General Notes

1. 20401: Site preparation shall include all work necessary to prepare the subgrade for placement of the macadam base.

this includes but is not limited to excavation, end haul of waste, shaping the subgrade, watering, & compaction. All other incidental items for project completion shall also be factored into this line item i.e. traffic control, erosion control, etc...

2. 30102: This line item shall include all work, labor, and equipment necessary to furnish and place the macadam base course in accordance with plans & specifications to include watering & compaction.

3. 40305: This line item shall include all work, labor, and equipment necessary to place the SCDOT surface course mix. Type "B" has been specified as a minimum standard.

The contractor may use Type "A" if that is what the local plant is currently producing to eliminate a set-up charge for the small volume of paving on this project.

4. 41102: Prime coat has been included as a pay item on this project and is a requirement.

5. 62502: Utilize a seed mix for the attached local specification based on the appropriate season.

6. 63401: Temporary edge striping is not a project requirement.

The contractor shall apply the permanent edge striping 30 days after asphalt placement.

7. Paving Specs & Testing: SCDOT specifications shall be utilized for the SCDOT specified pavement mix. Due to the small volume and areas being paved, the contractor shall be alleviated of requirements for roller patterns and most materials testing. The contractor shall compact the pavement until there is no visual displacement. The contractor shall adhere to temperature requirements in the specifications.

8. FSR 757 Closures: Closures on the first section of road to the private residences shall be no longer than a consecutive

4 hours, with a 2 hour open window between closures.

Closures of this section of road shall be scheduled and coordinated 1 calendar week in advance. The road beyond the residences may be closed for project duration The government must be notified 30 calendar days prior.

9. FSR 795: This road may be closed for project duration. The government must be notified 30 days prior.

AP Hurricane Recovery Project #1 Spot Paving FSR 757 & 795

DRAWING TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture

Forest Service

J M

O R

A N

C

U

S E

R S

J M

O R

A N

B

O X

E

N G

I N

E E

R I N

G

F E

D E

R A

L L

A N

D S

H I G

H W

A Y

P R

O G

R A

M S

F

Y

H

U R

R I C

A N

E

I R

M A

R

E C

O V

E R

Y

P

R O

J E

T

S

U P

P L

E M

E N

T A

P S

P O

T

P

A V

E

F

A

P

S

P O

T

P

A V

E

D

W G

(R08)

Southern Region

AP Hurricane Recovery

Project #1

Spot Paving

FSR 757 & 795

Francis Marion &

Sumter N.F.

ANDREW PICKENS

RANGER DISTRICT

General Notes

10/18/2019

J. MORAN

J. MORAN

L. MUNDO

TBD

G-02

PROJECT LOCATIONS

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text

DRAWING TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture

Forest Service

J M

O R

A N

U

S E

R S

J M

O R

A N

B

O X

E

N G

I N

E E

R I N

G

F E

D E

R A

L L

A N

D S

H I G

H W

A Y

P R

O G

R A

M S

F

Y

H

U R

R I C

A N

E

I R

C

O V

E R

Y

P

R O

J E

U P

P L

E M

E N

T A

P S

P O

T

P

A V

E

F

A

P

S

P O

T

P

A V

E

D

W G

(R08)

Southern Region

AP Hurricane Recovery

Project #1

Spot Paving

FSR 757 & 795

Francis Marion &

Sumter N.F.

ANDREW PICKENS

RANGER DISTRICT

Estimate of

Quantities &

Work List

10/18/2019

J. MORAN

J. MORAN

L. MUNDO

TBD

G-03

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

12.00

Typical

1 1/2

1 1/2

1 1/2

Through Cut

Cut/Fill

Fill

Not to Scale

Seed Disturbed

Areas (Typical)

Seed Disturbed

Areas (Typical)

Seed Disturbed

Areas (Typical)

2.00

12" MIN.

CLEARING WIDTH

V

R

I A

B L

O

D

R A

I N

CROWN

OUTSLOPE

INSLOPE

TYPICAL ROAD PROFILES Typical Lead-Off Ditch

DRAWING TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture

Forest Service

J M

O R

A N

U

S E

R S

J M

O R

A N

B

O X

E

N G

I N

E E

R I N

G

F E

D E

R A

L L

A N

D S

H I G

H W

A Y

P R

O G

R A

M S

F

Y

H

U R

R I C

A N

E

I R

C

O V

E R

Y

P

R O

J E

U P

P L

E M

E N

T A

P S

P O

T

P

A V

E

F

A

P

S

P O

T

P

A V

E

D

W G

(R08)

Southern Region

AP Hurricane Recovery

Project #1

Spot Paving

FSR 757 & 795

Francis Marion &

Sumter N.F.

ANDREW PICKENS

RANGER DISTRICT

Typical Road

Profiles

10/18/2019

J. MORAN

J. MORAN

L. MUNDO

TBD

C-01

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

Seeding

1'

1'

Seeding

4'

O uts lo pe =

21' or 23'

Based on preceding road width

1'

6" lift of macadam base.

2.5" lift SCDOT surface mix (Type B)

3' outside curve widening

Paved

Shoulder

(Typical)

Seeding

1'

1'

Seeding

4'

Cro wn =

18' or 20'

In accordance with these plans

1'

6" lift of macadam base.

2.5" lift SCDOT surface mix (Type B)

Pavement

Edge

Roadway

1' Shoulder

3" Edge

Striping

Tapered macadam base edge "typical".

Detailed Paving Section

Not to Scale

Outside Curve Widening

Not to Scale

Striping Detail

DRAWING TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture

Forest Service

J M

O R

A N

U

S E

R S

J M

O R

A N

B

O X

E

N G

I N

E E

R I N

G

F E

D E

R A

L L

A N

D S

H I G

H W

A Y

P R

O G

R A

M S

F

Y

H

U R

R I C

A N

E

I R

C

O V

E R

Y

P

R O

J E

U P

P L

E M

E N

T A

P S

P O

T

P

A V

E

F

A

P

S

P O

T

P

A V

E

D

W G

(R08)

Southern Region

AP Hurricane Recovery

Project #1

Spot Paving

FSR 757 & 795

Francis Marion &

Sumter N.F.

ANDREW PICKENS

RANGER DISTRICT

Paving Sections &

Striping Detail

10/18/2019

J. MORAN

J. MORAN

L. MUNDO

TBD

C-02

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

FSR 757 Woodall Shoals

Scale 1" = 790'

N

MP 0.01

Install Stop Sign

MP 0.95

End Pave

MP 0.90

Start Pave

20' Pavement Width

MP 2.06

Start Pave

18' pavement width

Curve

Widening

Curve

Widening

DRAWING TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture

Forest Service

J M

O R

A N

U

S E

R S

J M

O R

A N

B

O X

E

N G

I N

E E

R I N

G

F E

D E

R A

L L

A N

D S

H I G

H W

A Y

P R

O G

R A

M S

F

Y

H

U R

R I C

A N

E

I R

C

O V

E R

Y

P

R O

J E

U P

P L

E M

E N

T A

P S

P O

T

P

A V

E

F

A

P

S

P O

T

P

A V

E

D

W G

(R08)

Southern Region

AP Hurricane Recovery

Project #1

Spot Paving

FSR 757 & 795

Francis Marion &

Sumter N.F.

ANDREW PICKENS

RANGER DISTRICT

FSR 757

"Woodall Shoals"

Stations

10/18/2019

J. MORAN

J. MORAN

L. MUNDO

TBD

C-03

MP 2.28

End of Road

End at parking lot entrance.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

F

R

T hr if t's

F er ry

US HWY 76

D e m o e p a v e

E x i s t i n g

A p r o n

FSR 795 Thrifts Ferry Rd

Scale 1" = 510'

Scale 1" = 20'

N

MP 0.00

Demo existing paved apron

Prepare and pave new apron

MP 0.42

Start Paving

MP 0.54

End Paving

Curve

Widening

US 76

N

Note: All asphalt waste to be hauled to the nearest C&D landfill or asphalt recycling center.

DRAWING TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture

Forest Service

J M

O R

A N

U

S E

R S

J M

O R

A N

B

O X

E

N G

I N

E E

R I N

G

F E

D E

R A

L L

A N

D S

H I G

H W

A Y

P R

O G

R A

M S

F

Y

H

U R

R I C

A N

E

I R

C

O V

E R

Y

P

R O

J E

U P

P L

E M

E N

T A

P S

P O

T

P

A V

E

F

A

P

S

P O

T

P

A V

E

D

W G

(R08)

Southern Region

AP Hurricane Recovery

Project #1

Spot Paving

FSR 757 & 795

Francis Marion &

Sumter N.F.

ANDREW PICKENS

RANGER DISTRICT

FSR 795

"Thrift's Ferry"

Stations & Entrance

10/18/2019

J. MORAN

J. MORAN

L. MUNDO

TBD

C-04

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

Sheets and Views
AP Spot Pave 757-795-17x11 EXPANDED
AP Spot Pave 757-795-Sheet 2
AP Spot Pave 757-795-Sheet 3
AP Spot Pave 757-795-Sheet 4
AP Spot Pave 757-795-Sheet 5
AP Spot Pave 757-795-Sheet 6
AP Spot Pave 757-795-Sheet 8
2020-01-29T15:56:53-0500
LUIS MUNDO
2020-02-03T13:20:24-0500
MARTHA STRUHAR

File details come from the government source that posted it. Updated .