Exhibit_A_Brandon.doc
DOC document 52 KB Posted
- Attached to
- Roofing Federal contract opportunity
- Solicitation number
- 12-4870-18-R-0001
About this file
SOW Brandon
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Exhibit_B_GPVC.doc | DOC document | |
| Exhibit_C_Wage_Determionation_Trigg_CTY.docx | DOCX document | |
| 12487018R0001_GPVC_and_Brandon_roof.pdf | ||
| Exhibit_D_Wage_Deterimination_for_Stewart_CTY.docx | DOCX document | |
| Attachment_Exhibit_E_Past_Performance.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Brandon Activity Building Roof Replacement
PART 1
GENERAL
1.1 SCOPE OF WORK
The Contractor shall provide a proposal for the repair or replacement of the Brandon Spring Activity building.
1.2
LOCATION
The project is located at the Brandon Springs Group Camp at Land Between The Lakes National Recreation Area, Golden Pond, KY 42211.
1.2 CRITERIA FOR ROOF REPAIR
Contractor shall provide recommendation and estimate to repair existing metal roof at the Brandon Springs Activity Building A. Replace or seal existing fasteners
B. Remove all rust or prime with a rust inhibitive primer.
C. Apply base coat and top coat over metal roof surface.
D. Contractor may propose additional criteria.
1.3
CRITERIA FOR ROOF REPLACEMENT
A.
Remove existing metal roof and insulation. Debris shall be disposed off of Government Property.
B.
Install new 4 inch vinyl backed insulation.
C.
Install 24 gauge prefinished metal R-Panel
E.
Install new metal fascia, gutters, downspouts, and perimeter edge trims
F.
At chimney, install new metal flashing and new chimney cap.
G.
Contractor may propose additional criteria.
1.4
SUBMITTALS
A.
Contractor shall provide recommendation on roof repairs or replacement.
B.
Submit catalog cuts or brochures, fully describing all materials, and color samples.
1.5
QUALITY ASSURANCE
A.
Sheet Metal Industry Standard: Comply with Sheet Metal and Air Conditioning Contractors National Association (SMACNA) Architectural Sheet Metal Manual.
B.
International Building Code, 2016 1.6
DELIVERY, STORAGE, AND HANDLING
A.
Deliver materials in manufacturer's original, unopened, protective packaging. Comply with manufacturer's recommendations for protection.
1.7 WARRANTY
A. Contractor shall provide warranty information
PART 2
PRODUCTS
Contractor shall provide information on products and materials.
PART 3
EXECUTION
3.1
INSTALLATION
Install metal roofing materials according to manufacturer’s recommendations.
3.2
PROJECT CONDITIONS
A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit asphalt shingle roofing to be performed according to manufacturers’ written instructions and warranty requirements.