This document is a set of Questions and Answers related to a Request for Quote (RFQ) for Abatement & Removal of Old Tile Flooring and Luxury Vinyl Installation at the USDA Forest Service Northern Research Station in Rhinelander, WI.

The key details are:

  • The solicitation number is 12444824Q0023 and it is a 100% small business set-aside under NAICS code 238330 (size standard $19M).
  • The work involves asbestos tile and glue abatement, followed by luxury vinyl plank flooring installation on a concrete subfloor. The desired vinyl flooring is Karndean Van Gogh, Vintage Pine.
  • A site visit is requested by the government, and photos of the existing rooms can be provided.
  • The government confirms there is no floor leveling required, and the contractor may use mechanical or chemical methods to remove the existing mastic.
  • The government will allow the contractor to set up larger containment areas to streamline the abatement work.
  • The period of performance is 30-90 days upon contract award, with a tentative start date after September 23, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to Abate & Remove Old Tile Flooring and Luxury Vinyl Installation, newest first.
File Type Posted
12444824Q0023.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NRS Rhinelander

Questions and Answers for 12444824Q0023

Asbestos Tile and Glue Abatement with Luxury Vinyl Installation

Question 1)

I was just wondering if the Vinyl flooring contract currently up for bid can be filled with Vinyl manufactured in South Korea, and then assembled in the US. If so, I can nearly guarantee that I have a contractor for you!

Response: Yes, South Korea is part of the American trade act IAW FAR Part 25.

Question 2)

Will there be a site visit held for this project?

Also, could you provide any pictures/descriptions of the wall/room colors so we can provide the best options for flooring color? Unless you prefer for us to send them regardless of room color.

Response: I would like to have in person site visit if possible, but I can provide photos of rooms that need tile replaced with sample of flooring to be installed.

Question 3)

In regards to the abatement can you let me know what’s beneath the tile rather its concrete or wood? How can I set up a site visit for abatement quote? Also the color of vinyl?

Response: The subfloor is all concrete. The vinyl we want to standardize our building with is called Karndean Van Gogh, Vintage Pine

Question 4)

1. Is there a lot of leveling to be done with the thin set glue from the previous tile? Will the flooring contractor need a large grinder to get the old tile and glue removed?

2. I assume the LVP is floating, not glued to the floor. Is that correct?

Response: No leveling and glue will have to be completely moved because of the asbestos and prep for future projects.

Question 5)

Looking for a bit of clarification regarding this project. Are the only areas to receive new vinyl plank rooms 222, 223, and 224? Am I able to provide a proposal for installation of new LVP only?

Response: No, 1 contracted can sub out the removal and then do the flooring.

In accordance with Section B of the Solicitation, “One award will be made from this solicitation, contractors must submit pricing for all items.”

Question 6)

Will the removal of mastic require chemical solvent or mechanical methods? That is up to the contractor in past mechanical was used.

Is there any other floor finished over the floor tile such as carpet? Main entryway is carpet that need to be removed and prepped it is 10.5 ft X 25 ft.

Are there operable windows throughout these areas we could use to vent out of? The offices have operating windows plus there are doors to outside building on each end and in middle complex.

Do we have access to an elevator to move equipment up and down? Yes

Would we be able to take all of 204 & 242 to make one containment? Yes

Would we be able to take the entire 231 hallway with the adjoining rooms as one large containment? Yes

Will third party air clearances be required for each of the containments? No

When do they anticipate this work to start? After 23 September 2024