Exhibit_A_Brandon.doc

DOC document 52 KB Posted

Attached to
Roofing Federal contract opportunity
Solicitation number
12-4870-18-R-0001
Issued by
Department of Agriculture Forest Service R8-Southern Region

About this file

SOW Brandon

View the file

Other files for this federal contract opportunity

Other files attached to Roofing, newest first.
File Type Posted
Exhibit_B_GPVC.doc DOC document
Exhibit_C_Wage_Determionation_Trigg_CTY.docx DOCX document
12487018R0001_GPVC_and_Brandon_roof.pdf PDF
Exhibit_D_Wage_Deterimination_for_Stewart_CTY.docx DOCX document
Attachment_Exhibit_E_Past_Performance.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Brandon Activity Building Roof Replacement

PART 1

GENERAL

1.1 SCOPE OF WORK

The Contractor shall provide a proposal for the repair or replacement of the Brandon Spring Activity building.

1.2

LOCATION

The project is located at the Brandon Springs Group Camp at Land Between The Lakes National Recreation Area, Golden Pond, KY 42211.

1.2 CRITERIA FOR ROOF REPAIR

Contractor shall provide recommendation and estimate to repair existing metal roof at the Brandon Springs Activity Building A. Replace or seal existing fasteners

B. Remove all rust or prime with a rust inhibitive primer.

C. Apply base coat and top coat over metal roof surface.

D. Contractor may propose additional criteria.

1.3

CRITERIA FOR ROOF REPLACEMENT

A.

Remove existing metal roof and insulation. Debris shall be disposed off of Government Property.

B.

Install new 4 inch vinyl backed insulation.

C.

Install 24 gauge prefinished metal R-Panel

E.

Install new metal fascia, gutters, downspouts, and perimeter edge trims

F.

At chimney, install new metal flashing and new chimney cap.

G.

Contractor may propose additional criteria.

1.4

SUBMITTALS

A.

Contractor shall provide recommendation on roof repairs or replacement.

B.

Submit catalog cuts or brochures, fully describing all materials, and color samples.

1.5

QUALITY ASSURANCE

A.

Sheet Metal Industry Standard: Comply with Sheet Metal and Air Conditioning Contractors National Association (SMACNA) Architectural Sheet Metal Manual.

B.

International Building Code, 2016 1.6

DELIVERY, STORAGE, AND HANDLING

A.

Deliver materials in manufacturer's original, unopened, protective packaging. Comply with manufacturer's recommendations for protection.

1.7 WARRANTY

A. Contractor shall provide warranty information

PART 2

PRODUCTS

Contractor shall provide information on products and materials.

PART 3

EXECUTION

3.1

INSTALLATION

Install metal roofing materials according to manufacturer’s recommendations.

3.2

PROJECT CONDITIONS

A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit asphalt shingle roofing to be performed according to manufacturers’ written instructions and warranty requirements.