C04a_Statement of Work_12444527Q0004.pdf
PDF 88 KB Posted
- Solicitation number
- 12444527Q0004
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Statement of Work (SOW) for the installation of a wildlife and rodent shield system at a federal facility.
The contractor shall provide all labor, materials, equipment, tools, transportation, and supervision necessary to install a complete wildlife and rodent shield system designed to protect facility infrastructure, equipment, and building envelopes. Work scope includes conducting a comprehensive facility vulnerability assessment to identify gaps, penetrations, vents, conduit entries, and structural features allowing wildlife intrusion; fabricating or providing wildlife and rodent-resistant shielding materials such as stainless-steel mesh, metal flashing, and reinforced covers; installing shielding components around electrical and communication conduit entries, HVAC penetrations and outdoor units, foundation vents, crawlspace access points, and other identified access points; and sealing all penetrations with pest-resistant sealants. The installed system must meet applicable building, safety, and USDA facility standards.
Contractor responsibilities include conducting a pre-installation site review with the designated facility representative, providing documentation of materials and technical specifications, maintaining a safe work environment in compliance with OSHA and federal safety guidelines, and disposing of debris according to local and federal requirements. Deliverables consist of a written pre-installation assessment report, completed installation work, a post-installation inspection with the facility representative, and a final report documenting shielded locations, materials installed, photographs of completed work, and warranty information if applicable. All work must meet professional standards, with the contractor correcting any deficiencies at no additional cost to the government. Payment will be made upon acceptance of all deliverables and completion of the installation. The government is responsible for providing site access, identifying facility-specific restrictions and security protocols, reviewing and approving the contractor's installation plan, and providing necessary power, lighting, and access.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C04_12444527Q0004.pdf | ||
| C04d_Wage Determination_12444527Q0004.pdf | ||
| C04c_Continuation of 1449_12444527Q0004.pdf | ||
| C04b_Schedule of Items_12444527Q0004.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Scope of Contract
Purpose:
This purpose of this Statement of Work is to define the tasks, responsibilities, and deliverables associated with the installation of a wildlife and rodent shield system to protect facility infrastructure, equipment, and building envelopes from damage caused by wildlife and rodents.
Scope of Work:
The contractor shall provide all labor, materials, equipment, tools, transportation and supervision required to install a complete wildlife and rodent shield system. Work includes, but is not limited to:
• Assessment of facility vulnerabilities, including gaps, penetrations, vents, conduit entries, and structural features that allow wildlife intrusion.
• Fabrication or provision of wildlife and rodent resistant shielding materials (e.g., stainless-steel mesh, metal flashing, reinforced covers).
• Installation of shielding components around:
o Electrical and communication conduit entries.
o HVAC penetration and outdoor units.
o Foundation vents and crawlspace access points.
o Any other identified wildlife and rodent access points.
• Sealing all penetrations with appropriate pest-resistant sealants.
• Ensuring system meets applicable building, safety, and USDA facility standards.
Contractor Responsibilities:
• Conduct a pre-installation site review with the designated facility representative.
• Provide documentation of materials, technical specifications, and installation methods.
• Maintain a safe work environment and follow all OSHA and federal safety guidelines.
• Dispose of debris in accordance with local and federal requirements.
• Ensure all work zones remain clean and free of hazards.
Government Responsibilities:
• Provide site access and escort where required.
• Identify facility-specific restrictions or security protocols.
• Review and approve contractor’s installation plan prior to work.
• Provide power, lighting, and access necessary for installation.
Deliverables:
• Written pre-installation assessment report.
• Completion of installation in accordance with scope.
• Post-installation inspection with facility representative.
• Final report including:
o Locations shielded o Materials installed o Photo of completed work o Warranty information (if applicable)
Quality Assurance:
All work must be completed to professional standards. The contractor shall correct any deficiencies at no additional cost to the government.
Payment:
Payment will be made upon acceptance of all deliverables and completion of the installation.
File details come from the government source that posted it. Updated .