Questions and Answers for 12445523Q0149 Superior NF Reverse Osmosis System.docx
DOCX document 13 KB Posted
- Attached to
- Superior National Forest - Furnish and install whole office reverse osmosis system for drinking water
- Solicitation number
- 12445523Q0149
- Issued by
-
Department of Agriculture Forest Service
About this file
This document contains questions and answers regarding Solicitation Number 12445523Q0149 from the Department of Agriculture Forest Service to furnish and install a whole office reverse osmosis system for drinking water at the Superior National Forest. The key details are as follows:
The minimum floor space available for installation of the reverse osmosis system is 2ft by 4ft, with limited wall space. Water usage data is unavailable as the system is not metered, but the system must accommodate a maximum of 15 persons during peak usage times for a facility with 2 restrooms, 2 showers, a laundry room, kitchen, and 2 water fountains. No minimum gallon per minute production is specified, but the system must meet the peak usage of 15 persons. The document includes test results for recent lead and copper levels in the water.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Photos of Mechanical Room.docx | DOCX document | |
| SF 30 (11_2016).pdf | ||
| Test Results.JPG | JPG image | |
| A2 FS-SOW-Reverse Osmosis System.pdf | ||
| 12445523Q0149 SUF Reverse Osmoisi System RFQ.pdf | ||
| A1 DBA Wage Determination MN20230129 St. Louis County, MN dated 071423.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers for 12445523Q0149 Superior NF Reverse Osmosis System
a) Please provide information as to the minimum floor and wall space (dimensions) available in the vicinity of the existing water system for installation of the RO system. Minimum floor space of 2ft x 4ft. Wall space is limited. See attached photos of mechanical room for space availability.
b) Please provide information on the monthly water usage for the past 3-6 months at the building to be used in sizing the RO system.
Water system is not metered so usage is unknown. Usage shall be figured out to accommodate a maximum of 15 persons during peak usage time. Facility contains 2 restrooms, 2 showers, laundry room, kitchen, and 2 water fountains.
c) Does the Government have any requested minimum GPM that the RO system is to produce. Minimum usage shall be figured out to accommodate a maximum of 15 persons during peak usage time. Facility contains 2 restrooms, 2 showers, laundry room, kitchen, and 2 water fountains.
d) Please provide detailed information regarding recent lead and copper water sample test results. See attached test results for lead and copper levels.
File details come from the government source that posted it. Updated .