Attachment 02 SOW Greenhouse__roof_2020.docx

DOCX document 17 KB Posted

Attached to
USDA Forest Service Southern Research Station Stoneville, MS Roof Glazing Replacement
Solicitation number
12456820Q0022
Issued by

View the file

Other files

File Type Posted
Sign In Sheet.pdf PDF
Amendment 01 SF-30 12456820Q0022.pdf PDF
Attachment 01 Wages.docx DOCX document
Attachment 03 Experience Questionnaire.docx DOCX document
SF-1449 12456820Q0022.pdf PDF
Solicitation Body 12456820Q0022.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12456820Q0022 SRS Stoneville, MS Greenhouse Roof Glazing Statement of Work

Remove and Replace Greenhouse Glazing Southern Hardwoods Laboratory Stoneville, MS

Summary of work

Remove and replace 8mm polycarbonate on four roof slopes and 4 roof vents in the large greenhouse at the Southern Hardwoods Laboratory in Stoneville, MS.

Address:

USDA FS Southern Hardwoods Lab 432 Stoneville Rd.

Stoneville, MS 38776

Work Items

Remove existing 8mm polycarbonate - The contractor will provide materials and equipment to remove existing 8mm polycarbonate on four roof slopes, 24’6” x 45’ each and four roof vents 3’ x 45’ each; and haul away and dispose of all old polycarbonate from government property.

Install new 8mm polycarbonate - The contractor will provide materials and equipment to install new 8mm polycarbonate on four roof slopes, 24’6” x 45’ each and four roof vents 3’ x 45’ each. New roof panels will be 8mm Lexan Thermoclear 15 Twin Wall - clear, rated at 81% light transmission, with a 20-year warranty. No substitutions are allowed. Contractor will be responsible for measuring the four roof slopes and four roof vents for purposes of procuring the new 8mm panels at the proper length and width for accurate and precise installation. Contractor will provide all hardware, fasteners, spacers, bar cap screws, and sealants that may be needed to complete the installation. Contractor will ensure roof panels are installed water-tight, and will ensure water-tight sealing where the new roof panels adjoin the head-house and existing greenhouse roofs.

Any additional charges related to non-routine maintenance and repair shall be presented in advance for approval. Work schedule shall be coordinated with Emile Gardiner, phone (662) 336-4820.

COR: Paula Phillips Email: Paula.Phillips@usda.gov Telephone: 662-336-4831

Attachment 02

File details come from the government source that posted it. Updated .