12445022Q0004
Gypsy Moth Aerial Spray Program
SOLICITATION TABLE OF CONTENTS
SCHEDULE OF ITEMS/PRICE SCHEDULE
CONTRACT CLAUSES
ECONOMIC PRICE ADJUSTMENT – JET FUEL AND 100LL
SOLICITATION ATTACHMENTS
SOLICITATION PROVISIONS
OFFEROR SUBMISSION INSTRUCTIONS
TECHNICAL VOLUME
PAST PERFORMANCE VOLUME
PRICE VOLUME
EVALUATION CRITERIA
TECHNICAL EVALUATION
PAST PERFORMANCE EVALUATION
PRICE EVALUATION
REPRESENTATIONS & CERTIFICATIONS
SECTION B – CONTINUATION OF SF-1449
Schedule of Items/Price Schedule
Description of Requirement
It is the intent of this solicitation is to secure a Fixed Price with Economic Price Adjustment, Requirements Contract with a Base Year and four Option Years for the aerial application of mating disruptants to control gypsy moth on up to 353,480 acres per year. This solicitation is sub-divided into three acreage items; Item 1 includes treatment blocks located in Kentucky, North Carolina, Tennessee, Virginia, and West Virginia and a treatment window that extends from early June to late July. Item 2 includes treatment blocks located in Illinois, Indiana, and Ohio and a treatment window that extends from mid-June to early July. Item 3 includes treatment blocks in Iowa, Minnesota, and Wisconsin with a treatment window spanning from late June to early August. The total acres assigned to the Base Year Contract (2022) represent current draft acres and are subject to change depending on federal funding and final planning. The total acres assigned to each Item in the four option years represent the mean (2017 to 2021 data) for each year and not definite quantities. Award(s) will be made to all three items.
All of this work (100%) is set aside for small business.
Offers must use a base price of $4.99 per gallon for Jet A fuel and $5.45 per gallon for 100LL in preparing unit prices. In order to protect the contractor and the government from significant market fluctuations in the price of fuel, a lump sum adjustment will be made in the final payment of each Task Order based on the actual price per gallon paid for fuel on the project compared to what would have been paid at the prices stipulated above. Upward adjustments cannot exceed 10% of the base fuel price. There is no limit on downward price adjustments. See solicitation clause at 52.216-4, Economic Price Adjustment -Labor and Material.
Offers may be submitted for Item 1, Item 2, or Item 3, or for all three items. Four separate price proposals may be submitted if necessary (i.e., Item 1 only, Item 2 only, Item 3 only, and Item 1, 2 and 3). If an offer is submitted for all three items only and you do not wish to accept an award of less than all three items, indicate “all or nothing” on your offer. For each item offered, the Offeror is required to provide a unit price per acre and total amount for aerial application at the doses specified and a unit price per hour and total for observation aircraft for the base year and all option years. If the intent is to propose only one Item, enter “no proposal” in place of prices on the item you do not intend to compete. For example, if you wish to offer on item 1 only, you must submit pricing for item 1(a), (b), and (c) for the base year and all option years and write “no proposal” for items 2(a), (b), (c) and 3(a), (b), (c), for the base and all option years.
Note: The contractor is not required to provide aerial observation in the state of Wisconsin.
SCHEDULE OF ITEMS:
Base Year Contract (2022 Application)
Item No. Description Estimated
Quantity Unit of Issue Unit Price Total Amount
0001a Low Dose: Aerial application of the 6g ai/ac dose of mating disruptants
63,694 Acres
0001b High Dose: Aerial application of the 15.2 g ai/ac dose of mating disruptants
Acres
0001c Observation Aircraft in all states
Hours
TOTAL Item 0001 (a, b, and c):
0002a Low Dose: Aerial application of the 6 g ai/ac dose of mating disruptants
93,005 Acres
0002b High Dose: Aerial application of the 15.2 g ai/ac dose of mating disruptants
4,786 Acres
0002c states
TOTAL Item 0002 (a, b, and c):
0003a
Low Dose: Aerial application of the 6 g ai/ac dose of mating disruptants
151,975 Acres
0003b High Dose: Aerial application of the 15.2 g ai/ac dose of mating disruptants
8,000 Acres
0003c states except Wisconsin
TOTAL Item 0003 (a, b, and c):
Option Year 1 (2023 Application) Item No. Description Estimated
Quantity Unit of Issue Unit Price Total Amount
1001a Low Dose: Aerial application of the 6g ai/ac dose of mating disruptants
83,987 Acres
1001b High Dose: Aerial application of the 15.2 g ai/ac dose of mating disruptants
6,344 Acres
1001c Observation Aircraft in all states 52 Hours
TOTAL Item 1001 (a, b, and c):
1002a Low Dose: Aerial application of the 6 g ai/ac dose of mating disruptants
69,315 Acres
1002b High Dose: Aerial application of the 15.2 g ai/ac dose of mating disruptants
8,267 Acres
1002c Observation Aircraft in all states 52 Hours
TOTAL Item 1002 (a, b, and c):
1003a Low Dose: Aerial application of the 6 g ai/ac dose of mating disruptants
139,641 Acres
1003b High Dose: Aerial application of the 15.2 g ai/ac dose of mating disruptants
0 Acres
1003c Observation Aircraft in all states except Wisconsin
53 Hours
TOTAL Item 1003 (a, b, and c):
Option Year 2 (2024 Application)
No. Description Estimated
Quantity Unit of Issue Unit Price Total Amount
2001a Low Dose: Aerial application of the 6g ai/ac dose of mating disruptants
2001b High Dose: Aerial application of the 15.2 g ai/ac dose of mating disruptants
2001c Observation Aircraft in all states 52 Hours
TOTAL Item 2001 (a, b, and c):
2002a Low Dose: Aerial application of the 6 g ai/ac dose of mating disruptants
2002b High Dose: Aerial application of the 15.2 g ai/ac dose of mating disruptants
2002c Observation Aircraft in all states 52 Hours
TOTAL Item 2002 (a, b, and c):
2003a Low Dose: Aerial application of the 6 g ai/ac dose of mating disruptants
2003b High Dose: Aerial application of the 15.2 g ai/ac dose of mating disruptants
2003c
TOTAL Item 2003 (a, b, and c)
Option Year 3 (2025 Application)
No. Description Estimated
Quantity Unit of Issue Unit Price Total Amount
3001a Low Dose: Aerial application of the 6g ai/ac dose of mating disruptants
3001b High Dose: Aerial application of the 15.2 g ai/ac dose of mating disruptants
3001c Observation Aircraft in all states 52 Hours
TOTAL Item 3001 (a, b, and c):
3002a Low Dose: Aerial application of the 6 g ai/ac dose of mating disruptants
3002b High Dose: Aerial application of the 15.2 g ai/ac dose of mating disruptants
3002c Observation Aircraft in all states 52 Hours
TOTAL Item 3002 (a, b, and c):
3003a Low Dose: Aerial application of the 6 g ai/ac dose of mating disruptants
3003b High Dose: Aerial application of the 15.2 g ai/ac dose of mating disruptants
3003c
TOTAL Item 3003 (a, b, and c):
Option Year 4 (2026 Application)
No. Description Estimated
Quantity Unit of Issue Unit Price Total Amount
4001a Low Dose: Aerial application of the 6g ai/ac dose of mating disruptants
4001b High Dose: Aerial application of the 15.2 g ai/ac dose of mating disruptants
4001c Observation Aircraft in all states 52 Hours
TOTAL Item 4001 (a, b, and c):
4002a Low Dose: Aerial application of the 6 g ai/ac dose of mating disruptants
4002b High Dose: Aerial application of the 15.2 g ai/ac dose of mating disruptants
4002c Observation Aircraft in all states 52 Hours
TOTAL Item 4002 (a, b, and c):
4003a Low Dose: Aerial application of the 6 g ai/ac dose of mating disruptants
4003b High Dose: Aerial application of the 15.2 g ai/ac dose of mating disruptants
4003c
TOTAL Item 4003 (a, b, and c):
Disruptant Offered (Identify the product being offered for each item and the price per KG)
Item No.
Disruptant Offered (Disrupt and/or SPLAT)
Price per KG of disruptant (inclusive of sticker if Disrupt)
Government Buy-Back of Excess Disruptant or Use of GFP Disruptant
Excess disruptant product, as a result of the government’s estimate of the host type within the application block estimate being ± 5%, will be purchased from the contractor by the Government at the prices indicated in the disruptant tables located in the schedule of items above. Conversely if disruptant is supplied to the contractor as Government Furnished Property (GFP), the disruptant will be purchased from the government by the contractor at the price indicated in the disruptant tables located in the schedule of items above. These purchase(s) will be reflected as lump sum adjustments in the payment documents.
Location
The United States Department of Agriculture, Forest Service (FS) cooperative National Gypsy Moth Slow the Spread program (STS) works collaboratively with 11 states [Illinois (IL), Indiana (IN), Iowa (IA), Kentucky (KY), North Carolina (NC), Ohio (OH), Minnesota (MN), Tennessee (TN), Virginia (VA), West Virginia (WV), and Wisconsin (WI)] to reduce the rate of spread of gypsy moth.
SECTION C - CONTRACT CLAUSES
52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Federal Acquisition Regulation (FAR) Clauses:
https://www.acquisition.gov/browse/index/far (FAR clauses begin with 52) Department of Agriculture Acquisition Regulation (AGAR) Clauses:
https://www.acquisition.gov/agar (AGAR clauses begin with 452) Deviations to clauses may be viewed at:
https://www.dm.usda.gov/procurement/policy/FARClassDeviations.htm
CLAUSES INCORPORATED BY REFERENCE
52.203-3 Gratuities (APR 1984)
52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights (JUN 2020)
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY 2011)
52.204-13 System for Award Management Maintenance (OCT 2018)
52.204-18 Commercial and Government Entity Code Maintenance (AUG 2020)
52.212-4 Contract Terms and Conditions – Commercial Items (NOV 2021)
Addenda to 52.212-4:
Replace paragraph (r) of clause 52.212-4 with the following as specified in
DEVIATION 2017-1 (AUG 2017):
(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C 431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 10 U.S.C. 2409 relating to whistleblower protections; 49 U.S.C. 40118, Fly American; and 41 U.S.C chapter 21 relating to procurement integrity.
52.228-5 Insurance – Work on a Government Installation (JAN 1997) https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/agar
52.232-40 Providing Accelerated Payments to Small Business Subcontractors (NOV 2021) (DEVIATION APR 2020) (31 USC 3903 and 10 USC 2307)
52.237-2 Protection of Government Buildings, Equipment, and Vegetation (APR 1984)
52.245-1 Government Property (SEP 2021) Alt 1 (APR 2012)
52.245-9 Use and Charges (APR 2012)
CLAUSES INCORPORATED IN FULL TEXT
52.211-11 Liquidated Damages - LIQUIDATED DAMAGES-SUPPLIES, SERVICES, OR RESEARCH
AND DEVELOPMENT (SEPT 2000)
(a) If the Contractor fails to deliver the supplies or perform the services within the time specified in this contract, the Contractor shall, in place of actual damages, pay to the Government liquidated damages of – See Liquidated Damages Section of this solicitation.
(b) If the Government terminates this contract in whole or in part under the Default-Fixed-Price Supply and Service clause, the Contractor is liable for liquidated damages accruing until the Government reasonably obtains delivery or performance of similar supplies or services. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(c) The Contractor will not be charged with liquidated damages when the delay in delivery or performance is beyond the control and without the fault or negligence of the Contractor as defined in the Default-Fixed-Price Supply and Service clause in this contract.
52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders – Commercial Items (NOV 2021) (DEVIATION JUL 2020)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Nov 2021) (Section 1634 of Pub. L.
115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015)
(5) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).
(6) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
[Contracting Officer check as appropriate.] ☒ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (June 2020), with
Alternate I (Nov 2021) (41 U.S.C. 4704 and 10 U.S.C. 2402).
☒ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) (41 U.S.C.
3509)).
☐ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment
Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
☒ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) (Pub. L. 109-282) (31 U.S.C. 6101 note).
☐ (5) [Reserved].
☐ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
☒ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts
(Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
☒ (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors
Debarred, Suspended, or Proposed for Debarment. (Nov 2021) (31 U.S.C. 6101note).
☒ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters
(Oct 2018) (41 U.S.C. 2313).
☐ (10) [Reserved].
☐ (11) (i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Sep 2021) (15
U.S.C.657a).
☐ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business
Concerns (Sep 2021) 15 U.S.C. 657a).
☐ (13) [Reserved] ☒ (14) (i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2020) (15 U.S.C.644).
☐ (ii) Alternate I (Mar 2020) of 52.219-6.
☐ (15) (i) 52.219-7, Notice of Partial Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).
☐ (ii) Alternate I (Mar 2020) of 52.219-7.
☒ (16) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and
(3)).
☐ (17) (i) 52.219-9, Small Business Subcontracting Plan (Nov 2021) (15 U.S.C. 637(d)(4)).
☐ (ii) Alternate I (Nov 2016) of 52.219-9.
☐ (iii) Alternate II (Nov 2016) of 52.219-9.
☐ (iv) Alternate III (Jun 2020) of 52.219-9.
☐ (v) Alternate IV (Sep 2021) of 52.219-9.
☐ (18) (i) 52.219-13, Notice of Set-Aside of Orders (Mar 2020) (15 U.S.C. 644(r)).
☐ (ii) Alternate I (MAR 2020) of 52.219-13
☒ (19) 52.219-14, Limitations on Subcontracting (Sep 2021) (15 U.S.C.637s) [Contracting Officer check as appropriate.]
☐ By the end of the base term of the contract and then by the end of each subsequent option period; or ☒ By the end of the performance period for each order issued under the contract.
☐ (20) 52.219-16, Liquidated Damages-Subcontracting Plan (Sep 2021) (15 U.S.C.
637(d)(4)(F)(i)).
☐ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Sep 2021) (15 U.S.C. 657f).
☒ (22) (i) 52.219-28, Post Award Small Business Program Rerepresentation (Sep 2021) (15 U.S.C. 632(a)(2)).
☐ (ii) Alternate I (MAR 2020) of 52.219-28.
☐ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (Sep 2021) (15 U.S.C. 637(m)).
☐ (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Sep 2021) (15 U.S.C. 637(m)).
☐ (25) 52.219-32, Orders Issued Directly Under Small Business Reserves (Mar 2020) (15 U.S.C. 644(r)).
☐ (26) 52.219-33, Nonmanufacturer Rule (Sep 2021) (15 U.S.C. 637(a)(17)).
☒ (27) 52.222-3, Convict Labor (Jun 2003) (E.O.11755).
☐ (28) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (Jan 2020)
(DEVIATION JUL 2020) (E.O.13126).
☒ (29) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
☒ (30) (i) 52.222-26, Equal Opportunity (Sep 2016) (E.O.11246).
☐ (ii) Alternate I (Feb 1999) of 52.222-26.
☒ (31) (i) 52.222-35, Equal Opportunity for Veterans (Jun 2020) (38 U.S.C. 4212).
☐ (ii) Alternate I (Jul 2014) of 52.222-35.
☒ (32) (i) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) (29
U.S.C.793).
☐ (ii) Alternate I (Jul 2014) of 52.222-36.
☒ (33) 52.222-37, Employment Reports on Veterans (Jun 2020) (38 U.S.C. 4212).
☒ (34) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act
(Dec 2010) (E.O. 13496).
☒ (35) (i) 52.222-50, Combating Trafficking in Persons (Nov 2021) (22 U.S.C. chapter 78 and E.O. 13627).
☐ (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter78 and E.O. 13627).
☒ (36) 52.222-54, Employment Eligibility Verification (Nov 2021). (Executive Order 12989).
(Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
☐ (37) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
☐ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
☐ (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun 2016) (E.O. 13693).
☐ (39) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Jun 2016) (E.O. 13693).
☐ (40) (i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514).
☐ (ii) Alternate I (Oct 2015) of 52.223-13.
☐ (41) (i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (Jun 2014) (E.O.s 13423 and 13514).
☐ (ii) Alternate I (Jun 2014) of 52.223-14.
☐ (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (May 2020) (42 U.S.C.
8259b).
☐ (43) (i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (Oct 2015) (E.O.s 13423 and 13514).
☐ (ii) Alternate I (Jun 2014) of 52.223-16.
☒ (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Jun 2020) (E.O. 13513).
☐ (45) 52.223-20, Aerosols (Jun 2016) (E.O. 13693).
☐ (46) 52.223-21, Foams (Jun 2016) (E.O. 13693).
☐ (47) (i) 52.224-3 Privacy Training (Jan 2017) (5 U.S.C. 552 a).
☐ (ii) Alternate I (Jan 2017) of 52.224-3.
☐ (48) 52.225-1, Buy American-Supplies (Nov 2021) (41 U.S.C. chapter 83).
☐ (49) (i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (Nov 2021)
(DEVIATION JUL 2020) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, 19 U.S.C. chapter 29 (sections 4501-4732), Pub.
L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
__ (ii) Alternate I (Jan 2021) of 52.225-3.
☐ (iii) (ii) Alternate II (Jan 2021) (DEVIATION JUL 2020) of 52.225-3.
☐ (iv) (iii) Alternate III (Jan 2021) of 52.225-3.
☐ (50) 52.225-5, Trade Agreements (Oct 2019) (DEVIATION JUL 2020) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
☒ (51) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
☐ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
☐ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C.
5150).
☐ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).
☐ (55) 52.229-12, Tax on Certain Foreign Procurements (Feb 2021).
☐ (56) 52.232-29, Terms for Financing of Purchases of Commercial Items (Nov 2021) (41
U.S.C.4505, 10 U.S.C.2307(f)).
☐ (57) 52.232-30, Installment Payments for Commercial Items (Nov 2021) (41 U.S.C.4505, 10
U.S.C.2307(f)).
☒ (58) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (Oct
2018) (31 U.S.C. 3332).
☐ (59) 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award
Management (Jul 2013) (31 U.S.C.3332).
☐ (60) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C.3332).
☐ (61) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).
☐ (62) 52.242-5, Payments to Small Business Subcontractors (Jan 2017) (15 U.S.C. 637(d)(13)).
☐ (63) (i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov 2021) (46 U.S.C. 55305 and 10 U.S.C. 2631).
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
Contracting Officer check as appropriate.] ☒ (1) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter 67).
☒ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor (29 CFR Part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C.5341 or 5 332.
☐ (ii) Alternate I (Apr 2003) of 52.247-64.
☐ (iii) Alternate II (Nov 2021) of 52.247-64.
http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3
This Statement is for Information Only: It is not a Wage Determination
Employee Class Monetary Wage-Fringe Benefits
Airplane Pilot, GS-12 $36.29 + 25% FB
Aircraft Co-Pilot, GS-11 $30.28 + 25% FB
Aircraft Mechanic – Journeyman, GS-11 $30.28 + 25% FB
Aircraft Mechanic – Junior, GS-9 $25.02 + 25% FB
Aircraft Mechanic – Helper, GS-6 $18.41 + 25% FB
Service Truck Driver, GS-5 $16.52 + 25% FB
☒ (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price
Adjustment (Multiple Year and Option Contracts) (Aug 2018) (29 U.S.C. 206 and 41 U.S.C.
chapter 67).
☐ (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
☐ (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) (41 U.S.C. chapter 67).
☐ (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (May 2014) (41 U.S.C. chapter 67).
☒ (7) 52.222-55, Minimum Wages Under Executive Order 13658 (Nov 2020).
☒ (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2017) (E.O. 13706).
☐ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Jun 2020) (42
U.S.C. 1792).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract, and does not contain the clause at 52.215-2, Audit and Records-Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the dispute’s clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause-
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) (41 U.S.C.
3509).
(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(iii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Nov 2021) (Section 1634 of Pub. L. 115-91).
(iv) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(v) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C.637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds the applicable threshold specified in FAR 19.702(a) on the date of subcontract award, the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(vi) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
(vii) 52.222-26, Equal Opportunity (Sep 2015) (E.O.11246).
(viii) 52.222-35, Equal Opportunity for Veterans (Jun 2020) (38 U.S.C.4212).
(ix) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) (29 U.S.C.793).
(x) 52.222-37, Employment Reports on Veterans (Jun 2020) (38 U.S.C.4212).
(xi) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act
(Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.
(xii) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter 67).
(xiii) (A) 52.222-50, Combating Trafficking in Persons (Nov 2021) (22 U.S.C. chapter 78 and E.O 13627).
(B) Alternate I (Mar 2015) of 52.222-50(22 U.S.C. chapter 78 and E.O 13627).
(xiv) 52.222-51, Exemption from Application of the Service Contract Labor Standards to
Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) (41 U.S.C. chapter 67).
(xv) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (May 2014) (41 U.S.C. chapter 67).
(xvi) 52.222-54, Employment Eligibility Verification (Nov 2021) (E.O. 12989).
(xvii) 52.222-55, Minimum Wages Under Executive Order 13658 (Nov 2020).
(xviii) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2017) (E.O.
13706).
(xix) (A) 52.224-3, Privacy Training (Jan 2017) (5 U.S.C. 552a).
(B) Alternate I (Jan 2017) of 52.224-3.
(xx) 52.225-26, Contractors Performing Private Security Functions Outside the United
States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
(xxi) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Jun 2020) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xxii) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov 2021) (46 U.S.C. 55305 and 10 U.S.C.2631). Flow down required in accordance with paragraph
(d) of FAR clause 52.247-64.
(2) While not required, the Contractor may include in its subcontracts for commercial products and commercial services a minimal number of additional clauses necessary to satisfy its contractual obligations.
52.216-4 Economic Price Adjustment – Labor and Material (Jan 2017)
APPLIES TO AVIATION FUEL ONLY
(a) The Contractor shall notify the Contracting Officer if, at any time during contract performance, the rate of pay for labor (including fringe benefits) or the unit prices for material shown in the Schedule either increase or decrease. The Contractor shall furnish this notice within 60 days after the increase or decrease, or within any additional period that the Contracting Officer may approve in writing, but not later than the date of final payment under this contract.
The notice shall include the Contractor’s proposal for an adjustment in the contract unit prices to be negotiated under paragraph (b) of this clause, and shall include, in the form required by the
Contracting Officer, supporting data explaining the cause, effective date, and amount of the increase or decrease and the amount of the Contractor’s adjustment proposal.
(b) Promptly after the Contracting Officer receives the notice and data under paragraph (a) of this clause, the Contracting Officer and the Contractor shall negotiate a price adjustment in the contract unit prices and its effective date. However, the Contracting Officer may postpone the negotiations until an accumulation of increases and decreases in the labor rates (including fringe benefits) and unit prices of material shown in the Schedule results in an adjustment allowable under paragraph (c)(3) of this clause. The Contracting Officer shall modify this contract (1) to include the price adjustment and its effective date and (2) to revise the labor rates (including fringe benefits) or unit prices of material as shown in the Schedule to reflect the increases or decreases resulting from the adjustment. The Contractor shall continue performance pending agreement on, or determination of, any adjustment and its effective date.
(c) Any price adjustment under this clause is subject to the following limitations:
(1) Any adjustment shall be limited to the effect on unit prices of the increases or decreases in the rates of pay for labor (including fringe benefits) or unit prices for material shown in the Schedule. There shall be no adjustment for-
(i) Supplies or services for which the production cost is not affected by such changes;
(ii) Changes in rates or unit prices other than those shown in the Schedule; or
(iii) Changes in the quantities of labor or material used from those shown in the Schedule for each item.
(2) No upward adjustment shall apply to supplies or services that are required to be delivered or performed before the effective date of the adjustment, unless the Contractor’s failure to deliver or perform according to the delivery schedule results from causes beyond the Contractor’s control and without its fault or negligence, within the meaning of the Default clause.
(3) There shall be no adjustment for any change in rates of pay for labor (including fringe benefits) or unit prices for material which would not result in a net change of at least 3 percent of the then-current total contract price. This limitation shall not apply, however, if, after final delivery of all line items, either party requests an adjustment under paragraph (b) of this clause.
(4) The aggregate of the increases in any contract unit price made under this clause shall not exceed 10 percent of the original unit price. There is no percentage limitation on the amount of decreases that may be made under this clause.
(d) The Contracting Officer may examine the Contractor’s books, records, and other supporting data relevant to the cost of labor (including fringe benefits) and material during all reasonable times until the end of 3 years after the date of final payment under this contract or the time periods specified in subpart 4.7 of the Federal Acquisition Regulation (FAR), whichever is earlier.
52.216-19 Order Limitations (Oct 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $2,500.00, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor—
(1) Any order for a single item in excess of $2,500,000.00;
(2) Any order for a combination of items in excess of $2,500,000.00; or
(3) A series of orders from the same ordering office within 365 days that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection
52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 7 calendar days after issuance, with written notice stating the Contractor’s intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
52.216-21 Requirements (OCT 1995)
(a) This is a requirements contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies or services specified in the Schedule are estimates only and are not purchased by this contract. Except as this contract may otherwise provide, if the Government’s requirements do not result in orders in the quantities described as "estimated" or "maximum" in the Schedule, that fact shall not constitute the basis for an equitable price adjustment.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. Subject to any limitations in the Order Limitations clause or elsewhere in this contract, the Contractor shall furnish to the Government all supplies or services specified in the Schedule and called for by orders issued in accordance with the https://www.acquisition.gov/far/part-4#FAR_Subpart_4_7 https://www.acquisition.gov/far/current/html/52_216.html#wp1115057
Ordering clause. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(c) Except as this contract otherwise provides, the Government shall order from the Contractor all the supplies or services specified in the Schedule that are required to be purchased by the Government activity or activities specified in the Schedule.
(d) The Government is not required to purchase from the Contractor requirements in excess of any limit on total orders under this contract.
(e) If the Government urgently requires delivery of any quantity of an item before the earliest date that delivery may be specified under this contract, and if the Contractor will not accept an order providing for the accelerated delivery, the Government may acquire the urgently required goods or services from another source.
(f) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor’s and Government’s rights and obligations with respect to that order to the same extent as if the order were completed during the contract’s effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after September 30th, 2026.
52.217-8 Option to Extend Services (Nov 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 15 calendar days of any contract period performance period end date.
52.217-9 Option to Extend the Term of the Contract (Mar 2000)
(a)The Government may extend the term of this contract by written notice to the Contractor within 7 calendar days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 14 calendar days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b)If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c)The total duration of this contract, including the exercise of any options under this clause, shall not exceed 62 months total.
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (SEP 2013)
(a) In the performance of this contract, the contractor shall make maximum use of biobased products that are United States Department of Agriculture (USDA)-designated items unless-
(1) The product cannot be acquired-
(i) Competitively within a time frame providing for compliance with the contract performance schedule;
(ii) Meeting contract performance requirements; or
(iii) At a reasonable price.
(2) The product is to be used in an application covered by a USDA categorical exemption (see 7 CFR 3201.3(e)). For example, all USDA-designated items are exempt from the preferred procurement requirement for the following:
(i) Spacecraft system and launch support equipment.
(ii) Military equipment, i.e., a product or system designed or procured for combat or combat-related missions.
(b) Information about this requirement and these products is available at http://www.biopreferred.gov.
(c) In the performance of this contract, the Contractor shall-
(1) Report to http://www.sam.gov, with a copy to the Contracting Officer, on the product types and dollar value of any USDA-designated biobased products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30;
and
(2) Submit this report no later than-
(i) October 31 of each year during contract performance; and
(ii) At the end of contract performance.
(End of clause) http://www.biopreferred.gov/
52.222-49 Service Contract Labor Standards-Place of Performance Unknown (MAY 2014)
(a) This contract is subject to the Service Contract Labor Standards statute, and the place of performance was unknown when the solicitation was issued. In addition to places or areas identified in wage determinations, if any, attached to the solicitation, wage determinations have also been requested for the following: none. The Contracting Officer will request wage determinations for additional places or areas of performance if asked to do so in writing by 27 December 2021.
(b) Offerors who intend to perform in a place or area of performance for which a wage determination has not been attached or requested may nevertheless submit bids or proposals.
However, a wage determination shall be requested and incorporated in the resultant contract retroactive to the date of contract award, and there shall be no adjustment in the contract price.
52.223-99 Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors (OCT
2021) (DEVIATION) NOT APPLICABLE TO PERFORMANCE IN THE STATES OF
KENTUCKY, TENNESSEE, AND OHIO
(a) Definition. As used in this clause - United States or its outlying areas means—
(1) The fifty States;
(2) The District of Columbia;
(3) The commonwealths of Puerto Rico and the Northern Mariana Islands;
(4) The territories of American Samoa, Guam, and the United States Virgin Islands; and
(5) The minor outlying islands of Baker Island, Howland Island, Jarvis Island, Johnston Atoll, Kingman Reef, Midway Islands, Navassa Island, Palmyra Atoll, and Wake Atoll.
(b) Authority. This clause implements Executive Order 14042, Ensuring Adequate COVID Safety Protocols for Federal Contractors, dated September 9, 2021 (published in the Federal Register on September 14, 2021, 86 FR 50985).
(c) Compliance. The Contractor shall comply with all guidance, including guidance conveyed through Frequently Asked Questions, as amended during the performance of this contract, for contractor or subcontractor workplace locations published by the Safer Federal Workforce Task Force (Task Force Guidance) at https:/www.saferfederalworkforce.gov/contractors/.
(d) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (d), in subcontracts at any tier that exceed the simplified acquisition threshold, as defined in Federal Acquisition Regulation 2.101 on the date of subcontract award, and are for services, including construction, performed in whole or in part within the United States or its outlying areas.
52.236-7 Permits and Responsibilities (NOV 1991)
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. The Contractor shall also be responsible for all damages to persons or property that occur as a result of the Contractor’s fault or negligence. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract.
52.252-6 Authorized Deviations in Clauses (NOV 2020)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the clause.
(b) The use in this solicitation or contract of any Agriculture Acquisition Regulation (48 CFR 4 ) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.
452.211-74 Period of Performance (FEB 1988)
The period of performance of this contract is from contract award through 31 Dec 2022. Four – option years can be exercised at the Government’s discretion. If exercised, the option years will run from 1 Jan thru 31 Dec of each year, ending with a final option period from 1 Jan 2026 to 31 Aug 2026, allowing for the issuance of task orders thru 31 Aug 2026.
452.215-73 Post Award Conference (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled within 10 calendar days after the date of contract award. The conference will be held via Microsoft Teams application.
452.216-73 Minimum and Maximum Contract Amounts (FEB 1988)
During the period specified in FAR clause 52.216-18, ORDERING, the Government shall place orders totaling a minimum of Not Applicable/Requirements Contract, but not in excess of $7.5M. In the event multiple awards results from the solicitation, the total ceiling of all awarded contracts will not exceed $7.5M.
452.228-71 Insurance Coverage (NOV 1996)
Pursuant to FAR clause 52.228-5, Insurance-Work on a Government Installation, the Contractor will be required to present evidence to show, as a minimum, the amounts of insurance coverage indicated below:
(a) Workers Compensation and Employer's Liability. The Contractor is required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit worker's compensation to be written by private carriers.
(b) General Liability
(1) The Contractor shall have bodily injury liability insurance coverage written on a comprehensive form of policy of at least $500,000 per occurrence.
(c) Automobile Liability. The Contractor shall have automobile liability insurance written on a comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and 500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage or loss.
(d) Aircraft Public and Passenger Liability. When aircraft are used in connection with performing the contract, the Contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger injury. Coverage for passenger injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.
452.237-74 Key Personnel (FEB 1988)
(a) The Contractor shall assign to this contract the following key personnel: Airplane Pilot, Aircraft Co-Pilot, Aircraft Mechanics, Service Truck Driver.
(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.
Economic Price Adjustment – Jet Fuel and 100LL
(a) In order to protect the contractor and the government from significant fluctuations in the price of aviation fuel, a lump sum adjustment will be applied to the contract each year based on the actual average price per gallon versus the baseline price per gallon stipulated below. This difference in price per gallon will be multiplied by the actual number of gallons used to determine the amount of the lump sum adjustment. Separate adjustments will be made for Jet A and 100LL fuel.
(b) Actual average price per gallon will be determined by dividing the contractor’s total aviation fuel expenditures by the total gallons used.
(c) For the purposes of each yearly adjustment, the baseline price of Jet A fuel is $4.99 per gallon and the baseline price of 100LL fuel is $5.45 per gallon.
(d) The Contractor shall submit documentation regarding the actual average price per gallon with the final Task Order payment each year. All fuel receipts from performance under each Task Order must be provided with the final Task Order payment each year. All reasonable requests for supporting documentation must be made available upon the request of the Contracting Officer.
(e) The Contracting Officer shall modify this Task Order award amount based on any necessary lump sum adjustment, accounting for the fluctuation of aviation fuel price from the baseline price.
(f) Any price adjustment under this clause is…