SOW.docx
DOCX document 27 KB Posted
- Solicitation number
- 12444523Q0021
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3. Experience Questionnaire (Optional).docx | DOCX document | |
| 2. Monroe County SCA WD 2015-4775.txt | TXT text file | |
| 12444523Q0021.pdf | ||
| 4. FS-Schedule of Items Template (Optional).xlsx | XLSX spreadsheet | |
| 1. Hardin Ridge Vicinity Map.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
COR: Joseph Neukam Phone: (812) 269-8785 Email: joseph.neukam@usda.gov
Scope:
Contractor will perform duties relating to the operation and maintenance of the wastewater treatment plant at Hardin Ridge Recreation Area in the Hoosier National Forest. Recreational opportunities at Hardin Ridge include camping, boating, swimming, and fishing. The treatment plant serves the 210-site campground and is operational the months of April 01st through November 01st. The system is a Class 1, 0.034 MGD extended aeration treatment facility consisting of two aeration/clarification units, a sludge holding tank, Parkson DynaSand continuous backwash sand filter, ultraviolet light disinfection, phosphorus removal, post aeration, and effluent flow meter. Plant flow fluctuates considerably, peaking on weekends and holidays.
The plant operator must hold a current Class 1 wastewater treatment certification with the State of Indiana. Successful Offeror will be responsible for the operation of the wastewater treatment facility and is required to adhere to all conditions set forth in Indiana Department of Environmental Management (IDEM) permit # IN0024953. Copies of the permit may be obtained by contacting Joseph Neukam at 812-269-8785 or joseph.neukam@usda.gov. Duties include making sure all systems associated with the treatment plant are clean, maintained, and in proper operating order including but not limited to the UV lamp fixture, effluent weir, top of filter, clarifier panels, and buildup of crystalized chemical on the outside of storage barrels. In the event of an emergency, the licensed operator must be available on-site within 2 hours. Repairs and costs associated with equipment failure, lift stations, and line repair are the responsibility of the Forest Service.
The operator shall furnish all personnel, labor, equipment, material, chemicals, supplements, tools, supplies, supervision, management, and services, except as may be expressly set forth as Government furnished; and otherwise do all things necessary to or incident to perform and provide the work efforts described in this statement of work. In addition to keeping all equipment in operating order, the operator will be responsible for keeping accurate records and conducting all associated testing outlined in the permit. It is the operator’s responsibility to either test all required samples or to preserve and transport them to an approved testing facility. The Forest Service will be responsible for the cost of electricity. All other costs associated with normal operation of the treatment plant (including testing) will be incurred by the operator.
Reporting requirements include but are not limited to: PH, TSS, ammonia, phosphorous, settable solids, dissolved oxygen, temperature, and flow ratings. The operator must have the ability to interpret test results and apply them to system control. The operator must send weekly lab test data to the Contracting Officer’s Representative (COR) within 3 days of obtaining the data, or 24 hours if a permit violation is found. In the event that a response letter is required after an IDEM inspection, it will be the responsibility of the operator to submit the letter and submit a copy to the COR and contracting officer. The successful offeror will also be responsible for submission of all required paperwork during the “no discharge” November 2nd through March 31st.
Operator will be required to collect and test samples for coliforms at the beach 2 weeks prior to opening (Memorial Day) and continue weekly until 2 weeks after closing (Labor Day).
Option Line Item maybe added to Award if most advantageous to the Government:
Do a weekly inspection to make sure all 10 lift stations at Hardin Ridge Recreation Area (two pumps per station) are functional. Pump down the wastewater to a point where the pumps start sucking air, this is to clear the tank of accumulating solids. Check for leaks between the valve assembly and the discharge line. Any needed repairs will be the responsibility of the Forest Service.