This statement of work outlines requirements for upgrading the IT infrastructure at two buildings within the Sheffield Workstation of the Allegheny National Forest. The contractor shall provide all equipment, labor, materials and installation to upgrade network infrastructure for both the C&M Shop and Fire Office/Shop buildings located approximately 125 feet apart. Updates include installing secured IT network rooms in each building to house servers and switches. Both buildings currently lack wireless access points, which will be installed along with running conduit and cabling to connect the buildings. The statement of work provides specifications for equipment racks, power, telecommunications outlets and patch panels, cabling, grounding, backboards, and more. The contractor must also prepare as-built drawings and test results upon completion of the installation and upgrades.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY23 ANF – SHEFFIELD IT‐INFRASTRUCTURE UPGRADE

[1]

Allegheny National Forest

Bradford Ranger District

Sheffield IT‐Infrastructure Upgrade

STATEMENT OF WORK

SCOPE OF CONTRACT:

Contractor shall provide all equipment, labor, materials, tools, and other incidentals to perform all work necessary and required for the construction of the project as indicated. Two buildings at the Sheffield Workstation in Sheffield, PA need IT‐infrastructure upgrades. This site currently needs a secured, designated, IT Network room or space to house IT Servers and Switches. This central IT section will support 2 buildings. Currently, there are no wireless access points located at this facility. Both buildings will need wireless access points. Buildings are approximately 125’ apart, conduit will connect both buildings.

LOCATION:

All work will be at the Sheffield Workstation:

Sheffield Workstation

4850 U.S. Route 6

Sheffield, PA 16347

[2]

BUILDING 1 – SHEFFIELD C&M SHOP (NRM ID 84857)

EXISTING CONDITIONS: The C&M Shop currently has DSL for internet service. The building does not have any network infrastructure in place. This building will support 13 staff members during peak season.

PROPOSED ACTION: Requesting to upgrade network infrastructure and internet connection. The back wall is recommended for hosting IT Cube Cabinet, then an IT rack for space allowed. New cabling will be run from

IT cabinet to all workstations in the facility. There should be 2 data lines for each access port. Surface mounted data jacks along with vertical and horizonal wire mold could be used to decrease labor cost trying to route the new cabling. IT has recommended to have a conduit installed into the back of the building connecting Building 1 to Building 2. The distance between these buildings is 60 feet. Recommending 4‐inch conduit connect the two buildings. The conduit will extend into the FIRE SHOP Attic Space and end in the

FIRE SHOP Office Space. There will be a 2nd IT cabinet installed to wire out the workstations in their office. A fiber optic cable connection along with 6 lines shall be run between the 2 cabinets. A wireless access point

(WAP) shall also be installed.

Install a solid Copper Grounding buss bar with grounding strap cable sized for the distance it needs to run back to the facility main grounding point, 2 x12 grounding bus bar for the server rack and hardware.

Verify and install as needed adequate power for electrical. A dedicated 20 amp, 2 or 4 plug receptacle to power a 2200 UPS for the switch. This provides protection for surges and low voltage.

Verify and install appropriate equipment, as needed, to maintain 72 degrees, 24/7 when the door is closed for extended periods of unattended occupancy. Some solutions seen elsewhere have been to install exhaust fans, ducts, grills, and returns for proper ventilation and cooling.

If not able to achieve cooling, install a mini‐split AC system with independent thermostat controls.

Proper lighting is needed for IT closet.

BUILDING 2 – SHEFFIELD FIRE OFFICE/SHOP (NRM ID: 84852)

EXISTING CONDITIONS: Currently has no internet service. The building has no current network infrastructure in place. Peak Season this building will support 12 staff members.

PROPOSED ACTION: Requesting to upgrade network infrastructure and obtain an internet connection.

Conduit pathway to run from new IT Cube Cabinet in the C&M Shop to a 2nd, new IT Cube Cabinet in the

Fire Shop. New cabling will be run from 2nd IT Cube Cabinet to all workstations in the Fire Shop Office space along with Fire Shop Garage space for meetings. There should be 2 data lines for each access port.

Surface mounted data jacks along with vertical and horizontal wire mold could be used to decrease labor cost trying to route the new cabling. A fiber optic cable connection along with 6 lines shall be run between the 2 cabinets. A wireless access point (WAP) shall also be installed.

Install a solid Copper Grounding buss bar with grounding strap cable sized for the distance it needs to run back to the facility main grounding point, 2 x12 grounding bus bar for the server rack and hardware.

[3]

Verify and install as needed adequate power for electrical. A dedicated 20 amp, 2 or 4 plug receptacle to power a 2200 UPS for the switch. This provides protection for surges and low voltage.

Verify and install appropriate equipment, as needed, to maintain 72 degrees, 24/7 when the door is closed for extended periods of unattended occupancy. Some solutions seen elsewhere have been to install exhaust fans, ducts, grills, and returns for proper ventilation and cooling.

If not able to achieve cooling, install a mini‐split AC system with independent thermostat controls.

Proper lighting is needed for IT closet.

GENERAL NOTES:

All work performed shall be completed in accordance with the specifications provided and industry standards.

Recommend site visit prior to bidding.

Contractor shall provide all equipment, labor, materials, tools, and other incidentals to perform all work necessary and required for the construction of the project as indicated. Execute all work necessary to satisfy the required contract work on the designated National Forest Service buildings in accordance with the specifications and bidder’s technical proposal which is incorporated by reference.

Government shall furnish access to the facilities during the work hours as agreed upon by COR and contractor.

Prior to any earth disturbing activities, contractor shall call the Pennsylvania One Call System (800‐242‐1776) and all Oil and Gas Operators in the work area to determine locations of any underground utility lines.

All work shall be scheduled such that, at the end of a working day the project site is cleared and cleaned. If for any reason hazards are left in or adjacent to the site after normal work hours, they shall be properly signed as hazards and visibly illuminated at night.

Segments of unfinished work which may present a hazard to recreation site users or Forest Service employees may not be left overnight, weekends, or holidays.

Work hours will be during daylight hours, Monday thru Friday. No evening work, work on weekends, or Federal holidays will be allowed without approval of the Contracting Officer's Representative. There may be staff members present during the operation, so contractor shall plan accordingly.

The contractor shall be held liable and is responsible for any damage to all pipelines, trees, posts, structures, etc. caused by their personnel or equipment. Repair and/or replacement shall be at the Contractor's expense and at no additional cost to the Government.

SUPPLIES NEEDED:

(24) Data drop homeruns to patch panel testing and labeling done for each outlet

(2) Cube‐iT Wall Mount Cabinet

(2) Low Decibel, Dual Fan and Filter Kit for Cube‐iT, part #40975‐001

(2) Vertical Cabling Section for Cube‐iT, part #40970‐707 7U

(2) Horizontal Wire Management Bar for Cube‐iT, part #11837‐701

[4]

(2) Equipment Mounting Rail Kit for Cube‐iT, part #12787‐536

(1) Ground Jumpers, part #40159‐009, 9’

(2) Power Strip for Cube‐iT, part #12820‐705

(24) 7ft Patch Cords

Cat6 Patch Panel and Cat6 inserts for user workstations o Cat 6 Patch Panel – 48 ports o Cat 6 Keystones – WSI ports o Cat 6 Faceplates – WSI ports o 2 hole and/or 1 hole

Cat 6 Patch Cords o 20 ea., 3’, 5’,7’ & 10’ Fiber Patch Cords o 2 ea. single mode – 2 meter length OS2 / 9/125um fiber optic patch cords, yellow in color o 2 ea. multimode – 2 meter length Om3 / 50/125um fiber optic patch cords, aqua in color

Note: *only needed for JCC infrastructure option for UWC fire is considered

UPS

o C&M SHOP – 1ea o FIRE SHOP – 1ea

Fiber Optic wall mount enclosures o C&M SHOP – 1ea o FIRE SHOP – 1ea

Fiber optic CCH adaptor panels for enclosure o CCHCP12A9 – 1ea o CCHCP12E4 – 1ea

[5]

SPECIFICATIONS:

EQUIPMENT RACK AND CABINET

All equipment racks and cabinets will be black in color and made of aluminum metal and have an internal width of 19‐inches.

Figure 5 ‐ Typical Relay Rack and Cabinets

When installing a floor‐mounted rack or cabinet fasten the rack or cabinet to the floor and bond the rack or cabinet to the TMGB/TGB. Location of the rack or cabinet will be identified by contractor and approved by COR. All racks shall be installed with an insulating pad between the rack and the floor. Two post racks shall be secured to the wall behind them with a ladder rack.

POWER

Every electrical outlet shall be labeled with printed labels to indicate the serving power panel and breaker.

A minimum of two dedicated 120 V nominal, non‐switched, ac duplex electrical outlet receptacles, each on separate branch circuits, shall be provided for equipment power. These receptacles shall be rated at 20 Amps and be connected to a 20 AMP branch circuit.

In addition, convenience duplex outlets 120 V nominal, non‐switched, ac duplex electrical outlet receptacles shall be placed at 6‐foot intervals around the perimeter walls, at a height of 18” above the floor.

If stand‐by power is available, automatic switchover of power shall be provided.

TELECOMMUNICATIONS WORKSTATION OUTLETS AND PATCH PANELS

The standard telecommunications outlet box shall be 4” X 4” X 2 ¼” which will accommodate one or two trade size 1 conduits. For larger cabling/conduit requirements a 4 11/16” X 4 11/16” X 2 ¼” box will need to be installed. Regardless of which box is installed a mud ring to reduce the opening down to support a single gang faceplate is required.

[6]

A normal Work Area Outlet must be able to support at least four UTP cables to support telecommunications needs.

In general, all office areas must have at least two Workstation outlets. These outlet boxes shall be installed on opposing walls without a doorway, T568B is the standard for all Telecommunications jacks.

Figure 13 – T568B and Faceplates

Biscuit jacks for use with Pairgain Modems shall be equipped with a red protector to compensate for distant issues.

COPPER PATCH PANELS will be Cat 6e rated and they will be punched down pair for pair in sequential order. FMST requires the use of 24‐ and 48‐port panels typically and each project will be sized 25% larger in ports than actual number jacks being called out.

Figure 14 ‐ Category 5e 48‐Port Patch Panel

UNIVERSAL PATCH PANELS will be Cat 6 rated and they will be punched down in sequential order. 24 and

48 port panels typically and each project will be sized 25% larger in ports than actual number jacks being called out.

[7]

Figure 15 – Category 6 48‐Port Patch Panel

PATCH CORDS

White in color for voice circuits Cat 5e rated

Yellow in color for data circuits Cat 6 rated

Grey in Color for Sensor circuits Cat 5e rated

Orange in color for Wireless Network Cat 6 rated

Green in color for data connections to APC units

Blue in color for Data Crossover cables

LABELING

Universal – All outlets will be marked with a mechanical labeling kit in indelible ink markings should be located such that they are clearly visible after installation. Typically, they are marked as “001” through

“999” in sequential order. In cases of multiple TRs and multiple floors labeling will be adjusted to;

BA001

| | \ ‐ Sequential Jack number for that universal patch bay 001‐999.

| \‐‐‐‐ TR on that floor.

\‐‐‐‐‐‐‐ Floor Indicator “B” = basement. “1” = first floor, etc.

001 = Single Floor – 001 thru U999

2A001 = Multi Floor – BA001‐BA999, 1A001 thru 1A999, 2A001‐2A999, etc.

DIRECT BURIED CABLES

Copper cables will be buried a minimum of 36 inches below finished grade.

Fiber Optic cables will be buried a minimum of 42 inches below finished grade. A metallic tracer wire (min 14 AWG) will be placed with the fiber for locating purposes and will be extended into the MH, HH, or Pedestal.

Aerial is done on a case‐by‐case basis and must be pre‐approved in writing by the NEC PLANS COR prior to installation.

[8]

CABLING

Copper – A minimum of 25‐pair PE‐89, 24 AWG, 100‐ohm, solid conductor, unshielded twisted pair (UTP) cables will be run to each building to the main TR and terminate on the Building Entrance Terminal (BET). From the BET a Cat 6e plenum rated riser cable will be connected to the rack mounted Cat 6e patch panel.

Direct Buried Copper – PE‐39 (Gopher‐Resistant) or PE‐89 copper cables will be utilized buried at a minimum depth of 39” below finished grade.

Buried Service Wire – 24 AWG, 100‐ohm, solid conductor, shielded shall be used to make connections from splice cases of aerial cables to the building, or from building to building connections, they will not be used for OSP requirements of main or lateral connections. Cable will be buried at a minimum of 39” below finished grade.

Outside Conduit – Any conduit exiting the ground cover will be UV rated Schedule 40 PVC as a minimum, GST is preferred. All conduits will be placed in a trench or directional bore 36” to 42” depth to ensure a minimum coverage of 24 inches below the finished grade.

Where ducts are placed under primary paved roads, separate bores for each duct shall be accomplished to minimize undermining of the roadway spaced as closely as possible to each other.

Metallic tracer wire/tape will be placed on top of PVC conduit for locating purposes and will be extended into the HH, MH, and Pedestal.

A pull string shall be installed in all vacant conduits after final placement. A pull string will be left behind in any ducts utilized on the project. After routing cables through the conduits, the conduit shall be sealed around the cable entrances into TR with waterproof fire retardant sealer to prevent water seepage or pest infestation.

Temperature and Humidity – The ADP room shall be cooled at all times. The ambient room temperature shall be maintained between 65° to 78°F (18° to 26°C). The ambient relative humidity levels shall be maintained between 35% and 55%. The temperature and humidity controls shall be managed within the room, including point of contacts for emergency situations. The ADP room shall have access to temperature readings within the space. Air conditioning must be controlled on the weekends as needed to maintain the minimum temperature in the room.

GROUNDING

The main TR will be equipped with a dedicated building ground cable, with bus bar, to the room. Locate the TMGB at the upper left corner of the plywood backboard. All equipment Racks/Cabinets shall be grounded to the TMGB system with individual grounding cables sized in accordance (IAW) with J‐STD‐ 607‐A.

[9]

SIZING OF GROUND CABLE

TBB Length Linear m (ft.) TBB Size (AWG)

Less than 4 (13) 6

4 – 6 (14 ‐ 20) 4

6 – 8 (21 ‐ 26) 3

8 – 10 (27 ‐ 33) 2

10 – 13 (34 ‐ 41) 1

13 – 16 (42 ‐ 52) 1/0

16 – 20 (53 ‐ 66) 2/0

Greater than 20 (66) 3/0

Table 2 – Grounding cable sizing chart

Ladder sections shall be bonded together and attached to the ground bus system. Cables will be routed from the racks/cabinets along the side of the overhead cable tray and in places where the cable needs to traverse the cable tray it will be in a position that the cable has a metal strip between it and the communications cables.

Telecommunications Main Grounding Bus bar (TMGB) – A TMGB will be mounted on the Telecommunications Backboard (TBB) in the upper left‐hand corner a minimum of 6‐inches from the top and left corner in the main TR.

TMGB will be grounded with a dedicated copper cable to the main service entry panel neutral utilizing Table 2 above.

Figure 7 – Telecommunications Main Grounding Bus bar (TMGB) (top) and Telecommunications Grounding Bus bar (TGB) (bottom)

Telecommunications Grounding Bus bar (TGB) – A TGB will be mounted on the Telecommunications Backboard (TBB) in the upper left‐ hand corner a minimum of 6‐inches from the top and left corner in any additional TR. Additional TGBs can be utilized in a TR to reduce the grounding cable length as needed. TGB will be grounded with a dedicated copper cable to the TMGB utilizing Chart 1 above.

[10]

BACKBOARDS

Telecommunication backboard (TBB) will be mounted on the entire wall where the external conduits extend into the TR as a minimum. Backboard sheets shall consist of one, 1.2 m X 2.4 m X 18 mm (4’x8’x3/4”) ACX plywood backboard coated on both sides and all four edges with 2 coats of light gray fire retardant, insulating paint as a minimum. Install backboard at locations indicated “TBB” on drawing print, vertically on the long axis, 18 inches AFF.

The plywood shall reach from corner to corner. Install the plywood vertically at 18" AFF and anchor securely to wall substrate with a minimum of five (5) equally spaced fasteners along each vertical edge and down the centerline of each sheet of plywood. Fasteners must be flush with surface of backboard.

Fasteners shall be of the appropriate type for each substrate. Provide blocking or additional studs in framed walls to receive plywood backup panel fasteners.

RISER CABLING

Copper – A minimum of 25‐pair voice grade plenum rated riser cables Cat 6e, 24 AWG, 100‐ohm, solid conductor, unshielded twisted pair (UTP) cables shall be utilized. The voice grade riser cables shall originate in the main TR from the Building Entrance Terminal (BET) and extend into each TR and terminate on the Copper Cat 5e patch panel. For riser‐sizing considerations, the area will be evaluated for the appropriate riser. At a minimum, 3 pairs per 100 square feet of usable floor space shall be provided. Actual copper count is specified in each project by the NEC Plans Branch.

Figure 9 ‐ Copper Riser Cable

Fiber – A minimum of 12 strands of 9/125‐micron single mode fiber optic cable shall be installed between the main TR and any sub‐TR. Fiber will be terminated in rack mounted fiber line interface units (LIU) and equipped with SC Super PC Ceramic connectors. The fiber‐optic backbone cables shall be terminated at all locations in a rack‐ mounted fiber panel. There shall be 15‐feet of slack managed outside of the fiber panel to facilitate future re‐terminations. There shall be a minimum of 3‐feet of slack (with the outer jacket removed) managed inside the fiber panel. Actual strand count is specified in each project by the NEC Plans Branch.

Figure 10 – Riser SINGLE Mode and Multimode Fiber Optic Cable

HORIZONTAL CABLING

[11]

Data and voice cables are unshielded twisted‐pair cable, each consisting of four twisted pairs of No. 24 AWG solid conductors type CMP, Category 6.

Figure 11– Horizontal Cable

Clearances – The installation of these data and voice cables shall conform to the following clearances:

• At least 6 inches from power lines carrying 2KVA or less.

• At least 12 inches from power lines carrying from 2 to 5KVA.

• At least 36 inches from power lines carrying more than 5KVA.

• At least 6 inches from all fluorescent lights and other sources of electromagnetic interference.

Universal – (unclassified data and voice) wiring will be accomplished with a thermoplastic jacket BLUE in color plenum rated Cat 6, 4‐pair 24 AWG, 100‐ohm, solid conductor, unshielded twisted pair (UTP) cables. The cable run from the TR to the telecommunications workstation outlet shall not exceed 295 feet and contain no splices. These cables are to provide service for both voice and data communications as an integrated telecommunications system.

Sensor – wiring will be accomplished with a thermoplastic jacket color of Grey in color plenum rated Cat 5e, 4‐pair 24 AWG, 100‐ohm, stranded, unshielded twisted pair (UTP) patch cord cables. These cables follow a different set of rules for deployment and will be provided to the contractor on a project basis when needed by the NEC PLANS COR.

TELECOMMUNICATION CONTRACTOR’S OBLIGATIONS

The contractor shall furnish and install all material required for a complete system, including installation of communication cables, installation of communication outlets, and termination of all cables in the

Entrance Facility, the Equipment Room, and TR.

The contractor shall test and certify all cable and provide documented results of the testing. If any cable run tests defective, the contractor shall replace defective cable. A one‐year materials and labor warranty shall be provided on all cable and hardware installed by the telecommunications contractor.

This shall be in addition to any and all factory warranties that can be provided.

AS‐BUILT DRAWINGS AND INFORMATION

The Contractor shall prepare and submit record drawings at an appropriate scale via email and hard copy.

[12]

The record drawings shall convey the following information:

Locations and Identifiers of all work area outlets.

All horizontal pathway elements including but not limited to cable tray and conduit.

Location and identifiers of all Entrance Facilities, Equipment Rooms, TRs.

All backbone pathway elements.

Additionally, the contractor will be responsible for providing the following information concerning the horizontal cable installation:

Complete test results for each horizontal cable. The test information will be delivered in electronic format.

A cable record for each horizontal cable including the following information:

o Cable identifier.

o Termination point on the host end identified Termination point on the user end identified.

o Termination hardware used at the host end (patch panel type), Termination hardware used at the user end (outlet jack type), Cable type and manufacturer’s specification sheet for the cable.

o Connection Point (CP), Termination Point (TP), or Multi‐User Telecommunications Outlet

Assembly (MUTOA).

o Backbone and entrance fiber cable installation.

o Complete test results for each backbone fiber cable strand. This test information will be delivered in electronic format.