Attachment_4_Schedule_of_Items.xls
XLS spreadsheet 3 MB Posted
- Attached to
- NFNC Uwharrie National Forest Road Maintenance
- Solicitation number
- 12455019R0002
About this file
Schedule of Items
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Revised_Schedule_of_Items_Mar_22.xls | XLS spreadsheet | |
| Rare_plants_Uwharrie_Road_clearing_grading_2019.xlsx | XLSX spreadsheet | |
| SF_30_Amendment_2.pdf | ||
| Pre-Bid_Meeting_attendees.pdf | ||
| Uwharrie_Prebid_Meeting_Location_(Hunt_Camp).pdf | ||
| SF_30_Amendment_1.pdf | ||
| SF_1442.pdf | ||
| SF_1442_Cont.docx | DOCX document | |
| Attachment_2_Uwharrie_RD_Supplemental_Specifications.pdf | ||
| Attachment_1_Wages.docx | DOCX document | |
| Attachment_6_Accomplishment_Report.docx | DOCX document | |
| Attachment_5_Experience_Questionaire.docx | DOCX document | |
| Attachment_3_Uwharrie_RD_Work_and_Typical_Drawings.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Totals
| Your Company Name: ___________________________________ | ||
| Contact Name: _________________________________________ | ||
| Base Item Pricing | Option Pricing | |
| NFSR 576, Moccasin Creek | $ - 0 | |
| NFSR 553, Dutch John Road | $ - 0 | |
| NFSR 6584, Green Gap Road | $ - 0 | |
| NFSR 555, Cotton Place Road | $ - 0 | |
| NFSR 597, Badin Lake Road | $ - 0 | |
| NFSR 597A, Badin Lake Campground | $ - 0 | |
| NFSR 597B, Cove Road | $ - 0 | |
| Group Camp Loop | $ - 0 | |
| NFSR 544, McLeans Creek Rd | $ - 0 | |
| NFSR 516, Wolf Den Road | $ - 0 | |
| NFSR 6652 | $ - 0 | |
| Option 1 ERFO | $ - 0 | |
| Option 2 NFSR 576, Moccasin Creek | $ - 0 | |
| Option 3 NFSR 553, Dutch John Road | $ - 0 | |
| Option 4: NFSR 6560, Deep Water Trail Road | $ - 0 | |
| Option 5: NFSR 6531, Betty McGees Creek Road | $ - 0 | |
| Option 6: NFSR 6532, Robbins Branch | $ - 0 | |
| Option 7: NFSR 6752 | $ - 0 | |
| Option 8: NFSR 6654, East Morris Camp | $ - 0 | |
| Totals | $ - 0 | $ - 0 |
| Base Items Plus Options | $ - 0 |
Description
| ITEM NO. | DESCRIPTION | METHOD OF MEASURE | UNIT |
| 15702 | Soil erosion (Silt Fence) | AQ | LF |
| 15707 | Wattles | AQ | EA |
| 20101 | Clearing and grubbing, |
disposal of tops and limbs (e)
| logs (e), and stumps (e) | CQ | Acre | ||
| 20301 | Removal of Structure | AQ | EA | |
| 20401b | Roadway excavation, compaction method (e) finishing method (e) | CQ | CY | |
| 20408 | Suitable Borrow Material | CQ | CY | |
| 20411 | Embankment Construction, Compaction Method e, Finishing Method e | CQ | CY | |
| 20419 | Drainage Excavation, | |||
| type Ditch | CQ | LF | ||
| 204.2 | Drainage Excavation, | |||
| type Rolling Dip | AQ | EA | ||
| 25105 | Keyed riprap, class B | AQ | Ton | |
| 301.05 | Subbase, Railroad Ballast Stone | |||
| Compaction Method A | AQ | Ton | ||
| 301.09 | Aggregate Surface Course, |
Grading ABC
| Compaction Method A. | AQ | Ton | ||
| 30307 | Roadway Reconditioning, | |||
| Compaction Method (d) | AQ | MI | ||
| 60201a | 24" Corrugated Metal Pipe Culvert, 14 Gauge, (0.079) | |||
| Aluminized-Steel Type 2 | AQ | LF | ||
| 60201b | 30" Corrugated Metal Pipe Culvert, 14 Gauge, (0.079) | |||
| Aluminized-Steel Type 2 | AQ | LF | ||
| 60203a | 36" Corrugated Metal Pipe, 14 Gauge, (0.79) Aluminized Steel Type 2 | AQ | LF | |
| 60203b | 73"x55" Aluminum Pipe-Arch, 12 Gauge (0.109) | AQ | LF | |
| 60513 | Geotextile Material, Type I-B | AQ | SY | |
| 61901 | Gate Installation | LSQ | EA | |
| 62527 | Seeding, fertilizing, and mulching, hydraulic method | CQ | Acre | |
| 63301 | Permanent Traffic Control Signs | AQ | EA |
&R&D &RPage 1 of 1
SCHEDULE OF ITEMS
Uwharrie Hurricane Road Work
| Contract | Road No. | 576 | ||||
| Road Name | NFSR 576, Moccasin Creek | Length (Miles) | 7.81 | |||
| ITEM NO. | DESCRIPTION | METHOD OF MEASURE | UNIT | 0 | 0 | 0 |
| 20101 | Clearing and grubbing, |
disposal of tops and limbs (e)
| logs (e), and stumps (e) | CQ | Acre | 2.00 | $ - 0 | $ - 0 | ||
| 20401b | Roadway excavation, compaction method (e) finishing method (e) | CQ | CY | 110.00 | $ - 0 | $ - 0 | |
| 20408 | Suitable Borrow Material | CQ | CY | 10.00 | $ - 0 | $ - 0 | |
| 20419 | Drainage Excavation, | ||||||
| type Ditch | CQ | LF | 800.00 | $ - 0 | $ - 0 | ||
| 301.05 | Subbase, Railroad Ballast Stone | ||||||
| Compaction Method A | AQ | Ton | 100.00 | $ - 0 | $ - 0 | ||
| 301.09 | Aggregate Surface Course, |
Grading ABC
| Compaction Method A. | AQ | Ton | 2665.00 | $ - 0 | $ - 0 | ||
| 30307 | Roadway Reconditioning, | ||||||
| Compaction Method (d) | AQ | MI | 7.81 | $ - 0 | $ - 0 | ||
| SUB-TOTAL FOR BASE ROAD: | 576 | $ - 0 |
&R&D
SCHEDULE OF ITEMS
Uwharrie Hurricane Road Work
| Contract | Road No. | 553 | |||||
| Road Name | NFSR 553, Dutch John Road | Length (Miles) | 2.96 | ||||
| ITEM NO. | DESCRIPTION | METHOD OF MEASURE | UNIT | 0 | 0 | 0 | |
| 20301 | Removal of Structure | AQ | EA | 1.00 | $0.00 | $ - 0 | |
| 20401b | Roadway excavation, compaction method (e) finishing method (e) | CQ | CY | 190.00 | $0.00 | $ - 0 | |
| 20408 | Suitable Borrow Material | CQ | CY | 160.00 | $0.00 | $ - 0 | |
| 20419 | Drainage Excavation, | ||||||
| type Ditch | CQ | LF | 20.00 | $0.00 | $ - 0 | ||
| 25105 | Keyed riprap, class B | AQ | Ton | 50.00 | $0.00 | $ - 0 | |
| 301.05 | Subbase, Railroad Ballast Stone | ||||||
| Compaction Method A | AQ | Ton | 190.00 | $0.00 | $ - 0 | ||
| 301.09 | Aggregate Surface Course, |
Grading ABC
| Compaction Method A. | AQ | Ton | 188.00 | $0.00 | $ - 0 | ||
| 30307 | Roadway Reconditioning, | ||||||
| Compaction Method (d) | AQ | MI | 2.96 | $0.00 | $ - 0 | ||
| 60201b | 30" Corrugated Metal Pipe Culvert, 14 Gauge, (0.079) | ||||||
| Aluminized-Steel Type 2 | AQ | LF | 30.00 | $0.00 | $ - 0 | ||
| 60513 | Geotextile Material, Type I-B | AQ | SY | 60.00 | $0.00 | $ - 0 | |
| 63301 | Permanent Traffic Control Signs | AQ | EA | 26.00 | $0.00 | $ - 0 | |
| SUB-TOTAL FOR ROAD: | 553 | $ - 0 |
&R&D
SCHEDULE OF ITEMS
Uwharrie Hurricane Road Work
| Contract | Road No. | 6584 | ||||
| Road Name | NFSR 6584, Green Gap Road | Length (Miles) | 0.938 | |||
| ITEM NO. | DESCRIPTION | METHOD OF MEASURE | UNIT | 0 | 0 | 0 |
| 20101 | Clearing and grubbing, |
disposal of tops and limbs (e)
| logs (e), and stumps (e) | CQ | Acre | 1.0 | $ - 0 | $ - 0 | ||
| 20411 | Embankment Construction, Compaction Method e, Finishing Method e | CQ | CY | 10.0 | $ - 0 | $ - 0 | |
| 20419 | Drainage Excavation, | ||||||
| type Ditch | CQ | LF | 130.0 | $ - 0 | $ - 0 | ||
| 25105 | Keyed riprap, class B | AQ | Ton | 40.0 | $ - 0 | $ - 0 | |
| 301.05 | Subbase, Railroad Ballast Stone | ||||||
| Compaction Method A | AQ | Ton | 240.0 | $ - 0 | $ - 0 | ||
| 30307 | Roadway Reconditioning, | ||||||
| Compaction Method (d) | AQ | MI | 0.938 | $ - 0 | $ - 0 | ||
| SUB-TOTAL FOR ROAD: | 6584 | $ - 0 |
&R&D
SCHEDULE OF ITEMS
Uwharrie Hurricane Road Work
| Contract | Road No. | 555 | ||||
| Road Name | NFSR 555, Cotton Place Road | Length (Miles) | 2.085 | |||
| ITEM NO. | DESCRIPTION | METHOD OF MEASURE | UNIT | 0 | 0 | 0 |
| 15702 | Soil erosion (Silt Fence) | AQ | LF | 50.00 | $ - 0 | $ - 0 |
| 20101 | Clearing and grubbing, |
disposal of tops and limbs (e)
| logs (e), and stumps (e) | CQ | Acre | 1.00 | $ - 0 | $ - 0 | ||
| 20301 | Removal of Structure | AQ | EA | 1.00 | $ - 0 | $ - 0 | |
| 20401b | Roadway excavation, compaction method (e) finishing method (e) | CQ | CY | 80.00 | $ - 0 | $ - 0 | |
| 20419 | Drainage Excavation, | ||||||
| type Ditch | CQ | LF | 440.00 | $ - 0 | $ - 0 | ||
| 25105 | Keyed riprap, class B | AQ | Ton | 60.00 | $ - 0 | $ - 0 | |
| 301.09 | Aggregate Surface Course, |
Grading ABC
| Compaction Method A. | AQ | Ton | 260.00 | $ - 0 | $ - 0 | ||
| 30307 | Roadway Reconditioning, | ||||||
| Compaction Method (d) | AQ | MI | 2.08 | $ - 0 | $ - 0 | ||
| 60203a | 36" Corrugated Metal Pipe, 14 Gauge, (0.79) Aluminized Steel Type 2 | AQ | LF | 36.00 | $ - 0 | $ - 0 | |
| SUB-TOTAL FOR ROAD: | 555 | $ - 0 |
&R&D
SCHEDULE OF ITEMS
Uwharrie Hurricane Road Work
| Contract | Road No. | 597 | |||||
| Road Name | NFSR 597, Badin Lake Road | Length (Miles) | 1.55 | ||||
| ITEM NO. | DESCRIPTION | METHOD OF MEASURE | UNIT | 0 | 0 | 0 | |
| 20301 | Removal of Structure | AQ | EA | 2.00 | $ - 0 | $ - 0 | |
| 20401b | Roadway excavation, compaction method (e) finishing method (e) | CQ | CY | 80.00 | $ - 0 | $ - 0 | |
| 20408 | Suitable Borrow Material | CQ | CY | 220.00 | $ - 0 | $ - 0 | |
| 20419 | Drainage Excavation, | ||||||
| type Ditch | CQ | LF | 200.00 | $ - 0 | $ - 0 | ||
| 301.09 | Aggregate Surface Course, |
Grading ABC
| Compaction Method A. | AQ | Ton | 920.00 | $ - 0 | $ - 0 | ||
| 30307 | Roadway Reconditioning, | ||||||
| Compaction Method (d) | AQ | MI | 4.13 | $ - 0 | $ - 0 | ||
| 60201a | 24" Corrugated Metal Pipe Culvert, 14 Gauge, (0.079) | ||||||
| Aluminized-Steel Type 2 | AQ | LF | 66.00 | $ - 0 | $ - 0 | ||
| SUB-TOTAL FOR ROAD: | 597 | $ - 0 |
&R&D
597A
SCHEDULE OF ITEMS
Uwharrie Hurricane Road Work
| Contract | Road No. | 597A | ||||
| Road Name | NFSR 597A, Badin Lake Campground | Length (Miles) | 0.33 | |||
| ITEM NO. | DESCRIPTION | METHOD OF MEASURE | UNIT | 0 | 0 | 0 |
| 301.09 | Aggregate Surface Course, |
Grading ABC
| Compaction Method A. | AQ | Ton | 100.00 | $ - 0 | $ - 0 | ||
| 30307 | Roadway Reconditioning, | ||||||
| Compaction Method (d) | AQ | MI | 1.22 | $ - 0 | $ - 0 | ||
| SUB-TOTAL FOR ROAD: | 597A | $ - 0 |
&R&D
597B
SCHEDULE OF ITEMS
Uwharrie Hurricane Road Work
| Contract | Road No. | 597B | |||||
| Road Name | NFSR 597B, Cove Road | Length (Miles) | 0.33 | ||||
| ITEM NO. | DESCRIPTION | METHOD OF MEASURE | UNIT | 0 | 0 | 0 | |
| 30307 | Roadway Reconditioning, | ||||||
| Compaction Method (d) | AQ | MI | 0.33 | $ - 0 | $ - 0 | ||
| SUB-TOTAL FOR ROAD: | 597B | $ - 0 |
&R&D
GCL
SCHEDULE OF ITEMS
Uwharrie Hurricane Road Work
| Contract | Road No. | ||||||
| Road Name | Group Camp Loop | Length (Miles) | 0.23 | ||||
| ITEM NO. | DESCRIPTION | METHOD OF MEASURE | UNIT | 0 | 0 | 0 | |
| 20419 | Drainage Excavation, | ||||||
| type Ditch | CQ | LF | 401.00 | $ - 0 | $ - 0 | ||
| 301.09 | Aggregate Surface Course, |
Grading ABC
| Compaction Method A. | AQ | Ton | 300.00 | $ - 0 | $ - 0 | ||
| 30307 | Roadway Reconditioning, | ||||||
| Compaction Method (d) | AQ | MI | 0.23 | $ - 0 | $ - 0 | ||
| SUB-TOTAL FOR ROAD: | 0 | $ - 0 |
&R&D
SCHEDULE OF ITEMS
Uwharrie Hurricane Road Work
| Contract | Road No. | 544 | ||||
| Road Name | NFSR 544, McLeans Creek Rd | Length (Miles) | 2.76 | |||
| ITEM NO. | DESCRIPTION | METHOD OF MEASURE | UNIT | 0 | 0 | 0 |
| 15702 | Soil erosion (Silt Fence) | AQ | LF | 100.00 | $ - 0 | $ - 0 |
| 20101 | Clearing and grubbing, |
disposal of tops and limbs (e)
| logs (e), and stumps (e) | CQ | Acre | 1.00 | $ - 0 | $ - 0 | ||
| 20301 | Removal of Structure | AQ | EA | 1.00 | $ - 0 | $ - 0 | |
| 20401b | Roadway excavation, compaction method (e) finishing method (e) | CQ | CY | 230.00 | $ - 0 | $ - 0 | |
| 20408 | Suitable Borrow Material | CQ | CY | 270.00 | $ - 0 | $ - 0 | |
| 20419 | Drainage Excavation, | ||||||
| type Ditch | CQ | LF | 50.00 | $ - 0 | $ - 0 | ||
| 301.05 | Subbase, Railroad Ballast Stone | ||||||
| Compaction Method A | AQ | Ton | 10.00 | $ - 0 | $ - 0 | ||
| 301.09 | Aggregate Surface Course, |
Grading ABC
| Compaction Method A. | AQ | Ton | 340.00 | $ - 0 | $ - 0 | ||
| 30307 | Roadway Reconditioning, | ||||||
| Compaction Method (d) | AQ | MI | 0.83 | $ - 0 | $ - 0 | ||
| 60201a | 24" Corrugated Metal Pipe Culvert, 14 Gauge, (0.079) | ||||||
| Aluminized-Steel Type 2 | AQ | LF | 52.00 | $ - 0 | $ - 0 | ||
| SUB-TOTAL FOR ROAD: | 544 | $ - 0 |
&R&D
SCHEDULE OF ITEMS
Uwharrie Hurricane Road Work
| Contract | Road No. | 516 | |||||
| Road Name | NFSR 516, Wolf Den Road | Length (Miles) | 1.31 | ||||
| ITEM NO. | DESCRIPTION | METHOD OF MEASURE | UNIT | 0 | 0 | 0 | |
| 301.05 | Subbase, Railroad Ballast Stone | ||||||
| Compaction Method A | AQ | Ton | 140.00 | $ - 0 | $ - 0 | ||
| 301.09 | Aggregate Surface Course, |
Grading ABC
| Compaction Method A. | AQ | Ton | 780.00 | $ - 0 | $ - 0 | ||
| 30307 | Roadway Reconditioning, | ||||||
| Compaction Method (d) | AQ | MI | 1.31 | $ - 0 | $ - 0 | ||
| SUB-TOTAL FOR ROAD: | 516 | $ - 0 |
&R&D
SCHEDULE OF ITEMS
Uwharrie Hurricane Road Work
| Contract | Road No. | 6652 | |||||
| Road Name | NFSR 6652 | Length (Miles) | 1.47 | ||||
| ITEM NO. | DESCRIPTION | METHOD OF MEASURE | UNIT | 0 | 0 | 0 | |
| 301.05 | Subbase, Railroad Ballast Stone | ||||||
| Compaction Method A | AQ | Ton | 80.00 | $ - 0 | $ - 0 | ||
| 301.09 | Aggregate Surface Course, |
Grading ABC
| Compaction Method A. | AQ | Ton | 80.00 | $ - 0 | $ - 0 | ||
| 30307 | Roadway Reconditioning, | ||||||
| Compaction Method (d) | AQ | MI | 1.47 | $ - 0 | $ - 0 | ||
| SUB-TOTAL FOR ROAD: | 6652 | $ - 0 |
&R&D
Option1ERFO
SCHEDULE OF ITEMS
Uwharrie Hurricane Road Work
| Contract | Road No. | |||||
| Road Name | Option 1: ERFO Items | Length (Miles) | ||||
| ITEM NO. | DESCRIPTION | METHOD OF MEASURE | UNIT | 0 | 0 | 0 |
| 301.09 | Aggregate Surface Course, |
Grading ABC
| Compaction Method A. | AQ | Ton | 560.00 | $ - 0 | $ - 0 | ||
| SUB-TOTAL FOR ROAD: | 0 | $ - 0 |
&R&D
Option 2 576 Rock
| Option 2 NFSR 576 Rock | ||||||
| 301.09 | Aggregate Surface Course, Grading ABC Compaction Method A | AQ | Ton | 1560 | $ - 0 | $ - 0 |
| TOTAL FOR OPTION ITEM | $ - 0 |
Option 3 553 Rock
| Option 3 NFSR 553 Rock | ||||||
| 301.09 | Aggregate Surface Course, Grading ABC Compaction Method A | AQ | Ton | 206 | $ - 0 | $ - 0 |
| TOTAL FOR OPTION ITEM | $ - 0 |
Option4NFSR6560
SCHEDULE OF ITEMS
Uwharrie Hurricane Road Work
| Contract | Road No. | 6560 | |||||
| Road Name | Option 4: NFSR 6560, Deep Water Trail Road | Length (Miles) | 0.1 | ||||
| ITEM NO. | DESCRIPTION | METHOD OF MEASURE | UNIT | 0 | 0 | 0 | |
| 20419 | Drainage Excavation, | ||||||
| type Ditch | CQ | LF | 80.00 | $ - 0 | $ - 0 | ||
| 301.09 | Aggregate Surface Course, |
Grading ABC
| Compaction Method A. | AQ | Ton | 50.00 | $ - 0 | $ - 0 | ||
| 30307 | Roadway Reconditioning, | ||||||
| Compaction Method (d) | AQ | MI | 0.10 | $ - 0 | $ - 0 | ||
| SUB-TOTAL FOR ROAD: | 6560 | $ - 0 |
&R&D
Option5NFSR6531
SCHEDULE OF ITEMS
Uwharrie Hurricane Road Work
| Contract | Road No. | 6531 | ||||
| Road Name | Option 5: NFSR 6531, Betty McGees Creek Road | Length (Miles) | 0.08 | |||
| ITEM NO. | DESCRIPTION | METHOD OF MEASURE | UNIT | 0 | 0 | 0 |
| 301.09 | Aggregate Surface Course, |
Grading ABC
| Compaction Method A. | AQ | Ton | 120.00 | $ - 0 | $ - 0 | ||
| 30307 | Roadway Reconditioning, | ||||||
| Compaction Method (d) | AQ | MI | 0.08 | $ - 0 | $ - 0 | ||
| SUB-TOTAL FOR ROAD: | 6531 | $ - 0 |
&R&D
Option6NFSR6532
SCHEDULE OF ITEMS
Uwharrie Hurricane Road Work
| Contract | Road No. | 6532 | ||||
| Road Name | Option 6: NFSR 6532, Robbins Branch | Length (Miles) | 0.64 | |||
| ITEM NO. | DESCRIPTION | METHOD OF MEASURE | UNIT | 0 | 0 | 0 |
| 20301 | Removal of Structure | AQ | EA | 1.00 | $ - 0 | $ - 0 |
| 20401b | Roadway excavation, compaction method (e) finishing method (e) | CQ | CY | 30.00 | $ - 0 | $ - 0 |
| 301.09 | Aggregate Surface Course, |
Grading ABC
| Compaction Method A. | AQ | Ton | 190.00 | $ - 0 | $ - 0 | ||
| 30307 | Roadway Reconditioning, | ||||||
| Compaction Method (d) | AQ | MI | 0.64 | $ - 0 | $ - 0 | ||
| 60201a | 24" Corrugated Metal Pipe Culvert, 14 Gauge, (0.079) | ||||||
| Aluminized-Steel Type 2 | AQ | LF | 26.00 | $ - 0 | $ - 0 | ||
| SUB-TOTAL FOR ROAD: | 6532 | $ - 0 |
&R&D
Option7NFSR6752
SCHEDULE OF ITEMS
Uwharrie Hurricane Road Work
| Contract | Road No. | 6752 | |||||
| Road Name | Option 7: NFSR 6752 | Length (Miles) | 1.08 | ||||
| ITEM NO. | DESCRIPTION | METHOD OF MEASURE | UNIT | 0 | 0 | 0 | |
| 301.05 | Subbase, Railroad Ballast Stone | ||||||
| Compaction Method A | AQ | Ton | 160.00 | $ - 0 | $ - 0 | ||
| 301.09 | Aggregate Surface Course, |
Grading ABC
| Compaction Method A. | AQ | Ton | 240.00 | $ - 0 | $ - 0 | ||
| 30307 | Roadway Reconditioning, | ||||||
| Compaction Method (d) | AQ | MI | 1.08 | $ - 0 | $ - 0 | ||
| SUB-TOTAL FOR ROAD: | 6752 | $ - 0 |
&R&D
Option8NFSR6654
SCHEDULE OF ITEMS
Uwharrie Hurricane Road Work
| Contract | Road No. | 6654 | ||||
| Road Name | Option 8: NFSR 6654, East Morris Camp | Length (Miles) | 0.16 | |||
| ITEM NO. | DESCRIPTION | METHOD OF MEASURE | UNIT | 0 | 0 | 0 |
| 301.09 | Aggregate Surface Course, |
Grading ABC
| Compaction Method A. | AQ | Ton | 20.00 | $ - 0 | $ - 0 | ||
| 30307 | Roadway Reconditioning, | ||||||
| Compaction Method (d) | AQ | MI | 0.16 | $ - 0 | $ - 0 | ||
| SUB-TOTAL FOR ROAD: | 6654 | $ - 0 |
&R&D
File details come from the government source that posted it.