Attachment 02 SOW 2020-0219_ACM removal specs_Athens.doc
DOC document 11 MB Posted
- Solicitation number
- 12456820Q0012
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 01- SCA Wages.docx | DOCX document | |
| Solicitation Body SRS Athens Asbestos Abatement.docx | DOCX document | |
| SF-1449 12456820Q0012.pdf | ||
| Attachment 03- Abatement Guidelines_adopted from UGA_2013.docx | DOCX document | |
| Attachment 05-AHU Layout from 1962-0424_Athens_SouthBuilding.pdf | ||
| Attachment 06-Experience Questionaire.docx | DOCX document | |
| Attachment 00- SOI.docx | DOCX document | |
| Attachment 04-CERM-USFS_Athens_SouthBuilding_ACMReport-Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12456820Q0012
SRS Athens
Abatement
ATTACHMENT 02
STATEMENT OF WORK
U.S. Department of Agriculture, Forest Service
Southern Research Station Athens, Georgia Facilities Specifications for
Removal of Designated ASBESTOS-CONTAINING MATERIAL General: Complete removal and disposal of approximately 450 SF of ACM consisting of various sizes of Thermal Systems Insulation (TSI) as described below. Removal and disposal shall be accomplished in accordance with all state and federal laws and regulations. See attached Asbestos Abatement Guidelines for reference.
Specific requirements:
Remove Asbestos-Containing Material (ACM) TSI from the heating and chilled water lines, main Air Handling Unit body and return plenum in the Mechanical Room of the South Building. Work on the Air Handling unit shall be limited to the area between the flexible duct connect at the top of the return plenum and the flexible duct connector at the supply air dampers. Asbestos inspection confirmed these are the two primary sources of ACM in this area. ACM in the mechanical room has been effectively encapsulated and does not pose a hazard if left undisturbed. The intent of the project is to permit safe access for replacement of the piping and for inspection and repair of the shell and internal components of the air handler and does not include any work on the remaining duct insulation in the room. Re-insulation of the exposed duct and piping will be addressed under a separate contract once inspection and repair has been completed.
| Report Date/Company |
| Sample ID |
| Location |
| Description |
| Percentage/Type |
| 2010/CERM |
| FSLSB-31 |
| 1st Floor Air Handler Room |
| Pipe Fitting Insulation |
| 5% Chr |
| 2010/CERM |
| FSLSB-32 |
| 1st Floor Air Handler Room |
| Air Handler Insulation |
| 50% Chr |
Associated surfaces will be cleaned of all ACM and mastic and left dust free upon completion. Additional cleaning, preparatory, and post removal specification are included in the attached Guidelines.
Pre-and post-project submittal items listed in section 4 of the attached Guidelines can be addressed in a letter-type offer/completion summary document. Guideline items 4.01- A. 2,4,6,11,12,13,14 will not be required for this project.
Site Information:
Name: SRS Athens South Building General Location:
320 E Green Street
Athens, GA 30602
Description of the Facility: multi-story office and laboratory located on University of Georgia Campus.
Deliverable: Provide all items in attached Asbestos Abatement Guidelines, section 4.02: Project Closeout Submittals.
Schedule: After receiving Notice to Proceed, coordinate onsite work days with Contracting Officer’s Representative (COR) within 10 working days. All onsite work should be completed within a seven day period, and within 30 days after receiving the Notice to Proceed. All Closeout Submittals should be provided within 30 days of site work and prior to submitting invoice.
Work site will generally be available on weekday between 8:00 AM and 5:00 PM, excluding Federal Holidays. Work outside of this general schedule must be requested and coordinated with the COR and site POC a minimum of 10 days in advance.
Figure 1 - AHU return plenum
Figure 2 - AHU body and piping
Figure 3 - Piping connection at AHU coils
Figure 4 - AHU supply dampers