About this file
This amendment modifies a federal solicitation for the construction of an overwintering facility. The project involves demolishing the first floor of an existing head house and constructing a new 2576 square foot building atop the foundation to serve as an overwintering facility. The new building will include one air handling unit, one chiller installed on new concrete pads, and interior finishes. The amendment provides additional specifications for special project procedures, traffic coatings, and answers pre-submitted questions from potential offerors. Responses to the solicitation are due by May 25, 2023 at 4:00 PM Eastern Time. The government's cost estimate for the project is between $1,000,000 and $5,000,000.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre-Proposal Meeting Attendees - 12445523R0015.pdf | ||
| RFP 12445523R0015.pdf | ||
| J2 Project Plans.pdf | ||
| J1 DBS WD OH20230075 - Delaware County.pdf | ||
| J3 Project Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1
1. CONTRACT ID CODE
I
PAGE OF PAGES
1 I 1
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
6. ISSUED BY
05/18/2023 CODE 4455 7. ADMINISTERED BY (If other than Item 6) CODE I
USDA-FS CSA EAST 13
1720 PEACHTREE ST NW
STE 876S
ATLANTA GA 30309-2449
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
9A. AMENDMENT OF SOLICITATION NO.
12445523R0015
X
9B. DATED (SEE ITEM 11)
04/26/2023
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
� The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers Dis extended. ra is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. b��Eft���� R-i�Ef0� ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor Dis not Dis required to sign this document and return ______ _ copies to Iha issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including so/icilationlcontracl subject matter where feasible.)
AMENDMENT 0001: The purpose of this amendment is to provide the following:
1. SECTION 01 35 13.16 - SPECIAL PROJECT PROCEDURES
2. SECTION 071800 - TRAFFIC COATINGS
3. QUESTIONS & ANSWERS DOCUMENT
The response date has not been extended and remains to be 05/25/23 by 4:00 p.m. eastern time.
Period of Performance: 06/15/2023 to 06/15/2024
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 1 0A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED
(Signature of person authorized to sign)
Previous edition unusable
CAROL D. NORTHROP
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
05/18/2023
1263PX18004 USDA Delaware Controlled Temperature Overwintering
Facility (DCOWF)
Special Project Procedures 01 35 13.16 Page 1 of 1
SECTION 01 35 13.16 - SPECIAL PROJECT PROCEDURES
PART 1-GENERAL
1.01 PROCEDURES
A. Normal building operating hours are 12 hours a day, 5 days per week with some personnel having access 24 hours per day 7 days per week
C. Contractor is responsible for notifying CO/COTR of work scheduled and listings of employees to be working after normal business hours of 8AM to 5 PM.
D. Contractor’s supplies and materials must be accompanied by MSDS. These sheets are to be given to the owner’s project manager and seek his approval before bringing product into the building. Please note that there may be hazardous materials present in the building. If the contractor finds out about hazardous material presence, bring it to the attention of the Contracting Officer (CO) / Contracting Officer Technical Representative (COTR). Abatement of Asbestos materials is by others.
E. Contractor is prohibited from using odor causing materials objectionable to owner during the normal business hours.
F. Work conducted in the basement area must be approved by COTR prior to start of work. No contract work containing any type of noise will be conducted during normal business hours.
G. Contractor shall be responsible to remove trash and debris daily or more often, depending on need. Owner’s Dumpsters are not permitted for use of construction debris. Contractor must provide dumpsters for construction debris and will be located as directed by CO/COTR.
H. Contractor is responsible for the security of tools and materials in areas that will be accessible to the residents. Materials and tools shall be secured at all times and at the end of a work day in areas that are partially vacated or can be access by residents.
I. Contractor will provide a minimum of 72 hours in advance written notice of possible interruption of utilities. This must be scheduled and approved by CO/COTR. A/E is to be advised of utility interruption requirements when requesting permission from
CO/COTR.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION
Facility (DCOWF)
TRAFFIC COATINGS 07 18 00 Page 1 of 5
SECTION 071800 - TRAFFIC COATINGS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes: Traffic coatings and pavement markings for the following applications:
1. Vehicular traffic.
2. Equipment-room floor.
1.2 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site .
1.3 ACTION SUBMITTALS
A. Product Data: Traffic coatings and pavement markings for the following applications:
1. Vehicular traffic.
2. Equipment-room floor.
B. Samples for Initial Selection: For each type of exposed finish. Provide color samples from MFR's full range for Owner selection.
1.4 CLOSEOUT SUBMITTALS
A. Maintenance Data: For traffic coatings to include in maintenance manuals.
1.5 QUALITY ASSURANCE
A. Installer Qualifications: An entity that employs installers and supervisors who are trained and approved by manufacturer.
1.6 FIELD CONDITIONS
A. Environmental Limitations: Apply traffic coatings within the range of ambient and substrate temperatures recommended in writing by manufacturer. Do not apply traffic coatings to damp or wet substrates, when temperatures are below 40 deg F, when relative humidity exceeds 85 percent, or when temperatures are less than 5 deg F above dew point.
Facility (DCOWF)
TRAFFIC COATINGS 07 18 00 Page 2 of 5
1. Do not apply traffic coatings in snow, rain, fog, or mist, or when such weather conditions are imminent during the application and curing period. Apply only when frost-free conditions occur throughout the depth of substrate.
B. Do not install traffic coating until items that penetrate membrane have been installed.
C. Pavement-Marking Paint: Proceed with pavement marking only on clean, dry surfaces and at a minimum ambient or surface temperature of 40 deg F for oil-based materials 50 deg F for water-based materials, and not exceeding 95 deg F.
1.7 WARRANTY
A. Manufacturer's Warranty: Manufacturer agrees to repair or replace traffic coating that fails in materials or workmanship within specified warranty period.
1. Failures include, but are not limited to, the following:
a. Adhesive or cohesive failures.
b. Abrasion or tearing failures.
c. Surface crazing or spalling.
d. Intrusion of water, oils, gasoline, grease, salt, deicer chemicals, or acids into deck substrate.
2. Warranty Period: Five years from date of Substantial Completion.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Material Compatibility: Provide primers; base coat, intermediate coat, and topcoat; and accessory materials that are compatible with one another and with substrate under conditions of service and application, as demonstrated by manufacturer based on testing and field experience.
2.2 TRAFFIC COATINGS
A. Traffic Coating : Manufacturer's standard, traffic-bearing, seamless, high-solids-content, cold liquid-applied, elastomeric, water-resistant membrane system with integral wearing surface for pedestrian traffic and equipment-room floor service condition; according to
ASTM C957/C957M.
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Advanced Polymer Technology Corp.
b. Euclid Chemical Company (The); a subsidiary of RPM International, Inc.
c. Pecora Corporation.
d. PPG Paints; PPG Industries, Inc.
Facility (DCOWF)
TRAFFIC COATINGS 07 18 00 Page 3 of 5
e. Sherwin-Williams Company (The).
f. Tremco Incorporated.
B. Primer: Liquid primer as recommended in writing for substrate and conditions by traffic-coating manufacturer.
1. Material: Epoxy .
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for maximum moisture content, surface smoothness, and other conditions affecting performance of traffic-coating work.
B. Verify that substrates are visibly dry and free of moisture.
1. Test for moisture according to ASTM D4263.
2. Test for moisture content by measuring with an electronic moisture meter method recommended in writing by traffic-coating manufacturer .
C. Prepare written report, endorsed by Installer, listing conditions detrimental to performance of traffic-coating work.
D. Proceed with installation only after unsatisfactory conditions have been corrected.
1. Begin coating application only after substrate construction and penetrating work have been completed.
2. Begin coating application only after minimum concrete-curing and -drying period recommended in writing by traffic-coating manufacturer has passed and after substrates are dry.
3. Application of coating indicates acceptance of surfaces and conditions.
3.2 PREPARATION
A. Clean and prepare substrates according to ASTM C1127 and manufacturer's written instructions to produce clean, dust-free, dry substrate for traffic-coating application.
Remove projections, fill voids, and seal joints if any, as recommended in writing by traffic-coating manufacturer.
B. Priming: Unless manufacturer recommends in writing against priming, prime substrates according to manufacturer's written instructions.
1. Limit priming to areas that will be covered by traffic-coating material on same day.
Reprime areas exposed for more time than recommended by manufacturer.
Facility (DCOWF)
TRAFFIC COATINGS 07 18 00 Page 4 of 5
C. Schedule preparation work so dust and other contaminants from process do not fall on wet, newly coated surfaces.
D. Mask adjoining surfaces not receiving traffic coatings to prevent overspray, spillage, leaking, and migration of coatings. Prevent traffic-coating materials from entering deck substrate penetrations and clogging weep holes and drains.
E. Concrete Substrates: Mechanically abrade surface to a uniform profile acceptable to manufacturer, according to ASTM D4259. Do not acid etch.
1. Remove grease, oil, paints, and other penetrating contaminants from concrete.
2. Remove concrete fins, ridges, and other projections.
3. Remove laitance, glaze, efflorescence, curing compounds, concrete hardeners, form-release agents, and other incompatible materials that might affect coating adhesion.
4. Remove remaining loose material to provide a sound surface, and clean surfaces according to ASTM D4258.
3.3 TERMINATIONS AND PENETRATIONS
A. Prepare vertical and horizontal surfaces at terminations and penetrations through traffic coatings and at expansion joints, drains, and sleeves according to ASTM C1127 and manufacturer's written instructions.
B. Provide sealant cants at penetrations and at reinforced and nonreinforced, deck-to-wall butt joints.
C. Terminate edges of deck-to-deck expansion joints with preparatory base-coat strip.
D. Install sheet flashings at deck-to-wall expansion and dynamic joints, and bond to deck and wall substrates according to manufacturer's written recommendations.
3.4 JOINT AND CRACK TREATMENT
A. Prepare, treat, rout, and fill joints and cracks in substrates according to ASTM C1127 and manufacturer's written recommendations. Before coating surfaces, remove dust and dirt from joints and cracks according to ASTM D4258.
1. Comply with recommendations in ASTM C1193 for joint-sealant installation.
B. Apply reinforcing strip in traffic-coating system where recommended in writing by traffic-coating manufacturer.
3.5 INSTALLATION OF TRAFFIC COATINGS
A. Apply traffic coating according to ASTM C1127 and manufacturer's written instructions.
Facility (DCOWF)
TRAFFIC COATINGS 07 18 00 Page 5 of 5
B. Apply coats of specified compositions for each type of traffic coating at locations as indicated on Drawings.
C. Verify that wet-film thickness of each coat complies with requirements every 100 sq. ft. .
D. Apply traffic coatings to prepared wall terminations and vertical surfaces to height indicated; omit aggregate on vertical surfaces.
E. Cure traffic coatings. Prevent contamination and damage during coating application and curing.
3.6 INSTALLATION OF PAVEMENT MARKINGS
A. Do not apply pavement-marking paint for striping and other markings until layout, colors, and placement have been verified with Architect and traffic coating has cured.
B. Sweep and clean surface to eliminate loose material and dust.
C. Apply pavement-marking paint with mechanical equipment to produce markings of dimensions indicated with uniform straight edges. Apply at manufacturer's recommended rates for a minimum wet-film thickness of 15-mils.
3.7 PROTECTING AND CLEANING
A. Protect traffic coatings from damage and wear during remainder of construction period.
B. Clean spillage and soiling from adjacent construction using cleaning agents and procedures recommended by manufacturer of affected construction.
END OF SECTION 071800
12445523R0015 - Amendment 0001
Questions & Answers Document
It is recommended for all potential bidders to read the plans and specifications in detail prior to bidding.
Alternates may be considered after the project is awarded. Pricing submitted should be per plan.
1. Weatherproof Basement
a. Answer: Site is to be secured during construction from the public and weather. This is on the contractor. 01 00 00 Page 5 of 10 1.12(B) – describes all openings to be temporarily closed weathertight. General Note AD.110 describes that facility shall be weather tight during construction and that the facility’s contents protected during construction. This is the contractor responsibility.
2. Fire Alarm (AD.110)
a. Answer: Fire Alarm system does NOT need to remain active during construction. Temporary fire protection is the responsibility of the contractor (01 00 00 Page 5 of 10 1.12(F))
3. Elevator Shaft
a. Answer: Typical Detail thru elevator shaft openings to be filled in (6/S0.2).
Elevator is still present in shaft – space under “cart” approx. 3 vertical feet
4. Foam Fastened to Drywall
a. Answer: See Typical Wall Section (1/A.300)
5. Electric Water Heater
a. Answer: Project to be bid per plans & specs. Changes can be proposed during submittal phase, but no guarantees.
6. Piping and Conduit Attached to Basement Ceiling during Foam installation, applies to all conduit (“feeder” conduits included).
a. Answer: General Note 14 Page E-100
7. Unknown Asbestos
a. Answer: Missing Spec section is supplied. Contractors are to verify site prior to bidding. (23 00 00 Page 5 /9 3.04).
8. Fire Hydrant
a. Answer: Water can be used. A meter and backflow preventer must be installed prior to use. This will be for non-potabile water only. All equipment installed must be chlorinated prior to installation.
9. Can the extent of the fire alarm scope be reflected on the electrical drawings? More specifically the first floor (new or relocated device locations).
a. Answer: As stated in general note #13 on E-100, work to be done by licensed fire alarm contractor, this work is included in the bidders scope.
10. Please provide a specification for the traffic coating paint for the interior floors listed on the room finish plan. The exterior painting spec section lists application for steel and iron only, and the interior painting specification only refers to paint used for gypsum board.
a. Answer: Specification Section 071800 titled Traffic Coating is provided.
11. Spec 042200-part 2.2 D light weight pre-faced CMU, the manufacturer’s typically use normal weight aggregate when making these units to be able to maintain a consistent finished color verses light weight aggregate which can product more variance with the consistence of the finished color. Clarify if normal weight aggregate is acceptable.
Similarly sheet S0.1 under masonry construction line #3 calls for Medium weight aggregate contradicting spec 042200, this is not a readily accessible aggregate. Clarify the aggregate requirements for the pre-faced CMU’s.
a. Answer: Normal weight aggregate is acceptable for prefaced CMU’s.
12. Spec 042200-part 2.10 C 1 calls for type S and sheet S0.1 under masonry construction, line #3 calls for type M. Type M is typically used for below grade masonry and is significantly more difficult to remove stains from above grade pre-faced units and can cause color loss due to more aggressive cleaning. Clarify the Type of PCL required for this project.
a. Answer: Type S mortar is acceptable.
13. Sheet A.300/3 clarify this flashing detail depiction as this calls out thru-wall flashing.
Spec 042200-part 3.9 C calls for single wythe pan flashing which is the typical flashing procedures for a single wythe wall.
a. Answer: Flashing shall be as per Detail 3 on sheet A.300.
14. Sheet A300 these wall details call out split faced CMU, sheet A.200 does not indicate a face finish, spec 042200-part 2.2 C Pre-Faced CMU only states standard smooth finish.
Clarify the CMU face finish required for this project? Similarly detail on sheet A300 top of CMU to soffit detail, this would typically be a smooth faced unit to allow proper sealing of the soffit to CMU, clarify the CMU face finish at this location.
a. Answer: Masonry is Pre-Faced CMU with exterior split face and interior smooth face. Top CMU course at the soffit is Pre-Faced CMU with smooth serfaces on exterior and interior.
15. Sheet A.300/3 indicates 4” high poured concrete at the base of wall to existing, sheet S- 200/1 reflects a CMU half high, clarity the base of wall material requirements.
a. Answer: It is 4” high poured concrete.
16. 23 07 13 item 2.04 says “Outdoor ductwork shall be double wall….. ” General note #1 on
M.110 says “Externally insulate all supply, outside and return air….” Also of concern;
coded note #7 on M.110 says “all exterior ductwork shall have weatherproof 22-gauge aluminum jacket cover.” Insulation contractor do not do 22-gauge thickness.
a. Answer: No change.
17. 9. 23 07 13 items 2.02 A and 2.05 both talk about all piping being concealed in “Pipe in Pipe” arrangement. As I understand this application, it does not involve any field installed insulation. Also, of concern; the size of the chilled water piping. Flow says 1 ½” but AHU connection says 4.”
a. Answer: AHU connection is 4”.
18. 22 07 19 item 1.3 indicates special insulation thickness for any traced piping. Is any of the plumbing piping going to be traced?
a. Answer: yes.
19. The existing panel “MD” was built in 1966, does the owner have breakers needed for the new equipment and panels being added to this panel?
a. Answer: Owner does not have breakers.