SCHEDULE OF ITEMS - TOUMEY NURSERY SEEDLING SHIPPING.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
JW TOUMEY NURSERY SEEDLING SHIPPING
Solicitation number
12444625Q0017
Issued by

About this file

The document is a Schedule of Items for seedling shipping and transportation for the JW Toumey Nursery, covering multiple National Forests in Minnesota, Wisconsin, and Michigan. The solicitation (No. 12444625Q0017) requires a contractor to transport tree seedlings from the nursery to various cooler sites, with specific delivery details for seven different forest regions: Chippewa, Superior, Huron-Manistee, Hiawatha, Chequamegon-Nicolet, and Badoura State Nursery. The performance period is expected to be from mid-April through the end of May, contingent on weather conditions, with staggered truckload schedules ranging from 2-10 day intervals depending on the forest region.

Key operational requirements include estimated one-way mileages for each truckload, drop-off point specifications, and provisions for additional services such as wait time billing and refrigerated trailer rentals. The solicitation emphasizes vendor flexibility, requesting quotes that demonstrate adaptability in delivery schedules and truck availability. Vendors must verify estimated mileages, factor in wait times, and provide hourly rates for excess wait times and weekly rates for refrigerated trailers. The opportunity is issued by the Department of Agriculture Forest Service and seeks a transportation provider capable of precisely executing the complex seedling distribution logistics across multiple forest locations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF ITEMS - J W TOUMEY NURSERY - SEEDLING SHIPPING / TRANSPORTATION

Line ItemForest / TruckloadESTIMATED Drop-off PointsEst One-Way Mileage per TruckloadCost per Truckload
Drop #1Drop #2Drop #3Drop #4
0001Chippewa NF - First Truckload early April (before lifting begins); Remaining truckloads at 2-4 day intervals (after lifting begins).
0001AChippewa 1Deer RiverBlackduck308
0001BChippewa 2Deer RiverWalker315
0001CChippewa 3Deer RiverBlackduck308
0001DChippewa 4Deer RiverWalker315
0001EChippewa 5Deer RiverBlackduck308
0001FChippewa 6Deer RiverWalker315
0001GChippewa 7Deer RiverBlackduck308
0001HChippewa 8Deer RiverWalker315
0001IChippewa 9Deer RiverBlackduck308
0001JChippewa 10Deer RiverWalker315
Total Chippewa$0.00
0002Superior NF - First two(2) truckloads early April (before lifting begins); Remaining truckloads in 5-7 day intervals (after lifting begins).
0002ASuperior 1LaurentianSand LakeLaCroixKawishiwi315
0002BSuperior 2IsabellaTofteGunflint308
0002CSuperior 3LaurentianLaCroixKawishiwi315
0002DSuperior 4IsabellaTofteGunflint308
Total Superior$0.00
0003Huron-Manistee NF - Truckloads will occur 8-10 day intervals (after lifting begins).
0003AHuron-Manistee 1Glennie391
0003BHuron-Manistee 2Glennie391
0003CHuron-Manistee 3Glennie391
Total H-M$0.00
0004Hiawatha NF - Truckloads will occur every 4-6 days (after lifting begins).
0004AHiawatha 1Rapid RiverRaco268
0004BHiawatha 2Raco246
Total Hiawatha$0.00
0005Chequamegon-Nicolet NF - Truckloads will occur every 6-8 days (after lifting begins).
0005AChequamegon-Nicolet 1LakewoodGuard StationWashburn306
0005BChequamegon-Nicolet 2Lakewood94
Total C-N$0.00
0006Baboura State Nursery - Truckload timming will be determined after Lift and Pack begins.
0006ABadoura 1Badoura (Akeley, MN)310
Total Badoura$0.00
0007Est Wait time in Excess of amount shown in SOWHourly Cost1 hour
0008Drop-Trailer: Refridgerated Trailers left at delivery locations or NurseryWeekly Cost1 week
Total of Items 1-5$0.00
NOTES
1 - PERIOD OF PERFORMANCE IS EXPECTED TO BE ON OR ABOUT MIDDLE OF APRIL THROUGH END OF MAY, DEPENDENT ON WEATHER CONDITIONS
2 - Mileages are estimated, vendors are responsible to verify mileage prior to providing per truckload price.
Estimated wait times (as shown in Statement of Work) should be factored into your total bid price for each load.
An hourly cost for wait times in excess of what is shown in the SOW is to be included on line item 0007 in the schedule above.
A weekly cost for refrigerated trailers to be left on site. This need would be to enhance existing cooler capicity at delivery locations and/or
Nursery or as backup for cooler breakdowns. Be sure to cover any details on this in your technical proposal (line item 008 in schedule above).
3 - When submitting a quote, please include a statement on flexibility that you can provide in the delivery schedule along with carrier(s) that might be
used. Preference will be given to proposals that can show they can provide flexibility and guarantee trucks will be available to meet determinate timeframes

File details come from the government source that posted it. Updated .