12455020R0003 Attachment 2 Schedule of Items.docx
DOCX document 19 KB Posted
- Solicitation number
- 12455020R0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 1442 12455020R0003.pdf | ||
| 12455020R0003 Attachment 5 Experience Questionaire.docx | DOCX document | |
| 12455020R0003 Attachment 4 Plans Drawings Maps.pdf | ||
| 12455020R0003 Attachment 1 Wage Determination.docx | DOCX document | |
| 12455020R0003 Attachment 3 Specifications.docx | DOCX document | |
| SF 1442 Continued.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12455020R0003 Attachment 2 Schedule of Items Shuler Creek Stream Restoration Tusquitee Ranger District
SCHEDULE OF ITEMS
SHULER CREEK STREAM RESTORATION PROJECT
| Description |
| Measure |
| Quantity |
| Unit |
| Unit Price |
| Totals |
SHULER CREEK STREAM RESTORATION PROJECT
1A. EQUIPMENT & LABOR
| Track hoe w/ hydraulic thumb & operator |
| AQ |
| 80 |
| hours |
| Mobilization - Track hoe |
| LS |
| 1 |
| each |
| Track truck & operator |
| AQ |
| 5 |
| hours |
| Mobilization - Track truck |
| LS |
| 1 |
| each |
1B. EROSION & SEDIMENT CONTROL
| Seed – seed all disturbed area |
| CQ |
| 0.40 |
| acre |
| Matting - Erosion Control COIR-700 |
| AQ |
| 500 |
| linear foot |
1C. MATERIALS
| Boulders delivered to site (48"x24"x24") |
| AQ |
| 610 |
| ton |
| Non-woven geotextile |
| AQ |
| 800 |
| linear foot |
Project Costs:
Any work shown on drawings or in specifications that is not included in bid items is incidental to other items.
Payment will be made on Actual Quantity (AQ) of work performed, for Lump Sum (LS) or “CQ” designating Contract Quantity.