SOW Attachment 002.pdf
PDF 1 MB Posted
- Attached to
- 12445124Q0020 Clear Springs Concrete Pad
- Solicitation number
- 12445124Q0020
- Issued by
-
Department of Agriculture Forest Service
About this file
This document appears to be a Statement of Work (SOW) for a federal contract opportunity to construct an accessible walkway and picnic pad at the Clear Springs Campground in Meadville, Mississippi.
The SOW outlines the contractor's responsibilities, which include excavating, forming, and pouring a 20x35 foot pad around an existing picnic table and a 39x5 foot walkway, all to a depth of 6 inches. The contractor must provide all necessary materials, labor, equipment, and permits to complete the work. The work must be performed within specified work hours and follow all safety requirements. The contractor is also required to have a quality control program and provide reports and employee information as requested.
The related federal contract opportunity is a Request for Quote (RFQ) solicitation for the concrete work, with a tentative issuance date of July 19, 2024, a site visit on August 5, 2024, and a quote submittal deadline of August 9, 2024. The contract will be a firm-fixed price award to the lowest priced responsible offeror, and the work must be completed within 15 days after the notice to proceed. The project is set aside 100% for small businesses under NAICS code 238190, with a size standard of $19.0 million.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF SERVICES
ACCESSIBLE WALKWAY AND PICNIC PAD
ITEM DESCRIPTION QTY UNIT TOTAL PRICE
0001 • Excavate approximate 20x35 pad around picnic table and place forms
• Excavate approximate 39x5 walkway between pad and existing sidewalk and place forms
• Place 4”x4” steel welded wire mesh and support on chairs and bolsters.
• Pour concrete in forms to a depth of 6” thick and flush with existing sidewalk
• Float and finish the wet concrete
• Place temporary fencing around site while concrete cures
Clear Springs Campground, 3888 Clear Springs Rd, Meadville, Ms 39653
1 Each
TOTAL $ ___________
National Forests in Mississippi, Homochitto Ranger District
ATTACHMENT 002
Statement of Work
Statement of Work – Accessible Walkway and picnic pad
A. GENERAL: Contractor shall provide all materials, labor, equipment, tools, transportation, permits, licenses, supervision, expertise, and other incidentals necessary to successfully excavate, form, and pour an approximate 20x35 pad around the existing picnic table and 39x5 walkway to pad to a 6” inch depth.
B. Clean up the site and dispose of materials off of the Forest Service property, at the Clear Springs Day Use, 3888 Clear Springs Rd, Meadville, Ms 39653
B. WORK HOURS:
1. Normal Work Hours: 10:00am - 6:30pm, Monday through Saturday.
2. The eleven (11) holidays observed by the Federal Government are: New Year’s Day, Martin Luther King’s Birthday, President’s Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day and Christmas Day and any other day specifically declared by the President of the United States to be a national holiday.
C. SPECIFICATIONS:
1. Safety
a. The contractor shall inform the district 2 days prior to beginning work.
b. The contractor shall use necessary PPE to complete the job safely.
2. All tasks accomplished by the contractor personnel shall be done so as to preclude damage or disfigurement of outdoor structures, hardware, and signs. The contractor shall correct any damage caused by their employees to any part of the building, hardware or signs in any area covered by this contract at the contractor’s expense.
3. Remove existing gravel and soil from site and dig out necessary material to create a form for an approximate 20x35 pad around existing picnic table and 39x5’ walkway from water fountain to pad Concrete slab will be 6” thick and be flush with the existing sidewalk. Place 4” x 4” steel welded wire mesh and support on chairs or bolsters. . Float and finish the wet concrete. Place temporary fencing around site while concrete cures.
D. GOVERNMENT FURNISHED EQUIPMENT/SUPPLIES
E. QUALITY ASSURANCE: All work shall be completed using all best safety requirements. The Government will receive and investigate complaints from various customers located at the Federal Agency location and other locations associated with this contract. All information received will be provided either verbally and/or in writing to the contractor for appropriate action. All incentives and penalties will be judged according to unannounced inspections, direct observations or inspections, and COTR review of submitted reports or substantiated complaints by building occupants.
F.
1. Contractor Quality Control Program
a. The contractor shall have a quality control program to assure all requirements of the contract are met as specified. The program shall be detailed and provided in writing to the Contracting Officer or his/her designee. The program shall be continuously improved to keep in compliance with OSHA, Joint Commission, and Infection Control guidelines.
b. The contractor shall provide upon request all documentation regarding this Quality Control program including guidelines and inspection results.
2. Periodic Progress Meetings
a. The Contracting Officer, COTR, or other government personnel as appropriate and the contractor shall have periodic meetings to discuss the contractor’s performance. Items for discussion include, but are not limited to inspection results, customer complaints, opportunities to improve performance, steps taken by the contractor to prevent occurrences in the future. The contractor shall provide a summation of unsatisfactory findings and customer complaints and provide insight into any identified trends.
G. OTHER REQUIREMENTS: All items are contained in this subsection are required to be provided by the contractor by the listed deadline and are subject to penalties for delinquency.
Requirement Timeline/Deadline/Specification
Contractor Quality Control program Written submission of program no later than 5 days prior to starting date of contract
Provide Reports / Job related data upon request. Contractor is required to provide reports and job-related data within 3 business days of request.
Reports may include but are not limited to (for each location): hours worked, supplies consumed, accident reports, summary of quality assurance program results, summary of complaints, etc.
List of Employees Contractor shall provide comprehensive list of employees, by contract location, prior to the start of the contract. The employee list must include good contact phone numbers for each employee as well as all completed training as proof of compliance with all applicable laws and requirements.
Seamlessness of Service Contractor is responsible to provide replacement personnel immediately if any in their employment cannot complete the work assigned.
There shall be no instances where work is not performed as required and in accordance with Work Hours (section B).
H. SECURITY ACCREDITATION PACKAGE
-----END OF SOW-----
Delivery FOB Destination to:
Clear Springs Day Use, 3888 Clear Springs Rd, Meadville, Ms 39653