12475620R0001 Attachment 2 Statement of Work.docx

DOCX document 17 KB Posted

Attached to
Culvert Replacement, Grays Branch, Cherokee National Forest Federal contract opportunity
Solicitation number
124756
Issued by
Department of Agriculture Forest Service R8-Southern Region

View the file

Other files for this federal contract opportunity

Other files attached to Culvert Replacement, Grays Branch, Cherokee National Forest, newest first.
File Type Posted
12475620R0001 Attachment 5 FSSS.pdf PDF
12475620R0001 Attachment 1 Schedule of Items 28 Apr 2020.docx DOCX document
12475620R0001 Attachment 3 Site Map and Drawings.pdf PDF
12475620R0001 SF 1442.pdf PDF
12475620R0001 Attachment 7 - Experience Questionnaire.pdf PDF
12475620R0001 Attachment 6 DBA.pdf PDF
12475620R0001 SF 1442 Continuation Sheet.pdf PDF
12475620R0001 Attachment 4 Spec List.pdf PDF
12475620R0001 Attachment 8 - Past Performance Questionnaire.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2 Solicitation No. 12475620R0001 Grays Branch Culvert Replacement Cherokee National Forest, Ocoee Ranger District

SECTION C

STATEMENT OF WORK (SOW)

C-1 Description of Work

The Grays Branch Culvert replacement project will replace one undersized culvert with an aquatic organism passage structure. A 19’-0” span x 6’-4” rise x 36’-0” long aluminum arch culvert will be installed on pre-cast concrete modular footings on NFSR 67 over Grays Branch. The work will include simulation of aproximately 111 feet of Grays Branch. Other activities include excavation and disposal of existing 72” x 36’ CMP, segregation of excavated material (stream simulation, suitable, and unsuitable material), disposal of excess fill off site, placement of riprap, recontouring of existing stream bed, and roadway embankment construction.

For specific description of pay items refer to specifications and plans.

C-2 Project Location

The project is located South of Parksville Lake. From the junction of US HWY 64 and US HWY 411 in Ocoee, TN, proceed east on US HWY 64 for 2.5 miles .Turn right onto Cookson Creek Road and proceed for approximately 4.5 miles, crossing into the Cherokee National Forest and the past the point where the pavement ends and the road becomes a gravel National Forest Service Road, to a 5-way intersection known locally as the “Turkey Foot”. Take a hard right onto NFSR 67 (Grays Branch Road) and proceed approximately 1.0 miles to the project location.

C-3 Applicable Specifications (Road Projects)

Standard and Supplemental Specifications for FP-14 shown in the specification listing contained in the attachments are applicable to this contract. All specifications not included in the specification listing but referenced by listed specifications, are applicable. The Supplemental Specifications shown on the specification list are physically attached.