This is a Questions and Answers document addressing site logistics and equipment specifications for a federal contracting opportunity involving UPS battery replacement work at Building 50.
The document provides critical site information for contractors preparing to deliver and install replacement batteries. The Eaton 9355-30 lighting inverter system has serial number EB094KXX03. Delivery logistics are straightforward: no loading dock is required, as batteries can be unloaded using government forklift equipment with operating hours from 8am-4pm. Batteries will be staged directly outside the UPS room by FPL, eliminating the need for contractor-provided equipment such as pallet jacks. The UPS system is located on the ground floor with only a 20-foot distance from the staging area to the installation point. No freight elevator is required, and there are no access restrictions, obstacles, narrow doorways, stairs, or protected flooring issues between the delivery point and the UPS room. Supporting photographs are provided showing the existing three-unit Eaton UPS system, internal battery modules configured in multiple cells, and battery documentation including URLA battery specifications with flat voltage ratings of 12.5-13.8V.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q1) Could you provide the serial number of the Eaton 9355-30 lighting inverter in Building 50?
A1) EB094KXX03
Q2) Kindly provide us with pictures of the lighting inverter and battery, along with the brand and model/type details for our review.
A2) Pictures Below
Q3) Is there a loading dock available, and what are its hours of operation?
A3) No dock needed. Batteries can be unloaded with our forklift. 8am-4pm
Q4) If there is no loading dock, can Government personnel receive and stage the batteries inside prior to the scheduled work?
A4) Yes. Batteries can be put right outside the UPS room by FPL
Q5) Is a pallet jack available for contractor use?
A5) Yes but won’t be needed if we stage the batteries by the UPS room.
Q6) Approximately how far is the UPS system from the delivery/drop-off or staging area?
A6) Staging area to UPS is 20 feet
Q7) What floor is the UPS system located on, and is a freight elevator available if required?
A7) Ground floor. No elevator needed
Q8) Are there any known access restrictions or obstacles between the delivery point and the UPS room, such as narrow doorways, stairs, protected flooring, or other limitations?
A8) No limitations.