Attachment 2 Revised Schedule Of Items.xlsx

XLSX spreadsheet 35 KB Posted

Attached to
Mark Twain National Forest: Vault Toilet Pumping
Solicitation number
12444522Q0022
Issued by

View the file

Other files

File Type Posted
Attachment 1 Statement of Work.pdf PDF
Attachment 2 Schedule of Items.xlsx XLSX spreadsheet
Attachment 4 Location Maps.pdf PDF
Attachment 3 Experience Questionnaire.pdf PDF
12444522Q0022.pdf PDF
Attachment 5 Wage Determination 2015_5101_ R_17.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions for Services
Labor CategoriesEnter ALL proposed labor categories
Labor RatesUse loaded Labor rates which include the percentage of overhead costs that are allocable to the contract.
TravelUse an overall estimated cost (applicable air fare, per diem, and local travel) multiplied by the estimated number of trips.
Cumulative TotalDelete total from any/all unused option periods after completing chart
Period Of PerformanceIf your period of performance for the Base and/or Option Period(s) is less than 12 Months - reflect actual month total in column header
Instructions for Supplies
ColumnsComplete all columns. If there is no serial/product number enter "N/A"
Item(s)Add/delete rows as applicable (ensure item subtotal includes amounts from added rows). Identify and group items by Brand
OptionsComplete as applicable. If the option 3 and 4 page does not apply to your requirement, do not submit with your final IGCE.
Other Direct Costs (ODCs)Itemize all applicable ODCs (such as installation or special equipment) Not all requirements will have ODCs.
TravelUse an overall estimated cost for travel. Combine elements as air fare, per diem, and local travel multiplied by the # of trips.

Services

Independent Government Cost Estimate for Services
Estimator Name:Project Title:
Date:Project Manger:
Base Period: 12 MonthsOption 1: 12 MonthsOption 2: 12 MonthsOption 3: 12 MonthsOption 4: 12 Months
Labor CategoryHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotal
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
Labor Total0$0.000$0.000$0.000$0.000$0.00
Other Direct Costs$0.00$0.00$0.00$0.00$0.00
(ODCs)

Travel $0.00 $0.00 $0.00 $0.00 $0.00

ODC/Travel Subtotal$0.00$0.00$0.00$0.00$0.00
Period Total$0.00$0.00$0.00$0.00$0.00
Cumulative TOTAL$0.00$0.00$0.00$0.00$0.00

Supplies

Schedule of Items
Contractor's Name:Project Title:MTF - CON NFRW0522 FDDS3621 Toilet Pumping Z2
Date:Project Manger:Ed Sherman
BaseOption 1Option 2Option 3Option 4
Item(s)vault toliet descriptionMax GallonsUnit CostAmountMax GallonsUnit CostAmountMax GallonsUnit CostAmountMax GallonsUnit CostAmountMax GallonsUnit CostAmount
Deer Leap Campground and River Access1 double toliet20000.00$0.0020000.00$0.0020000.00$0.0020000.00$0.0020000.00$0.00
1 Single toilet10000.00$0.0010000.00$0.0010000.00$0.0010000.00$0.0010000.00$0.00
Float Camp Campground and Day Use1 double toliet20000.00$0.0020000.00$0.0020000.00$0.0020000.00$0.0020000.00$0.00
1 double toliet20000.00$0.0020000.00$0.0020000.00$0.0020000.00$0.0020000.00$0.00
1 double toliet20000.00$0.0020000.00$0.0020000.00$0.0020000.00$0.0020000.00$0.00
1 holding tank10000.00$0.0010000.00$0.0010000.00$0.0010000.00$0.0010000.00$0.00
Dunrovin1 Single toilet10000.00$0.0010000.00$0.0010000.00$0.0010000.00$0.0010000.00$0.00
Bay Nothing1 Single toilet10000.00$0.0010000.00$0.0010000.00$0.0010000.00$0.0010000.00$0.00
Fourche Lake1 Single toilet10000.00$0.0010000.00$0.0010000.00$0.0010000.00$0.0010000.00$0.00
Watercress Campground and River Access1 double toliet20000.00$0.0020000.00$0.0020000.00$0.0020000.00$0.0020000.00$0.00
1 single toliet10000.00$0.0010000.00$0.0010000.00$0.0010000.00$0.0010000.00$0.00
Pinewoods Lake Recreation Area1 double toliet20000.00$0.0020000.00$0.0020000.00$0.0020000.00$0.0020000.00$0.00
1 double toliet20000.00$0.0020000.00$0.0020000.00$0.0020000.00$0.0020000.00$0.00
Markham Springs Recreation Area1 double toliet20000.00$0.0020000.00$0.0020000.00$0.0020000.00$0.0020000.00$0.00
1 double toliet20000.00$0.0020000.00$0.0020000.00$0.0020000.00$0.0020000.00$0.00
1 holding tank10000.00$0.0010000.00$0.0010000.00$0.0010000.00$0.0010000.00$0.00
Hendrickson River Access1 single toliet10000.00$0.0010000.00$0.0010000.00$0.0010000.00$0.0010000.00$0.00
Highway 142 Access1 single toliet10000.00$0.0010000.00$0.0010000.00$0.0010000.00$0.0010000.00$0.00
Morgan Spring1 single toliet5000.00$0.005000.00$0.005000.00$0.005000.00$0.005000.00$0.00
Riverton West1 double toliet20000.00$0.0020000.00$0.0020000.00$0.0020000.00$0.0020000.00$0.00
Riverton East1 double toliet20000.00$0.0020000.00$0.0020000.00$0.0020000.00$0.0020000.00$0.00
Boze Mill1 single toliet5000.00$0.005000.00$0.005000.00$0.005000.00$0.005000.00$0.00
Whitten River Access1 single toliet10000.00$0.0010000.00$0.0010000.00$0.0010000.00$0.0010000.00$0.00
Turner South1 single toliet10000.00$0.0010000.00$0.0010000.00$0.0010000.00$0.0010000.00$0.00
Turner North1 single toliet10000.00$0.0010000.00$0.0010000.00$0.0010000.00$0.0010000.00$0.00
Greer Campground and Day Use Area1 double toliet20000.00$0.0020000.00$0.0020000.00$0.0020000.00$0.0020000.00$0.00
1 double toliet20000.00$0.0020000.00$0.0020000.00$0.0020000.00$0.0020000.00$0.00
Greer Spring Trailhead1 double toliet20000.00$0.0020000.00$0.0020000.00$0.0020000.00$0.0020000.00$0.00
Cane Bluff River Access1 single toliet10000.00$0.0010000.00$0.0010000.00$0.0010000.00$0.0010000.00$0.00
Thomasville River Access1 single toliet10000.00$0.0010000.00$0.0010000.00$0.0010000.00$0.0010000.00$0.00
McCormack Lake1 double toliet20000.00$0.0020000.00$0.0020000.00$0.0020000.00$0.0020000.00$0.00
Falling Spring1 single toliet5000.00$0.005000.00$0.005000.00$0.005000.00$0.005000.00$0.00
Sinking Creek1 single toliet10000.00$0.0010000.00$0.0010000.00$0.0010000.00$0.0010000.00$0.00
Wolf Creek Trailhead1 double toliet20000.00$0.0020000.00$0.0020000.00$0.0020000.00$0.0020000.00$0.00
Item Subtotal$0.00$0.00$0.00$0.00$0.00
ODCs$0.00$0.00$0.00$0.00$0.00
Travel$0.00$0.00$0.00$0.00$0.00
ODC/Travel Subtotal$0.00$0.00$0.00$0.00$0.00
Period Total$0.00$0.00$0.00$0.00$0.00
Cumulative TOTAL$0.00$0.00$0.00$0.00$0.00

Sheet1

File details come from the government source that posted it. Updated .