12445224B0010 - MORTIMER WORK CENTER ROOF REPLACEMENT & EXTERIOR REPAIRS
Solicitation number
12445224B0010
Issued by

About this file

This document is an amendment to a solicitation for the MORTIMER WORK CENTER ROOF REPLACEMENT & EXTERIOR REPAIRS project. The amendment provides responses to RFIs submitted by potential bidders and replaces the Statement of Intent (SOI) attachment. The project scope includes full replacement of the roof shingles and underlayment, as well as limited replacement of damaged exterior siding and trim. The contract period of performance is 90 days after the notice to proceed. A site visit is scheduled for 6/6/2024, and proposals are due by 6/20/2024. The project has a magnitude of less than $25,000, and award will be made to the lowest priced, responsible offeror. Additional details such as access routes, cell service availability, and roof deck composition are provided in the amendment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12445224B0010 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ATLANTA GA 30309-2449

STE 876S

1720 PEACHTREE ST NW

USDA-FS CSA EAST 12

05/29/20240001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/29/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project: MORTIMER WORK CENTER ROOF REPLACEMENT & EXTERIOR REPAIRS

The purpose of the amendment 0001 is to:

1. Provide responses to RFI's that were submitted by potential bidders. The RFI responses are incorporated into the terms and conditions of this solicitation and resulting task order.

2. Remove attachment "J2 - SOI Mortimer Work Center Roof" and replace with "J2 - Rev2

Mortimer Work Center Roof_SOI_2024.05.16" in this solicitation.

No other changes are made.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

KEISHA N. ROBINSON

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Project Name: MORTIMER WORK CENTER ROOF REPLACEMENT & EXTERIOR REPAIRS Solicitation: 12445224B0010

Government responses are in red:

1. What days and hours are available to perform the work?

The work may be performed during normal daylight hours any day of the week. If work on weekends or holidays are needed, contract COR for accommodation.

2. What is the availability of cell service and/or landline phone service?

Cell service at the project site should be assumed to be unavailable. A land line phone is located inside the work center for 911 calls ONLY, however this line has a history of unreliability.

3. Which roads can be used to access the project area?

Highway 90 from Colletsville and Brown Mountain Beach Road from Hwy 181 are the two most commonly used routes to access the project area. The Contractor is responsible for verifying the suitability of available roads for the delivery of materials and equipment.

4. Does the existing roof have continuous decking (OSB sheets) layered above the slat sheathing visible from inside the attic?

The Contractor shall assume that no additional layer of decking exists above the slat sheathing visible from inside the attic. Shingles shall be installed per manufacturer’s recommendations for securely nailing all shingle courses to roof deck.