Questions and Answers 3 - 12444323Q0027.docx
DOCX document 20 KB Posted
- Solicitation number
- 12444323Q0027
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers 2 - 12444323Q0027.docx | DOCX document | |
| Questions and Answers 1 - 12444323Q0027.docx | DOCX document | |
| Attachment 2 - Map Package.pdf | ||
| Solicitation - 12444323Q0027 - Brush Cutting for Site Preparation Allegheny NF.docx | DOCX document | |
| Attachment 3 - Performance Evaluation Template.docx | DOCX document | |
| Attachment 4 - Wage Determination SAM.gov.pdf | ||
| Attachment 1 - Specifications and Schedule of Items UPDATED.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12444323Q0027 Questions and Answers 03-20-2023
1. Is there a budget available for this project?
a. We do not release the Government Estimate.
2. Can the period of performance be extended?
a. The period of performance cannot extend beyond the original end date due to the nature of the work.
3. For this project, are you looking for hand or mechanical felling? If it is mechanical, can a horizontal drum mulcher/masticator be used?
a. For this contract we are looking for hand felling with chainsaws/brush cutters. Drum mulchers and masticators were not analyzed for this project and would thus not be permitted due to soil and/or water concerns.
4. Is there any lopping required on any of the units?
a. There are no lopping requirements on this year’s contract. However, slash must be removed within 15 feet of the following:
| Clear R-O-W & ditch line |
| private land |
| fence maintenance trails |
| historic railroad grades |
| well openings |
| fences |
| old main skid trails |
| oil/gas lease roads |
| stream courses |
| pipelines and power lines |
| maintenance trails |
| seeps |
| wildlife openings |
| recreational trails |
| active stone pits |
5. The unit table shows a diameter limit of mostly 6" DBH and some 8" DBH to cut on the various units, however, under "General Work Description" it states "All diameter sizes of striped maple, pin cherry and buckthorn shrub will be cut in this contract." Can you clarify the DBH to be cut?
a. It does come off as confusing, there is a typo in the general work description. When referencing this in conjunction with the species to be cut (section 210), striped maple, pin cherry and buckthorn should be cut at all diameters encountered. All beech and birch greater than 12” tall and up to the diameter limit in the table will be cut.