12445123B0013 SOL Package.pdf
PDF 6 MB Posted
- Solicitation number
- 12445123B0013
- Issued by
-
Department of Agriculture Forest Service
About this file
This solicitation is for the installation of seven emergency eye wash stations on the Ouachita National Forest. The Forest Service is seeking bids for excavation, installation of water lines, concrete bases, and eye wash stations. Bids are due by August 4, 2023 and the contract will be awarded to the lowest priced, technically acceptable offeror. The solicitation includes a schedule of items listing the location of each eye wash station and instructions for submitting price quotes for each line item. Offerors must be registered in SAM.gov and include representations and certifications with their proposal.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No: 12445123B0013 Project Name: USDA Forest Service Ouachita Eye Wash Stations
NOTICE TO OFFERORS
SF-1442 INFORMATION
Item 11: COMPLETION DATE: Work shall be completed on or before the date specified in FAR 52.211-10.
Item 12A: PERFORMANCE AND PAYMENT BONDS: See FAR Clause 52.228-15 Performance and Payment Bonds- Construction.
Item 14: NAME AND ADDRESS OF OFFEROR: SAM UEI number shall be included in addition to the name and address.
Item 19: ACKNOWLEDGMENT OF AMENDMENTS: FAILURE TO ACKNOWLEDGE AMENDMENTS, IN ITEM 19 OF THE SF-1442, BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR QUOTE. If amendments are issued, they will be posted to www.beta.sam.gov.
Item 24: SUBMITTING INVOICES: Invoices must be comply with FAR 52.232-5, Payments under Fixed Price Construction Contracts, and submitted electronically using the Invoice Processing Platform (IPP) via www.IPP.gov.
I. PRE-QUOTE INFORMATION
ELECTRONIC QUOTE SUBMISSION. Submit an electronic copy of your proposal package to: charles.cotton@usda.gov with the following documents:
□ SF-1442, Solicitation, Offer & Award, Pages 1 and 2 o Acknowledge any amendments
□ B.1 SCHEDULE OF ITEMS
□ Annual Representations and Certifications (FAR Provision 52.204-8), Representation Regarding Certain o Telecommunications and Video Surveillance Services or Equipment (FAR Provision 52.204-24), and
Certification o Regarding Responsibility Matters (FAR Provision 52.209-5). Section K of this solicitation.
□ Contractor Quote Data. This may all be in one PDF. Delineate the volumes with a dividing page
Reference/Description Page Limit VOL I: Technical Approach N/A _ BASE CONTRACT DATA ACCEPTED
N/A _ BASE CONTRACT DATA ACCEPTED
Schedule B
VOL II: Past Performance VOL III: Price
II. Award Intention. The USDA-FS intends to award one contract to the LPTA proposal.
III. QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE ACCEPTED AFTER 12:00 P.M. ON 08/04/2023 Questions can be submitted to charles.cotton@usda.gov. Questions and answers will be posted to SAM.
Submittal Format and Confirmation/Receipt.
Email Subject Line: 1 2 4 4 5 1 2 3 B 0 0 1 3 Company Name_Proposal
Email: Your quote shall be emailed to :charles.cotton@usda.gov
**DO NOT WAIT TO CONFIRM RECEIPT!**
Site Visit:
Last day for Questions:
Deadline:
NA
07/19/2023
08/04/2023 1200 ET
A ZOOM meeting will be held on 08/04/2023 at 1300EST to open the bids. The ZOOM meeting details will be posted on SAM.
http://www.beta.sam.gov/ http://www.ipp.gov/ mailto:charles.cotton@usda.gov mailto:charles.cotton@usda.gov
Project Name: USDA Forest Service Ouachita Eye Wash Stations
It is the contractor’s responsibility to ensure their quote is received by the government. Your email with the PDF attached will be deposited in a secure USDA-FS file.
This solicitation and the subsequent contract are governed by the Federal Acquisition Regulations (FAR), agency supplemental regulations, and the drawings, specifications, and data attached. Applicable FAR provisions and clauses in this RFQ are incorporated by reference or full text. FAR provisions and clauses incorporated by reference can be accessed on the Internet at:
https://www.acquisition.gov/browse/index/far.
It is the responsibility of the offeror to verify that this solicitation document, including the plans, are complete as listed in the table of contents and the index to sheets. Plan sheets are attached to the email solicitation.
Notice of SAMRegistration – offerors must be registered and ACTIVE in the System for Award Management (SAM) prior to submission of a quote in response to this solicitation. Failure to register prior to submission of a quote may require award to the next successful registered offeror. See FAR Subpart
4.1102. Register online at www.sam.gov. (SAM is an official website of the U.S. government. There is no cost to use SAM. You can use this site for FREE to register to do business with the U.S. government.).
Representations and Certifications – This solicitation is issued under NAICS 238990 All Other Specialty Trade Contractors. Please complete the certification listed in paragraph (b) of FAR Provision 52.204-8 Annual Representation and Certifications. Offerors must certify small business status for NAICS 238220 in SAM.
Before submitting a quote, please ensure you have completed annual representations and certifications electronically in SAM at www.sam.gov.
Modifications to quotes - quotes may be modified or withdrawn by electronic commerce (email) if such notice is received prior to the time specified for receipt of quotes. The Government will not be responsible for ANY failure attributable to the transmission or receipt of electronic commerce (email) data. For all modifications, the Government STRONGLY ENCOURAGES offerors to resubmit the entire quote schedule with a unit price and amount for every quote item, and a Schedule Total Modifications which make the quote ambiguous, indefinite, or uncertain as to any essential requirement of the contract will cause the quote to be rejected as nonresponsive. Email Address to submit modifications to quotes for this project is charles.cotton@usda.gov.
Vets-4212 Reporting - Offerors must complete the following report, if required. See reporting requirements at: https:// www.dol.gov/agencies/vets/programs/vets4212.
□ My firm had a qualifying Federal Contract in 2020 and has complied with the reporting requirements.
□ My firm did not have a qualifying Federal Contract in 2020 and is therefore exempt from the reporting require http://www.acquisition.gov/browse/index/far http://www.acquisition.gov/browse/index/far http://www.sam.gov/ http://www.sam.gov/ http://www.dol.gov/agencies/vets/programs/vets4212
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
1086224
USDA-FS CSA EAST 11
1720 PEACHTREE ST NW
STE 876S
ATLANTA GA 30309-2449
Charles Cotton
Contracting Officer CSA 11
CHARLES COTTON 859-745-3157
x
06/28/2023
12445123B0013
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Contractor to provide all labor, tools, equipment, and materials to install 7
Government Furnished Emergency Eye wash Stations on the Ouachita National Forest.
Please include your SAM UEI number on bids.
All line items must be bid.
NAICS:237110
PSC: N045
Questions Due 17 July 2023 by 1200 EST
Proposals due no later than 04 August 2023 by 1200 EST
11. The Contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 120 calendar days and complete it within ________________ ________________ calendar days after receiving
08/04/2023
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 8/2014)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
USDA-FS CSA EAST 11
1720 PEACHTREE ST NW
STE 876S
ATLANTA GA 30309-2449
CHARLES C. COTTON
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 3304(a)
STANDARD FORM 1442 (REV. 8/2014) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
12445123B0013
Delivery: 11/10/2023
Delivery Location Code: 7A86
OUACHITA NATIONAL FOREST
100 RESERVE STREET
HOT SPRINGS AR 71901 US
Period of Performance: 08/16/2023 to 11/01/2023
0001 61101-1 JESSIEVILLE EYE WASH INSTALLATION080901C 1 EA
SO CON Forest Wide Eyewash Station Installation
648632 6
Product/Service Code: N045
Product/Service Description: INSTALLATION OF
EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL
EQUIPMENT
0002 61101-2 ROVER EYE WASH STATION080901C SO CON 1 EA
Forest Wide Eyewash Station Installation 648632
Product/Service Code: N045
Product/Service Description: INSTALLATION OF
EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL
EQUIPMENT
0003 61101-3SEED ORCHARD EYE WASH STATION 080901C SO 1 EA
CON Forest Wide Eyewash Station Installation
648632
Product/Service Code: N045
Product/Service Description: INSTALLATION OF
EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL
EQUIPMENT
0004 61101-4PROJECT SUMMARY SHEET 080901C SO CON 1 EA
Forest Wide Eyewash Station Installation 648632
Product/Service Code: N045
Product/Service Description: INSTALLATION OF
EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL
EQUIPMENT
0005 61101-5MENA EYE WASH STATION 080901C SO CON 1 EA
Forest Wide Eyewash Station Installation 648632
Product/Service Code: N045
Product/Service Description: INSTALLATION OF
EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
4 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
12445123B0013
EQUIPMENT
0006 61101-6WALDRON EYE WASH STATION 080901C SO CON 1 EA
Forest Wide Eyewash Station Installation 648632
Product/Service Code: N045
Product/Service Description: INSTALLATION OF
EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL
EQUIPMENT
0007 61101-7 HOCHATOWN EYE WASH STATION 080901C SO CON 1 EA
Forest Wide Eyewash Station Installation 648632
Product/Service Code: N045
Product/Service Description: INSTALLATION OF
EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL
EQUIPMENT
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
BID SHEET
RD 1 OF 1
District
FOREST WIDE
County
VARIES
Pay Item
Number Description
Method
Measure.
Units of
Measure. Quantity Unit Price Cost
61101-1 JESSIEVILLE EYE WASH INSTALLATION L.S. Each 1
61101-2 ROVER EYE WASH STATION L.S. Each 1
61101-3 SEED ORCHARD EYE WASH STATION L.S. Each 1
61101-4 ODEN EYE WASH STATION L.S. Each 1
61101-5 MENA EYE WASH STATION L.S. Each 1
61101-6 WALDRON EYE WASH STATION L.S. Each 1
61101-7 HOCHATOWN EYE WASH STATION L.S. Each 1
EYE WASH INSTALLATIONS Total
CONSTRUCTION
PROJECT EYE WASH INSTALLATIONS CONTRACTOR:
0.00 UEI #
EYE WASH INSTALLATIONS
Road Construction Services
Exhibit B: PERFORMANCE RELEVANCY QUESTIONNAIRE
Provide the following information requested in this format for each of the projects/contracts being described. Projects may be ongoing and cannot have been completed any later than 3 years prior to the to this issue date. Provide frank, concise comments regarding YOUR PERFORMANCE on the contracts you identify. Use as much space as required. OFFEROR SHOULD PLACE
THEIR NAME ON TOP OF EACH QUESTIONNAIRE PAGE.
INSTRUCTIONS: If extra space is needed use the reverse. Mark "X" in appropriate boxes.
CONTRACTOR NAME, ADDRESS & TELEPHONE/Unique Sam ID
How many years do you or your firm have in the line of work contemplated by this solicitation ______? How many years experience in contracting have you or your business had as a (a) prime contractor _____ and/or (b) sub-contractor _____?
PART 1 - PAST / CURRENT PROJECTS
List below up to 5 projects your business has completed within the last 3 years similar in scope to the solicitation:
Contract Amount Type of Project Date Completed Name Address & Telephone No. of Person to Contact for Project Information.
List below all of your firm's contractual commitments running concurrently with the work contemplated by this solicitation:
Contract No. Dollar Amount of Project
Name, Address & Phone No. of Business Govt./Agency
Awarded (Units)
Completed
Date Contract Completed
Have you ever failed to complete any work awarded to you? Yes ( ) No ( ) Has work ever been completed by performance bond? Yes ( ) No ( ) If "Yes" to either item above specify location(s) and reason(s) why:
PART 2 – SPECIALIZED EXPERIENCE – For each of the projects listed above, address the following comments on a separate sheet:
a) Describe the specific elements of the work performed by your firm.
b) Indicate what elements of work were performed by your major subcontractors and indicate if those same subcontractors will be used on Forest Service projects.
c) Address any technical areas about this project you consider uniquely relevant to this solicitation.
d) Point of Contact for Owner/Government agency Contracting Officer and or inspector; include a current phone number and facsimile number. Email address is also desired.
CERTIFICATION
I certify that all of the statements made by me are complete and correct to the best of my knowledge and that any persons named as references are authorized to furnish the Forest Service with any information needed to verify my capability to perform this project.
Certifying Official's Printed Name and Title Signature Date
Solicitation:
Forest/State:
The project is located at the Ouachita National Forest locations are in Hochatown, OK; Waldron, AR;
Mena, AR; Oden, AR; Mt Ida, AR; Rover, AR; and Jessieville, AR shown on the plans. The contractor shall provide all labor, tools, equipment, and materials to install 7 emergency eyewash/showers supplied by the Forest Service per the plans and specification. The installation of the eyewash/showers shall include trenching for the water line, installation of the water line and accessories including pressure testing and disinfection, concrete for the base for the eyewash/showers to be mounted, gravel drain area around the eyewash/showers, and finish grading and seeding at the sites.
FOREST WIDE EYE WASH
STATION INSTALLATIONS
SPECIAL PROJECT SPECIFICATIONS
JESSIEVILLE, FOURCHE, POTEAU, MENA, ODEN, AND TIAK
RANGER DISTRICTS
USDA FOREST SERVICE
OUACHITA NATIONAL FOREST
SPECIAL CONTRACT REQUIREMENTS
Project: FOREST WIDE EYE WASH STATION INSTALLATIONS
The Forest Service, US Department of Agriculture has adopted FP-14 for construction of National Forest System Roads. The following
Special Contract Requirements amend and supplement the Standard
Specifications for Construction of Roads and Bridges on Federal
Highway Projects (FP-14) U. S. Customary Units, U. S. Department of
Transportation, Federal Highway Administration.
Table of Contents
Contents
Project: FOREST WIDE EYE WASH STATION INSTALLATIONS
Table of Contents
Preface
101 - Terms¸ Format¸ and Definitions
101.01 Meaning of Terms
101.03 Abbreviations
101.04 Definitions
Delete these definitions and replace the following:
Add the following definitions:
102 - Bid¸ Award¸ and Execution of Contract
Delete Section 102
103 - Scope of Work
Delete Subsections 103.02, 103.03, 103.04, 103.05
104 - Control of Work
Delete Subsections 104.01, 104.02, 104.04
104.06 Use of Roads by Contractor
106 - Acceptance of Work
106.01 Conformity with Contract Requirements
106.02 Visual Inspection
106.07 Partial and Final Acceptance
107 - Legal Relations and Responsibility to the Public
Delete Subsection 107.05
108 - Prosecution and Progress
Delete Section 108
109 - Measurement and Payment
Delete Subsections 109.06, 109.07, 109.08, 109.09
109.02 Measurement Terms and Definitions
153 - Contractor Quality Control
153.03 Quality Control Plan
153.07 Records and control charts
155 - Schedules for Construction Contracts
Delete Section 155
156 - Public Traffic
Section 156. – PUBLIC TRAFIC
157 - Soil Erosion and Sediment Control
157.04 General
209 - Structure Excavation and Backfill
209.09 Backfill
209.10 Compacting
611 - Water Systems
611.02 Material
611.04 Laying Water Lines
611.05 Testing and Disinfecting Lines
611.10 Eye Wash Stations
611.11 Underground Warning Tape
703 - Aggregate
703.05 Subbase, Base, and Surface Course Aggregate
703.18 Porous Fill Material
725 – Miscellaneous Material
725.30 Water Line Piping
725.31 Eye Wash Stations
725.32 Underground Utility Warning Tape
725.33 Solvent Cement for pipe joints
Preface
Delete all but the first paragraph.
101 - Terms¸ Format¸ and Definitions
101.01_National_10_5_2017
Add the following paragraph to Subsection 101.01:
101.01 Meaning of Terms.
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03_National_10_5_2017
Add the following to Subsection 101.03:
101.03 Abbreviations.
(a) Acronyms.
AGAR — Agriculture Acquisition Regulations
AFPA — American Forest and Paper Association
FSAR — Forest Service Acquisition Regulations
MSHA — Mine Safety and Health Administration
NESC — National Electrical Safety Code
WCLIB — West Coast Lumber Inspection Bureau
(f) Miscellaneous unit abbreviations.
MP — milepost location ppm — parts per million volume
STA station location
101.04_National_10_5_2017
Make the following changes to Subsection 101.04:
101.04 Definitions.
Delete these definitions and replace the following:
Bid Schedule — The Schedule of Items.
Bridge — A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.
Contractor — The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “Purchaser”.
Culvert — Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.
Drawings — (Public Works Contracts) Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor according to FAR Clause 52.236-21 Specifications and Drawings for Construction. Also refers to submissions and submittals.
Notice to Proceed — (Public Works Contracts) Written notice to the Contractor to begin the contract work.
Right-of-Way — A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Solicitation—(Public Works Contracts) The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective bidders.
Add the following definitions:
Adjustment in Contract Price — “Equitable adjustment,” as used in the Federal Acquisition Regulations, or
“construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change — “Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Forest Service — The United States of America, acting through the Forest Service, U.S. Department of
Agriculture.
Neat Line — A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road — Temporary construction access built along the route of the project.
Purchaser — The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse — A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order — An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Shop Drawings — (Timber and Stewardship Contracts) Referred to as “Drawings” in FP-14, include drawings, diagrams, layouts, schematics, descriptive literature, illustrations, lists or tables, performance and test data, and similar materials furnished by Purchaser to explain in detail specific portions of the work required by the contract.
Utilization Standards — The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
102 - Bid¸ Award¸ and Execution of Contract
102.00_National_10_5_2017
Delete Section 102 in its entirety.
Delete Section 102.
103 - Scope of Work
Delete all of Section 103 except Subsection 103.01 Intent of Contract.
Delete Subsections 103.02, 103.03, 103.04, 103.05.
104 - Control of Work
Delete Subsections 104.01, 104.02, and 104.04.
Delete Subsections 104.01, 104.02, 104.04.
103.00_National_10_5_2017
104.00_National_10_5_2017
Add the following to Subsection 104.06:
104.06 Use of Roads by Contractor.
104.06_National_10_5_2017
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
106 - Acceptance of Work
Delete Subsection 106.01 and replace with the following:
106.01 Conformity with Contract Requirements.
Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.
106.01 _National_10_5_2017
References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.
Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.
Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.
Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.
When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.
The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the
Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.
Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.
Remove, repair, or replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted. Removing, repairing, or replacing work; providing temporary traffic control; and any other related work to accomplish conformity will be at no cost to the Government.
(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:
1. Sampling method;
2. Number of samples;
3. Sample transport;
4. Test procedures;
5. Testing laboratories;
6. Reporting;
7. Estimated time and costs; and
8. Validation process.
If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.
The CO will review the proposed resolution protocol and may modify it before final approval and execution.
The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the
Government will be responsible for all costs associated with developing and performing the resolution protocol.
If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.
(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:
1. Have the work accepted at a reduced price; or
2. Be given permission to perform corrective measures to bring the work into conformity.
The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.
106.02 _National_10_5_2017
Delete Subsection 106.02 and replace with the following:
106.02 Visual Inspection.
Acceptance is based on visual inspection of the work for compliance with the specific contract requirements.
Use prevailing industry standards in the absence of specific contract requirements or tolerances.
106.07_National_10_4_2017
Delete Subsection 106.07.
106.07 Partial and Final Acceptance.
107 - Legal Relations and Responsibility to the Public 107.05_National_10_5_2017
Delete Subsection 107.05.
Delete Subsection 107.05.
108 - Prosecution and Progress
Delete Section 108 in its entirety.
Delete Section 108.
109 - Measurement and Payment
Delete Subsections 109.06, 109.07, 109.08, and 109.09:
Delete Subsections 109.06, 109.07, 109.08, 109.09.
108.00_National_10_5_2017
109.00_National_10_5_2017
Add the following sentence to Subsection 109.02(b):
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
109.02_National_10_5_2017
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
153 - Contractor Quality Control
Add the following paragraph to the end of Subsection 153.03(b):
153.03 Quality Control Plan.
(b) Quality Control Procedures.
153.03_National_10_4_2017
Submit written proposals for approval of alternate AASHTO or State approved test methods. Alternate methods may be allowed based on documented equivalence to the specified method.
153.07_National_10_4_2017
Delete Subsection 153.07 and replace with the following:
153.07 Records and control charts.
Maintain complete testing and inspection records by pay item number and make them accessible to the CO.
155 - Schedules for Construction Contracts
Delete Section 155 in its entirety.
Delete Section 155.
156 - Public Traffic
Delete Section 156 in its entirety and replace with the following:
Section 156. – PUBLIC TRAFIC
155.00_National_10_5_2017
156.00_National_10_4_2017
Description
156.01 This work consists of controlling and protecting public traffic adjacent to and within the project.
Material
156.02 Conform to the MUTCD and the following Sections and Subsections:
Permanent Traffic Control 633
Traffic Signing and Marking Material 718
Concrete Barriers and Precast Guardwalls 618
Temporary plastic fence 710.11
Construction Requirements
156.03 General. Accommodate traffic according to MUTCD, approved traffic control plan and this section.
Perform work in a manner that ensures safety and convenience of the public. Unless otherwise provided for in
Table 156-1, keep existing roads open to all traffic during road improvement work, and maintain them in a condition that will adequately accommodate traffic. Accommodate public traffic on roads adjacent to and within the project until the project is accepted according to Subsection 106.07(b).
Submit traffic control plan at least 30 days prior to intended use. Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan has been approved.
Post construction signs and traffic control devices in conformance with MUTCD and Forest Service EM 7100-15.
All required signs will be in place and approved prior to beginning work on project.
If the Contractor agrees in writing to allow public traffic to use a new road being constructed prior to completion, it will be considered an existing road for traffic control purposes.
156.04 Temporary Traffic Control. Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the MUTCD. Install and maintain traffic control devices as follows:
(a) Furnish and install traffic control devices before the start of construction operations.
(b) All detours outside of clearing limits will be approved in writing by the Contracting Officer as part of the traffic control plan.
(c) Install only those traffic control devices needed for each stage or phase.
(d) Relocate temporary traffic control devices as necessary.
(e) Remove devices that no longer apply to the existing conditions.
(f) Immediately replace any device that is lost, stolen, destroyed, or inoperative.
(g) Keep temporary traffic control devices clean.
(h) Remove all temporary traffic control devices upon contract completion or when approved.
(i) When required, use flaggers certified by the American Traffic Safety Services Association, the National
Safety Council, the International Municipal Signal Association, a state agency, or other acceptable organization. Perform the work described under MUTCD Part 6. Use type III, VII, VIII, or IX retroreflective sheeting on flagger paddles. Do not use flags. Flaggers must wear high visibility safety apparel as required by MUTCD 6E.02.
156.05 Temporary Closures. Road segments may be closed as shown in Table 156-1. The maximum consecutive days of closure shall be as shown. Maintain traffic control devices during closure period(s).
Appropriate barricades and signs will be erected and maintained as shown in the traffic control plan or as otherwise designated.
Prior to closing roads during construction, give written notice to the Contracting Officer at least 10 days in advance.
Table 156-1
Temporary Road Closures
Road Number
Maximum Consecutive Days of Closure
XXX XXX
156.06 Acceptance. Public traffic work will be evaluated under Subsection 106.02.
Measurement and Payment
156.07 Do not measure Public Traffic for payment. Payment for contract work is provided indirectly. See
Subsection 109.05.
157 - Soil Erosion and Sediment Control
Delete Subsection 157.04 and replace with the following:
157.04 General.
157.04_National_10_4_2017
Thirty (30) days prior to the start of construction, submit a written plan according to subsection 104.03 with all necessary permits that provides permanent and temporary erosion control measures to minimize erosion and sedimentation during and after construction. Do not begin work until the necessary controls for that particular phase of work have been implemented. Do not modify the type, size, or location of any control without approval.
When erosion control measures are not functioning as intended, take corrective action to eliminate or minimize pollutants in storm water discharges from the project.
209 - Structure Excavation and Backfill
Make the following Changes to Subsection 209.09:
209.09 Backfill.
Add the following to Subsection 209.09(a):
209.09_National_10_5_2017
(a) General.
Backfill without damaging or displacing the culvert or structural plate structure. Replace any pipe that is distorted by more than 5 percent of nominal dimensions, or that is ruptured or broken.
Add the following to Subsection 209.09(b)
(b) Pipe culverts.
Do not place or backfill pipe that meets any of the following conditions until the excavation and foundation have been approved in writing by the CO:
• Embankment height greater than 6 feet at subgrade centerline.
• Installation in a protected stream course.
• Round pipe with a diameter of 48 inches or greater.
• Pipe arches with a span of 50 inches or greater.
• Any box culvert or structure other than pipe culverts.
209.10_National_10_5_2017
Delete Subsection 209.10 and replace with the following:
209.10 Compacting.
Compact the embankment using one of the following methods as specified.
(a) Compaction Method 1. Use AASHTO T 27 to determine the quantity of material retained on a No. 4 (4.75-millimeter) sieve. Compact as follows:
(1) More than 80 percent retained on a No. 4 (4.75-millimeter) sieve. Adjust the moisture content to a level suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Use compression-type rollers at speeds less than 6 feet (1.8 meters) per second and vibratory rollers at speeds less than 3 feet (1 meter) per second. Compact each layer of material full width with one of the following and until there is no visible evidence of further consolidation:
(a) Four roller passes of a vibratory roller having a minimum dynamic force of 40,000 pounds (180 kilonewtons) impact per vibration and a minimum frequency of 1000 vibrations per minute;
(b) Eight roller passes of a 20-ton (20-metric ton) compression-type roller; or
(c) Eight roller passes of a vibratory roller having a minimum dynamic force of 30,000 pounds (130 kilonewtons) impact per vibration and a minimum frequency of 1000 vibrations per minute.
Increase the compactive effort for layers deeper than 12 inches (300 millimeters) as follows:
• For each additional 6 inches (150 millimeters) or fraction thereof, increase the number of roller passes in Subsection 209.10(a)(1)(a), by four passes; or
• For each additional 6 inches (150 millimeters) or fraction thereof, increase the number of roller passes in Subsection 209.10(a)(1)(b) and (c), by eight passes.
(2) 50 to 80 percent retained on a No. 4 (4.75-millimeter) sieve. Classify the material according to AASHTO M 145. Adjust the moisture content of material classified A-1 through A-5 to a moisture content suitable for compaction. Adjust the moisture content of material classified A-6 and A-7 to within 2 percent of the optimum moisture content. Use
AASHTO T 99 to determine the optimum moisture content of the portion of the material passing a No. 4 (4.75-millimeter) sieve. Multiply this number by the percentage of material passing a No. 4 (4.75-millimeter) sieve, and add 2 percent to determine the optimum moisture content of the material.
Use nonvibratory rollers at speeds less than 6 feet (1.8 meters) per second and vibratory rollers at speeds less than 3 feet(1 meter) per second. Compact each layer of material full width according to Subsection 209.10(a)(1).
(3) Less than 50 percent retained on a No. 4 (4.75-millimeter) sieve. Classify the material according to AASHTO M 145. For material classified A-1 or A-2-4, determine the maximum density according to AASHTO T 99, Method C..
Adjust the moisture content of material classified A-1 through A-5 to a moisture content suitable for compaction. Adjust the moisture content of material classified A-6 and A-7 to within 2 percent of the optimum moisture content.
Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density. Determine the in-place density and moisture content according to AASHTO T 310 or other approved test procedures. When required, use
AASHTO T 224 to correct for coarse particles.
(b) Compaction Method 2. Adjust the moisture content of the material to a moisture content suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Operate roller compaction equipment over the full width of each layer until there is no visible evidence of further consolidation or, if when a sheepsfoot roller is used, the roller “walks out” of the layer. Make at least three complete passes. Use compression-type rollers at speeds less than 6 feet (1.8 meters) per second and vibratory rollers at speeds less than 3 feet (1 meter) per second. Ensure rollers meet the following requirements:
(1) Steel wheeled rollers, other than vibratory, capable of exerting a force of not less than 250 pounds per inch (4.5 kilogram/millimeter) of width of the compression roll or rolls.
(2) Vibratory steel wheeled rollers equipped with amplitude and frequency controls with a minimum dynamic force of 30,000 pounds (130 kilonewtons) impact per vibration, specifically designed to compact the material on which it is used.
(3) Pneumatic-tired rollers with smooth tread tires of equal size that will provide a uniform compacting pressure for the full width of the roller and capable of exerting a ground pressure of at least 80 psi (550 Kilopascals).
(4) Sheepsfoot, tamping, or grid rollers capable of exerting a force of 250 pounds per inch (4.5 kilogram/millimeter) of width of roller drum.
(c) Compaction Method 3. Adjust the moisture content of the material to a moisture content suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Operate hauling and spreading equipment uniformly over the full width of each layer until there is no visible evidence of further consolidation. Make at least three complete passes.
(d) Compaction Method 4. Adjust the moisture content of the material to a moisture content suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Operate hauling and spreading equipment uniformly over the full width of each layer.
(e) Compaction Method 5. Adjust the moisture content of the material to a moisture content suitable for compaction. Compact the complete surface with a bucket of an excavator larger than 39,000 pounds (18 metric ton) Gross Vehicle Weight using a minimum of three blows.
Overlap compaction by ½ width of bucket.
(f) Compaction Method 6. Adjust the moisture content of the material to a moisture content suitable for compaction. Compact using an approved mechanical tamper for a minimum of three complete passes.
When compacting with rollers or hauling and spreading equipment is not practical, use approved mechanical tampers for a minimum of three complete passes.
301.05_National_10_4_2017
611 - Water Systems
Add the following to Subsection 611.02.
611.02 Material.
Water Line Piping 725.30
Eye Wash Stations 725.31
Solvent Cement for pipe joints 725.34
Delete Subsection 611.04.
611.04 Laying Water Lines.
A. Piping shall have no dips in the piping.
B. Solvent welding of PVC Piping
1. Pipe shall have the end square, chamfer, and clean.
2. Check dry fit of pipe and fitting.
3. Use a suitable applicator to apply primer to the inside of the socket fitting and the outside of the pipe the full length of the joint.
4. While the primer is still wet apply an even coat of cement to the inside of the fitting.
5. Quickly assemble the joint. Cement must be fluid or restart the procedure.
6. Push the pipe completely into the fitting and give a ¼ turn.
7. Hold the joint together for minimum of 30 seconds or till glue has initial set and is not pushing the joint apart. Wipe off any excess glue.
8. Follow any other requirements that the product manufacturer requires for their product.
C. The piping shall be installed in strict accordance with the piping manufacturer's installation recommendations. Special attention shall be given to the manufacturer's recommended ambient installation temperatures, recommended embedment materials, pipe jointing system requirements including preparation and curing times and techniques, support requirements during installation, and recommended backfilling sequence and technique.
D. Longitudinal bending of the pipe shall comply with the manufacturer's recommendations. The literature provided by the Contractor shall include the manufacturer's recommendations for longitudinal bending.
E. Gate Valves in Valve Boxes
Provide brass valves with handwheels that open by counterclockwise rotation of the valve stem. Bolt and construct stuffing boxes to permit easy removal of parts for repair. Use valves from one manufacturer.
Install all gate valves in valve boxes. Valve boxes shall be installed plumb and in accordance with the manufacturer's instructions.
Valves installation shall conform to AWWA C509 in accordance with AWWA C600 for valve-and-fitting installation and with the recommendations of the Appendix ("Installation, Operation, and Maintenance of Gate Valves") to AWWA C509. Make and assemble joints to gate valves and check valves as specified for making and assembling the same type joints between pipe and fittings.
Delete Subsection 611.05.
611.05 Testing and Disinfecting Lines.
A. PRESSURE TESTING: All piping that is used in the final system shall be subjected to a pressure test.
The test shall use water (not air) as the testing medium. All items that comprise the system shall be tested unless otherwise authorized by the COR. The method for testing the system shall expose the system to a pressure of at least 125 psi for a period of not less than two hours. The method for accomplishing this shall be devised by the Contractor and approved by the COR. No amount of leakage is acceptable. Leaks in the new piping shall be repaired by the Contractor at no additional cost to the Government.
B. DISINFECTION: All water piping affected by this construction shall be disinfected in accordance with the specified code. This includes the existing water lines affected by this construction. The Contractor shall insure that all chlorine in excess of a 2 ppm residual shall be removed from the water supply prior to returning the system to service. Do not apply undiluted disinfectant to the lines before filling the pipes with water. Disinfection shall be accomplished as follows:
PROCEDURE: The Contractor shall devise his own method for ensuring that all piping is disinfected at the time it is placed into service. The Contractor shall describe the method of disinfection in writing for approval by the COR prior to beginning the procedure. All work shall comply with the specified code.
C. BACTERIOLOGICAL TESTING: After final flushing, and before the water system is placed in service, the contractor shall make two bacteriological tests 24 hours apart showing the absence of coliform organisms prior to acceptance of the water system. The samples shall be collected from the end of the main line. The contractor shall submit samples to a testing lab certified by the State Health Department for performing the required testing and furnish the engineer a copy of all test results.
D. REPETITION OF PROCEDURES: If the initial disinfection fails to produce samples acceptable to the
State for potable water, disinfection shall be repeated until satisfactory samples have been obtained.
When the samples are satisfactory, the system may be placed in service
E. Test Plan: Before testing begins and in adequate time to obtain approval through the submittal process, prepare and submit a test plan for approval by COR include testing procedures, methods, equipment, and tentative schedule. Obtain advance written approval for deviations from the
Specifications.
Add the following Subsection 611.10.
611.10 Eye Wash Stations.
Install Government Furnished “Haws” eye wash stations in accordance with the manufacturer’s recommendations in the locations indicated on the plans. Contact the COR for a copy of the “Haws Eye
Wash Installation Manual.” The eye wash stations are stored at each respective facility. The contractor shall contact the COR and let the COR know when the contractor will move the eye wash stations from storage to the site. The contractor shall contact the COR to gain access to the storage building where the eye wash stations are stored.
611.11 Underground Warning Tape.
The detection tape shall be placed above all buried utilities installed in this contract.
The detection tape shall have a minimum of 6 inches of cover over the tape and be placed 12 inches above the buried utility when depth allows.
The detection tape shall be installed per the manufacturer’s instructions.
Solvent Cement for pipe joints 725.34
Septic Tanks 725.35
703 - Aggregate
Delete Subsection 703.05 including Tables 703-2 and 703-3:
703.05 Subbase, Base, and Surface Course Aggregate
703.05_Forest_10_6_2017
Aggregate shall meet the requirements of Arkansas Department of Transportation Standard
Specifications for Highway Construction, 2014 Edition, SECTION 303 AGGREGATE BASE COURSE, and
TABLE 303-1 AGGREGATE BASE COURSE GRADING AND CRUSHING REQUIREMENTS, including the requirements of subsection 303.01 Materials. When used as a surface course, aggregate shall have a PI of 3-7.
703.18 Porous Fill Material
The aggregate for the eye wash frost free drain shall be one-half to two and one-half inches (1/2" to 2-
1/2") in diameter with no more than ten percent (10%) by weight passing through a one-half inch (1/2") screen. The aggregate shall have a Mohs hardness of at least 3.0.
725 – Miscellaneous Material
Add the following Subsection 725.30.
725.30 Water Line Piping.
All piping and fittings shall be schedule 40 PVC. PVC water line piping, valves, and fittings must meet the requirements in ASTM D 1785, ASTM D 2466, ASTM D 2564, ASTM D2665, ASTM D2949, ASTM 3033, ASTM 3034, ASTM F 656, and ASTM F 1668. Pipe and fittings shall be manufactured from virgin rigid PVC compounds with a cell class of 12454 as identified in ASTM 1784.
Valve Boxes
1. Valve box top section shall be made of ductile iron.
2. The top section shall have an adjustable elevation.
3. The bottom section shall be constructed of corrosion-proof plastic or polymer.
Add the following Subsection 725.31.
725.31 Eye Wash Stations.
Eye wash stations shall be Government Furnished “Haws” eyewash stations. Coordinate the pick-up of the water towers with the COR.
Add the following Subsection 725.32.
725.32 Underground Utility Warning Tape.
The detection tape shall have an overall thickness of 5 mil with a foil core thickness of 0.35 mil per ASTM
D 2103. Tape…