Questions and Answers.docx
DOCX document 19 KB Posted
- Solicitation number
- 12444627Q0003
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Questions and Answers document addressing vendor inquiries regarding a fire hydrant repair/replacement project at Midewin National Tallgrass Prairie, managed by the Department of Agriculture Forest Service. The document clarifies project scope, site conditions, and testing requirements for the RFQ solicitation 12444627Q0003, a Total Small Business Set-Aside with a $45M size standard under NAICS code 237110. The government has determined the work to be a service rather than construction, so Davis Bacon Wage Rates do not apply. Vendors are encouraged to conduct self-directed site visits to evaluate existing conditions, as no official site visit is scheduled; the hydrant is located at the Supervisor's Office near the machine shed at the administrative site, which is not in a contaminated or restricted soil zone.
The testing and documentation requirements are comprehensive and include visual inspection (verifying correct model installation, plumb orientation, breakaway flange assembly, nozzle caps, operating nut function, and proper grading/drainage), hydrostatic/leak inspection with the hydrant closed, full operational testing to confirm proper opening and closing with adequate flow, drainage verification to ensure the dry-barrel hydrant empties completely, basic hydrant flow testing to measure static and residual pressure and document estimated GPM, and main valve closure testing to confirm proper sealing. Required documentation includes hydrant manufacturer and model, installation date, burial depth, all test results, drainage verification confirmation, warranty information, and photographs before backfill and after installation. The project timeline extends into late December with potential flexibility for final grading and seeding if ground conditions warrant deferral to spring; Midewin will handle water shut-off operations during replacement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001.pdf | ||
| Map.pdf | ||
| Attachment B Submission Package Revised.docx | DOCX document | |
| Attachment A Statement of Work.pdf | ||
| Attachment B Submission Package.docx | DOCX document | |
| Attachment C Wage Determination.pdf | ||
| 12444627Q0003 RFQ Hydrant Replacement MDW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers
Q1 - Hydrant details: could you share the make and model of the existing hydrant (or any required make), the main valve size, nozzle configuration and thread type, and the depth of bury?
A1 - We do not have that information. Vendors are encouraged to visit the site for evaluation.
Q2 – When is the site visit?
A2 – There is no official site visit. Vendors are encouraged to visit the site on their own for evaluation (see attached Map.)
Q3 - Water main and valve: what is the size and material of the main and lead at this location, and is the auxiliary valve to be replaced as well as the hydrant?
A3 - The valve will need to be replaced as stated in the SOW. Additional information is unavailable.
Q4 - Water shut-off: who operates the water system serving the hydrant, and will the Government or the utility handle isolating the line during the work?
A4 – Although the system is provided by the city, Midewin has a shut off valve and will turn off the water during replacement.
Q5 - Location: could you confirm where the hydrant is within Midewin (for example, the building or road it serves)?
A5 - The hydrant is located at the Supervisor’s Office. It is just outside the machine shed and near a travel path (see attached Map.)
Q6 - Is this spot anywhere near the old Army areas where we'd need to worry about ordnance or contamination when we dig?
A6 - This is at our admin site and NOT in a contaminated or restricted soil zone.
Q7 - With the work window running into late December, will there be any flexibility if the ground is frozen? For example, could the final grading and seeding wait until spring?
A7 – Yes, we could be flexible depending on conditions.
Q8 - Will you need any testing after it's installed (pressure, disinfection, flow test)?
A8 – Yes, the following testing will be required:
1. Visual Inspection Verify:
1. Correct hydrant model installed.
1. Hydrant plumb and oriented correctly (pumper nozzle facing access route).
1. Breakaway flange properly assembled.
1. Nozzle caps installed and lubricated.
1. Operating nut turns smoothly.
1. Grade and drainage around hydrant are acceptable.
1. Hydrant is painted and identified per local standards.
2. Hydrostatic/Leak Inspection With the hydrant closed:
1. Slowly charge the hydrant from the main.
1. Inspect for leaks at:
1. Base flange
1. Bury section joints
1. Nozzle joints
1. Bonnet
1. Operating stem area No visible leakage should occur.
3. Full Operational Test Open the hydrant fully and verify:
1. Hydrant opens completely.
1. No unusual grinding, binding, or free-spinning.
1. Adequate flow from outlets.
1. Hydrant fully closes.
1. No leakage through nozzle caps after closure.
For a Mueller Super Centurion 250, operators should typically open the hydrant fully rather than partially to avoid erosion damage.
4. Drainage Test After shutting the hydrant:
1. Remove a nozzle cap.
1. Observe water level inside the barrel.
1. Verify the barrel drains completely.
A dry-barrel hydrant that does not drain can freeze and fail.
Common acceptance criterion:
1. Water should begin draining immediately and substantially empty within a reasonable period (often 15-60 minutes depending on soil conditions and barrel size).
5. Flow Test Perform a basic hydrant flow test:
1. Measure static pressure.
1. Measure residual pressure while flowing.
1. Document estimated GPM.
This confirms:
1. Hydrant is connected properly.
1. No valve obstruction exists.
1. Available fire flow is adequate.
6. Main Valve Closure Test After flowing:
1. Close hydrant fully.
1. Wait several minutes.
1. Remove a cap carefully.
1. Confirm the main valve is sealing and there is no continuing flow into the barrel.
Documentation Required
1. Hydrant manufacturer and model.
1. Installation date.
1. Burial depth.
1. Test results.
1. Confirmation that drainage was verified.
1. Warranty information.
· Photographs before backfill and after installation.
Q9 – This appears to be construction. Do Davis Bacon Wage Rates apply?
A9 – The government has determined this repair to be a service rather than construction. Davis Bacon does not apply. Refer to the attached Wage Determination.