Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

JOHN SWIZDOR

Amended to clarify the schedule of items.

USDA-FOREST SERVICE

CSA #13

401 FAIRGROUNDS ROAD

ROLLA, MO 65401

12445522Q0033

1 5

03/23/2022

03/04/2022

JOHN SWIZDOR Digitally signed by JOHN SWIZDOR Date: 2022.03.23 09:13:34 -05'00'

INSTRUCTIONS (Back Page):

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date).

(1)

(2)

(3)

(4)

(5)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a)

(b)

(c)

(d)

(e)

(f)

Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data).

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:

(2) Accounting classification Net decrease $

Include subject matter or short title of solicitation/contract where feasible.

Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.

(i)

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification).

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.

Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

(i) Total contract price increased by $

(ii) Total contract price decreased by $

(iii) Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

(g)

(h)

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

(i) A reference to the letter determination; and

(ii) A statement of the net amount determined to be due in settlement of the contract.

(1)

(2)

(3)

(4)

(5)

(6)

STANDARD FORM 30 (REV. 11/2016) BACK

(1) Accounting classification Net increase $

12445522Q0033

GRAND ISLAND DREDGING

HIAWATHA NATIONAL FOREST

Page | 1

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 SCHEDULE OF ITEMS

Item Supplies/Services Qty Unit of Issue

Unit Price Total Price

BASE YEAR-April 1, 2022-March 31, 2023

DREDGING MAIN PATH

0001 MOBILIZATION 1 EA

0002 SETUP/REMOVAL OF TURBIDITY CURTAIN

AND SILT FENCE

1 EA $ $

0003 HAULED AND PUSHED INTO PILES NO

LESS THAN 13’ AND NO MORE THAN 15’

HIGH AT DESIGNATED SPOILS

LOCATIONS

1500 CY $ $

0004 DREDGING AND STOCKPILING 1500 CY $ $

0005 BARGE RUNS 4 EA $ $

TOTAL $

DREDGING OPTION

0006 SETUP/REMOVAL OF TURBIDITY CURTAIN

AND SILT FENCE

1 EA $ $

0007 HAULED AND PUSHED INTO PILES NO

LESS THAN 13’ AND NO MORE THAN 15’

HIGH AT DESIGNATED SPOILS

LOCATIONS

40 CY $ $

0008 DREDGING AND STOCKPILING 40 CY $ $

TOTAL $

GRAND TOTAL $

Page | 2 of Issue

Unit Price Total Price

OPTION YEAR I-April 1, 2023-March 31, 2024

DREDGING MAIN PATH

1001 MOBILIZATION 1 EA

1002 SETUP/REMOVAL OF TURBIDITY CURTAIN

AND SILT FENCE

1 EA $ $

1003 HAULED AND PUSHED INTO PILES NO

LESS THAN 13’ AND NO MORE THAN 15’

HIGH AT DESIGNATED SPOILS

LOCATIONS

1500 CY $ $

1004 DREDGING AND STOCKPILING 1500 CY $ $

1005 BARGE RUNS 4 EA $ $

TOTAL $

DREDGING OPTION

1006 SETUP/REMOVAL OF TURBIDITY CURTAIN

AND SILT FENCE

1 EA $ $

1007 HAULED AND PUSHED INTO PILES NO

LESS THAN 13’ AND NO MORE THAN 15’

HIGH AT DESIGNATED SPOILS

LOCATIONS

40 CY $ $

1008 DREDGING AND STOCKPILING 40 CY $ $

Page | 3 of Issue

Unit Price Total Price

OPTION YEAR II-April 1, 2024-March 31, 2025

DREDGING MAIN PATH

2001 MOBILIZATION 1 EA

2002 SETUP/REMOVAL OF TURBIDITY CURTAIN

AND SILT FENCE

1 EA $ $

2003 HAULED AND PUSHED INTO PILES NO

LESS THAN 13’ AND NO MORE THAN 15’

HIGH AT DESIGNATED SPOILS

LOCATIONS

1500 CY $ $

2004 DREDGING AND STOCKPILING 1500 CY $ $

2005 BARGE RUNS 4 EA $ $

TOTAL $

DREDGING OPTION

2006 SETUP/REMOVAL OF TURBIDITY CURTAIN

AND SILT FENCE

1 EA $ $

2007 HAULED AND PUSHED INTO PILES NO

LESS THAN 13’ AND NO MORE THAN 15’

HIGH AT DESIGNATED SPOILS

LOCATIONS

40 CY $ $

2008 DREDGING AND STOCKPILING 40 CY $ $

B.2 SCHEDULE NOTES

a. There is a requirement for bonding and/or payment protections (Irrevocable Letter of Credit (ILC) or payment bond) if quote is over $35,000. The bonds or ILC will be for 100% of the award price and submitted within 10 days after contract award. See Section I for additional information.

b. Contractor must be registered www.sam.gov to be considered. THIS IS A FREE

REGISTRATION.

c. A site visit may be arranged by request via email to Dave Devet at dave.devet@usda.gov.

d. Award will be made to a single offeror. Multiple awards will not be considered. Offerors shall submit pricing for all items. There is a requirement to submit a technical proposal with your offer. See Section L & M for preparation instructions.

e. Per FAR Clause 52.236-15, the Contracting Officer determines the successful offeror is required to submit a practicable schedule within 10 days of contract award. See Far Clause 52.236-15 for more information.

mailto:dave.devet@usda.gov

Modification of Contract
NRE_Construction_RFQ_01302022 WORKING 0001
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 SCHEDULE OF ITEMS
B.2 SCHEDULE NOTES