12444724Q0003DRAFT_Statement of Work_SRS RTP Janitorial_20Dec23.docx

DOCX document 65 KB Posted

Attached to
SRS RTP Janitorial Services
Solicitation number
12444723Q0003
Issued by

About this file

This document contains a statement of work and related federal contract opportunity notice for janitorial services. The statement of work outlines the technical requirements for providing janitorial cleaning services at three buildings totaling approximately 15,528 square feet occupied by the USDA Forest Service Southern Research Station in Research Triangle Park, North Carolina. Services include daily, weekly, monthly, quarterly, semi-annual, and annual cleaning tasks such as emptying waste containers, vacuuming, mopping, cleaning and disinfecting restrooms and other areas. The federal contract opportunity is for the janitorial services defined in the statement of work, to be awarded as a one year base contract with four one-year option periods. A mandatory site visit will be held on January 17, 2024 and the contract requires the use of biobased products.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Statement of Work Janitorial Services USDA US Forest Service Research Triangle Park, North Carolina 27709

29 December 2023

Contents

Project3
General Information3
1.0 Scope of Work3
2.0 Background3
Contractor Requirements3
3.0 Technical Requirements / Tasks3
4.0 Government Furnished4
5.0 Deliverables / Schedule5
6.0 Contractor’s Key Personnel5
7.0 Security Requirements5

Project Janitorial Services for SRS-RTP Lab

General Information The SRS-RTP Lab is part of the USDA Forest Service Southern Research Station (SRS) was established in 1962 and is located on the 28-acre between Durham, Raleigh, and Chapel Hill (the “Triangle”). The Triangle is a large, rapidly growing metropolitan center with more than 2 million residents. The region often ranks among the best places to live in the US. It hosts several major leading universities, including Duke University, North Carolina Central University, North Carolina State University, and the University of North Carolina at Chapel Hill. It is also home to large R&D facilities of several federal agencies and private sector firms in tech, pharmaceuticals, biotechnology, ag biotech, and several major medical centers.

1.0 Scope of Work

Provide janitorial cleaning for three separate buildings totaling approximately 15,528 square feet. The contractor shall furnish all labor, supplies, materials, equipment, transportation, incidentals, and supervision necessary to perform janitorial services at the USDA Forest Service, Southern Research Station, 3041 East Cornwallis Road, Research Triangle Park, NC 27709 in accordance with the terms, specifications, and provisions of this contract. All cleaning supplies used for this contract will be in accordance with the Sustainable Acquisition Policy (FAR 23.1).

2.0 Background

The main office building is a two-story structure with five (5) entrances, one (1) stairwell, and three (3) restrooms. The “Head-House” building is a two-story structure with nine (9) entrances, one (1) stairwell, and two (2) restrooms. The Forest Science & Assessment building is a one-story with two (2) entrances and two (2) bathrooms. Approximately 50 individuals work in all three buildings.

2.1 Definitions

As used throughout this contract, the following terms shall have the meaning set forth below.

Clean – Clean shall be defined as free of dirt, dust, spots, streaks, stains, smudges, litter, debris, and another residue.

Contracting Officer (CO) – The Contracting Officer is a person with the authority to enter, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.

Contractor – The term Contractor as used herein refers to both the prime contractor and any sub- contractors. The prime Contractor shall ensure that his/her subcontractors comply with the provisions of this contract.

Contracting Officer Representative (COR) – A Government Employee that is the Contracting Officer’s representative designated by the Contracting Officer.

Contractor Representative– A foreman or superintendent assigned in writing to represent the Contractor.

Waste Containers – Waste containers are defined as trash receptacles, waste baskets, trash cans, wastepaper baskets, or any container holding trash, paper, or refuse of any type.

Sustainable Acquisitions Products that are energy-efficient, water-efficient biobased, environmentally preferable, non-ozone depleting, and products made with recovered material.

Quality Assurance (QA) A method used by the Government to provide some measure of control over the quality of purchased goods and services received.

Regular Working Hours Contractor will perform the required Custodial services after the Government's regular (normal) working hours of (7:30 a.m. – 4:00 p.m., Monday through Friday, except Holidays) on a schedule that is mutually acceptable to contractor and the COR.

Recyclables. Any plastic, paper, metal, or other materials that may be recycled locally free of charge at the local recycling centers, SRS-RTP Lab is responsible for removing these items from the premise.

Contractor Requirements

3.0 Technical Requirements / Tasks

The Contractor shall provide all labor, cleaning supplies, supervision, tools, materials, equipment, and transportation necessary to provide custodial services in accordance with this specification.

Custodial service applies to all designated spaces including, but not limited to, office and administrative spaces/offices, halls, stairways, restrooms, work areas, entrance ways, lobbies, storage areas. Contractor is to furnish their own cleaning materials, machines, to perform a full range of janitorial services in the:

Main Building (7,228 gross square footage – GSF) FSAC Building (5,700 gross square footage – GSF) Head House Building (2,600 square footage – GSF) Note* Head House basement square footage is not included in this computation.

In accordance with the requirements and specifications listed below. All work shall be accomplished outside normal working hours (7:30 a.m. – 4:00 p.m., Monday through Friday, except Holidays) on a mutually acceptable schedule to the Contractor and the COR.

The following requirements shall be performed in accordance with commercial cleaning standards. Services are broken down into 1. daily, weekly, and monthly. 2. Quarterly 3. Semi-annual 4. Annual. Acceptance will be based on the performance standards listed in section 4.0.

3.0 Daily, weekly, and monthly tasks.

3.1.1 Empty, then re-line all waste containers every scheduled service. Clean/disinfect container as needed. (Recycle containers are not included) Leaving clean spare bags in bottom on container. (Daily)

3.1.2 Replace and replenish all paper products and soap/disinfectant dispensers. (Weekly)

3.1.3 Vacuum, sweep, mop, and disinfect all floors and carpets which includes stairways every scheduled service. (Daily)

3.1.4 Clean and disinfect all toilets, urinals, patricians, clean mirrors, sinks, and bathroom fixtures. This includes the outside areas of the toilet or urinals in addition to the handle, seat, tank, and lid. (Daily)

3.1.5 Clean and disinfect all counters and work surfaces, inclusive of all items and areas that are routinely touched such as door handles, door plates, light switches, etc. (Daily)

3.1.6 Kitchen areas: Clean disinfect/scour on all features including sink, microwave, coffee maker, toaster, counter tops, and refrigerator handles/doors. (Daily)

3.1.7 Dust all horizontal surfaces of furniture and partitions in offices and lobby areas (Weekly)

3.1.8 Clean all glass interior office doors in all buildings. (Weekly)

3.1.9 Remove cobwebs in offices and hallways up to 12’0 (Monthly)

3.1.10 Clean and disinfect all drinking fountains. (Daily)

3.1.11 Sweep outside doorway entrances at Main Bldg. removing cobwebs, trash, dirt, or any other objects. (Weekly)

3.2 Quarterly Tasks (April, July, October, and January)

The following tasks shall be completed quarterly throughout each of the building.

3.2.1 Clean interior windowpanes of dust or debris in all office buildings and in the front office and entry of the FSAC Bldg.

3.2.2 Clean baseboards in all office buildings.

3.3 Bi-Annually

The following tasks shall be completed twice yearly throughout the specific buildings indicated below. Preplanning and coordination with COR are essential.

3.3.1 Clean, Strip, Wax and buff all tile and laminate floors has required by their specific commercial floor type.

3.3.2 Deep clean/shampoo all rugs and carpeted walking areas using the specific commercial cleaning requirement for them.

3.4 Yearly

The following tasks shall be completed yearly throughout each of the buildings. Preplanning and coordination with COR are essential for this task.

3.4.1 Clean all interior and exterior windows yearly ridding them of debris, dust, streaks, or smudges in all three buildings.

4.0 Government Furnished

The government will provide a closet for storage of supplies and equipment. The Contractor shall be responsible and accountable for taking adequate precautions to prevent fire hazards, odors, and vermin. The Contractor shall be held responsible. The contractor shall maintain this space in a neat and orderly condition. No trash or recycling will be stored in the closet. No flammable or explosive liquids will be stored in the building. The Government will not be responsible for damage or loss to the Contractor’s property while in storage on Government premises.

4.1 Utilities

The Government will supply all utilities to support the assigned work area.

4.2 Trash

The Government will supply a dumpster in a designated exterior location.

4.3. Storage Closet.

The Government will furnish an unsecured area for storage of Contractor furnished supplies and equipment. The Contractor shall maintain this closet to ensure it is safe, clean, and organized. No hazardous materials are to be stored in these facilities.

5.0 Deliverables / Schedule

Deliverable
Objective
Due
Deliver-To
Complete list of the name, address, social security number, date of birth and work phone of each employee involved in the performance of this contract.
Process USDA background checks for all on-site contractor personnel.
Within ten calendar days of contract award or a new employee being selected for work on this contract
Designated Government PIV Sponsor

Biobased Report (copy)

Report purchases of Biobased products in the System for Award Management (SAM)

By Oct 30 for the prior fiscal year (Oct. 1 - Sep. 30) ending the performance period of the contract base period and for each option year, if exercised

Contracting Officer (CO)

6.0 Contractor’s Key Personnel

Not Applicable

7.0 Security Requirements

The Contractor shall be responsible for safeguarding all Government property provided for Contractor use. At the close of each work period, the government facilities, equipment, and materials shall be secured in a manner designated by the government.

7.1 Key Control. The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer. Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.

7.1.1 Lost keys shall be reported to the COR and the CO. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks. In the event a master key is lost or duplicated, the contractor will be responsible for replacement of all locks and keys for that system/facility.

7.1.2 Keys and Building Access Codes

Keys and building access codes will be provided by the COR. It is the Contractor’s responsibility to keep keys in a safe location and return keys as required by the COR. If the Contractor fails to return keys within two weeks of end of contract or upon determination that keys have been lost, the Government reserves the rights to change all door locks and withhold said expenses from the Contractor’s pay. Contractor shall control keys and not allow duplication of facility keys. Duplication of keys issued may result in termination for cause of contract if CO determines facility security has been compromised.

7.2 Contractor Background Checks

Background checks are required to comply with Presidential Directive HSPD-12 that requires “for unescorted entry into a federal facility, the individual will have a background investigation on file.” Within ten calendar days of contract award or a new employee being selected for work on this contract, provide a complete list of the name, address, social security number, date of birth and work phone of each employee involved in the performance of this contract. Information shall be submitted only to the identified Government PIV Sponsor.

7.3 Contractor Mandatory Training

Training requirement for contractor personnel with unescorted access. The contractor must ensure their employees (including subcontractor personnel) complete the training course(s) listed below in the frequency identified. The contractor must maintain records of course completion and provide them to the Contracting Officer or Contracting Officer Representative upon request.

Course Name
Frequency (Once, Quarterly, Annually, etc.)
Method of Training
Length of Training
Completion Date
Understanding and Interrupting Unconscious Bias
Annually
AgLearn
90 minutes
90 days after assignment in AgLearn
Anti-Harassment Training: Identifying and Preventing Workplace Harassment
Annually
AgLearn
60 minutes
90 days after assignment in AgLearn
Information Security Awareness
Annually
AgLearn
60 minutes
1 year since last completion date
USDA Records Management
Annually
AgLearn Or Paper- based
60 minutes
60 days after assignment
Section 508
Annually
AgLearn
60 minutes
45 days after assignment

image1.png

File details come from the government source that posted it. Updated .