her employees during any performance of the contract.
7.0
PROJECT CONTACT PERSONS
USDA, APHIS, VS, NWS
Edgar Cruz Gutierrez
Supervisory Veterinary Medical Officer
22675 N. Moorefield Rd Building 6101
Edinburg, TX 78541
Work Cell: (956) 359-8018
Email: edgar.cruzgutierrez@usda.gov
Ryuji Brumbley
Supvr. Facility Operations Specialist
22675 N. Moorefield Rd
Building 6101
Edinburg, TX 78541
Work Cell: TBD Email: Ryuji.Brumley@usda.gov
8.0 Facility Security and Safety Requirements
In addition to this SOW, Moore Air Base is a restricted facility.
· Work Hours are Monday through Friday from 07:00 AM to 15:30 PM. All work outside of the mentioned days and hours shall be approved by the Facilities Maintenance Manager and Security in writing, prior to entering the campus. This includes work during Federal holidays.
· If some of this work will be required working after 3:30, the Contractor is to provide a schedule for those days to coordinate with the Facilities Maintenance Manager.
· All Contractors shall have a valid picture identification such as a driver’s license or a State identification card.
· All vehicles shall have proper insurance and registration for entering the facility.
· All Contractors working at the facility shall remain in the project site under the supervision of a qualified job site superintendent. Anyone found outside of the designated work area will be removed from the facility and not allowed to return.
· No guns, firearms, ammunition and/or weapons of any kind are permitted on site, regardless of the permitting authority of where the item(s) is stored, secured, or carried.
File details come from the government source that posted it. Updated .