Schedule of Items.xlsx
XLSX spreadsheet 17 KB Posted
- Solicitation number
- 12444622Q0046
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation 12444622Q0046 Culverts.pdf | ||
| Attachment 1 - Item 14 Culvert Detail.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Forest Service CHEQUAMEGON-NICOLET NF
EAST ZONE
SCHEDULE OF ITEMS USFS Loan District Office 4978 Hwy 8 West Laona, WI 54541
| Type, Size, and Length | Cost per LF | LF | Individual Culvert Cost | Qty. | Cost(w/o bands or lugs) | Cost per Band | # of Bands | Total Cost of Bands | Cost/ Lifting Lug | # of Lifting Lugs | Total Cost of L. Lugs | Pre- Assembly | Total Cost incl. accessories | ||
| Furnish and deliver pipe as indicated below: | |||||||||||||||
| ALL PIPE ARE REQUIRED TO MEET MINIMUM WISDOT LOAD RATING | |||||||||||||||
| Item #1 | |||||||||||||||
| 57"W x38"H x 38' poly coated pipe arch, with 2:1 step bevel | |||||||||||||||
| (UNT NF Thunder - FR2101 - West) | 38 | 1 | 2 | ||||||||||||
| Item #2 | |||||||||||||||
| 36"X42' poly coated CMP (round) | |||||||||||||||
| (UNT Rock Creek - FR2383) | 42 | 1 | |||||||||||||
| Item #3 | |||||||||||||||
| 42"W x29"H x 36' poly coated pipe arch, with 2:1 step bevel | |||||||||||||||
| (UNT NF Thunder - FR2101 - East) | 36 | 1 | |||||||||||||
| Item #4 | |||||||||||||||
| 48"X40' galvanized CMP (round) with beveled ends | |||||||||||||||
| (Boneyard Stock Pipes) | 40 | 4 | |||||||||||||
| Item #5 | |||||||||||||||
| 83"x57"x46' poly coated pipe arch, with 2:1 step bevel | |||||||||||||||
| (UNT Stevens Creek - FR2423) | 46 | 1 | 2 | ||||||||||||
| Item #6 | |||||||||||||||
| 83"x57"x38' poly coated pipe arch, with 2:1 step bevel | |||||||||||||||
| (West Allen Creek - FR2526) | 38 | 1 | 2 | ||||||||||||
| Item #7 | |||||||||||||||
| 66"W x51"H x 32' poly coated pipe arch, with 2:1 step bevel | |||||||||||||||
| (Rock Creek - FR2372) | 32 | 1 | 2 | ||||||||||||
| Item #8 | |||||||||||||||
| 73”W x55”H x 38’L, poly coated pipe arch, with 2:1 step bevel | |||||||||||||||
| (Snowfalls Creek - FR2330) | 38 | 1 | 2 | ||||||||||||
| E ZONE TOTAL CULVERTS | 11 | TOTAL COST E. ZONE |
Forest Service CHEQUAMEGON-NICOLET NF
WEST ZONE
SCHEDULE OF ITEMS Park Falls District Office 1170 4th Ave. South Park Falls, WI 54552
| Type, Size, and Length | Cost per LF | LF | Individual Culvert Cost | Qty. | Cost (w/o bands or lugs) | Cost/ Band | # of Bands | Cost of Bands | Cost/ Lifting Lug | # of Lifting Lugs | Cost of Lifting Lugs | Pre- Assembly | Total Cost Incl. accessories | |
| Furnish and deliver pipe and bands as indicated below: | ||||||||||||||
| ALL PIPE ARE REQUIRED TO MEET MINIMUM WISDOT LOAD RATING | ||||||||||||||
| Item #9 | ||||||||||||||
| 15"X20' HDPE - Dual Walled | 20 | 15 | 6 | |||||||||||
| Item #10 | ||||||||||||||
| 18"X20' HDPE - Dual Walled | 20 | 6 | 3 | |||||||||||
| Item #11 | ||||||||||||||
| 24"X20' HDPE - Dual Walled | 20 | 8 | 4 | |||||||||||
| Item #12 | ||||||||||||||
| 36"X24' HDPE - Dual Walled | 24 | 8 | 4 | |||||||||||
| Item #13 | ||||||||||||||
| Aluminum Box Culvert 10'-6" x 5'-7" x 45' FULL INVERT |
POLY TOE-WALLS - NO HH/WW - PRE-ASSEMBLED
| (UNT SF Yellow River FR112) | 45 | 1 | |
| Item #14 | |||
| 95" x 67" x 52' poly coated pipe arch, with 2:1 step bevel and baffles |
See detail sheet C-09
| (UNT Yellow River FR1405) | 52 | 1 | 2 | |
| Item #15 | ||||
| Aluminum Box Culvert 11'-11" x 3'-7" x 35' FULL INVERT |
POLY TOE-WALLS - NO HH/WW - PRE-ASSEMBLED
| (UNT Spring Creek FR120) | 35 | 1 | |||||
| Item #16 | |||||||
| 64" x 43" x 36' poly coated pipe arch, with 2:1 step bevel | |||||||
| (Theif Lake Outlet FR118A) | 36 | 1 | 2 | ||||
| W ZONE TOTAL CULVERTS | 41 | WEST ZONE TOTAL COST | |||||
| GRAND TOTAL CULVERTS | 52 | GRAND TOTAL COST |
File details come from the government source that posted it. Updated .