CROATAN_with_Lat_Long.pdf
PDF 219 KB Posted
- Attached to
- USDA FS NFsNC Croatan RD Road Maintenance
- Solicitation number
- 12455019R0011
About this file
Latitude and Longitude information
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF_30_Amendment_2.pdf | ||
| SF_30_Amendment_1.pdf | ||
| SF_1449_Cont.docx | DOCX document | |
| Attachment_5_Experience_Questionaire.docx | DOCX document | |
| Attachment_2_Schedule_of_Items.pdf | ||
| Attachment_7_Typical_and_Detail_Drawings.pdf | ||
| Attachment_4_Specifications_and_SOW.doc | DOC document | |
| Attachment_1_Wage_Determination.docx | DOCX document | |
| SF_1449.pdf | ||
| Attachment_3_Road_Maintenance_Schedule.pdf | ||
| Attachment_6_Croatan_Map.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Road
Number Maintenance Activity (Pay Item) Road Name
811 813
Grading Surfacing Road Name Latitude Longitude
(Miles) (Tons)
120 2.4 90.0 Long Point 34°49'17.94"N 77° 9'0.07"W
121A 1.3 250.0 Farrior Farm 35° 2'45.24"N 77° 4'9.58"W 134 5.4 240.0 Holsten Hunter 34°48'40.52"N 77° 5'34.90"W 146 1.5 180.0 Haywood Landing 34°48'26.14"N 77° 9'45.59"W 175 2.1 330.0 Sanders Branch 34°46'37.36"N 77° 5'37.87"W 177 2.0 110.0 Millis Swamp 34°47'52.75"N 76°56'14.81"W 203 2.1 120.0 Holsten Creek 34°49'44.09"N 77° 9'27.10"W 603 0.7 30.0 Hill Field 34°48'39.13"N 77° 8'21.55"W
3014 2.3 360.0 Riceground Branch 34°45'18.06"N 77° 4'2.34"W 132 1.5 90.0 Pinecliff Recreation 34°55'11.53"N 76°48'51.03"W 133 1.4 90.0 Pinecliff Tower 34°55'9.16"N 76°48'47.29"W 152 4.4 360.0 Black Swamp 34°50'50.22"N 77° 7'37.48"W 158 5.2 450.0 Catfish Lake Farm 34°55'35.87"N 77° 5'2.88"W
Total 32.3 2700.0
NOTE* Road mileages are estimates only! Mileage submitted on invoice should be calculated according to contract specifications. Check with District Technical Monitor for beginning and ending points.
Exhibit B - Road Maintenance Schedule
Croatan Ranger District
Spring 2019 Maintenance Period
Surface replacement quantities shown for each individual road in the schedule(s) above are approximate and may be adjusted.
File details come from the government source that posted it.