Questions and Answers.pdf
PDF 97 KB Posted
- Attached to
- Grey Towers Historic Terrace and Walkways Preservation Construction, Pennsylvania (GAOA)
- Solicitation number
- 12445526Q0014
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Questions and Answers document for the Grey Towers Historic Terrace and Walkways Restoration project, dated 15 April 2026. The document addresses contractor inquiries regarding four distinct work areas: Star and Diamond Terrace, Marble Court, Finger Bowl, and Stairs by Moat.
For the Star and Diamond Terrace section, responses clarify site logistics including limited access with designated stockpiling areas per drawing L1.01, permission to place a removal container on the asphalt area, and access for skid steer equipment as referenced in Statement of Work 1.4 A and Section 011400. Existing broken stones require replacement unless otherwise noted on drawings or specifications for reuse. Stone breakage during removal is governed by FAR clause 52.236-9, which protects adjacent areas. Regarding stone cleaning, the Statement of Work calls for cleaning despite drawings showing no cleaning requirements, and contractors are directed to refer to the Statement of Work. Required mockups are specified in sections 013300-2.1B, 013300-2.1C, 040140-1.5, and 040513-1.3. For the Marble Court, new pink granite pool coping must be purchased as various existing pieces are broken and require matching; irregular cut black and pink granite setts cannot be salvaged and reused but must be newly purchased per specifications and drawings. Finger Bowl specifications provide interior water feature dimensions (45½" depth, 165" length, 112¼" width) with additional reference materials available through the USDA Forest Service Grey Towers website virtual tour. The contractor bears full responsibility for replacing any stonework broken during dismantling or project execution, including material and labor costs. For the Stairs by Moat area, the missing bluestone bench piece is located on-site directly behind the bench under the hemlock hedge.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Grey Towers Historic Terrace and Walkways Restoration Questions and Answers
15 April 2026
Star and Diamond Terrace
1. What is the designated route for removing debris and bringing in new material?
There is limited access. On drawing L1.01 There are “bubble” call outs for stockpiling materials.
Also, please see Statement of Work 1.4 A and Section 011400 Part 1 General 1.1 A for additional clarification.
2. Are we permitted to park a container on-site for removals?
On drawing L1.01 There are “bubble” call outs for stockpiling materials, the one on asphalt could be used for a container.
3. Is there sufficient access to bring a skid steer to the work area? Statement of Work 1.4 A and Section 011400 Part 1 General 1.1 A for additional clarification.
4. Should existing broken stones be repaired or replaced ? Existing broken stones should be replaced, unless they are called out on the drawings or specifiction to be reused.
5. What is the protocol if a stone is broken during the removal process?
FAR clause 52.236-9, The clause that protects area that are adjacent to the work.
6. Is stone cleaning required?
No cleaning is indicated on the drawings, but a Historic Masonry Cleaning specification is included in the documents. The statement of work (SOW)calls for cleaning, please clear the
SOW
7. Which mockups will be required for this area?
Please see 013300-2.1B, 013300-2.1C, 040140-1.5, 040513-1.3
Marble Court
8. The existing pink granite pool coping is scheduled for replacement. Can this material be salvaged OR reused instead?
No, various pieces of the coping are broken and need to match, so new pink granite is required, per spec & drawings
9. Can the irregular cut black and pink granite setts be salvaged and reused if the mortar is removed from the edges?
No, new should be purchased, per spec & drawings
Finger Bowl
10. Could you provide details on the interior of the water feature? It was covered during our walkthrough.
Depth from center of finger bowl 45 ½” Length from the west to east 165” Width from south to north 112 ¼” Pictures attached to the original email. Also link to website https://www.fs.usda.gov/greytowers, click on Virtual Tour of Grey Towers NHS, then Marble Court & Fingerbowl for accurate video.
11. If a piece of stonework, whether it be historic bluestone or historical architectural elements or the newer granite, is broken while dismantling or during the project, who is responsible for replacing both material & cost incurred?
This contractor is responsible.
Stairs by Moat
12. At the site visit, the bench to be repaired at top left of steps was missing a section. Is this piece on site or will we have to acquire a new piece?
The missing bluestone piece is directly behind the bench, under the hemlock hedge, as stated in the walk through.