This is a Statement of Work (SOW) for janitorial and custodial services at the Francis Marion Ranger District Office in Huger, South Carolina, issued by the US Department of Agriculture Forest Service.

The contract will be awarded as a firm fixed-price Blanket Purchase Agreement (BPA) with a base period of twelve months (03/9/2027 – 03/8/2028) and four optional twelve-month ordering periods through 03/8/2032. The facility consists of approximately 9,400 square feet of interior space, including offices, cubicles, conference rooms, restrooms, lobby areas, hallways, and a kitchen with carpeted floors, ceramic tile in restrooms, and vinyl flooring in the kitchen. Services must be performed during Government working hours (Monday–Friday, 8:00 AM–4:30 PM Eastern Standard Time), with carpet cleaning scheduled after regular hours. The contractor must submit a cleaning schedule to the Contracting Officer and Contracting Officer's Representative five days prior to BPA Call issuance, with any changes requiring fourteen days' advance notice.

Key deliverables include twice-weekly sweeping, mopping, vacuuming, trash collection, restroom resupply and disinfection, kitchen cleaning, conference room disinfection, fountain cleaning, and monthly tasks such as window cleaning, furniture surface cleaning, and high-dusting. The contractor must provide all labor, supplies, equipment (including HEPA-filtered vacuum cleaners and floor scrubbing machines), and transportation; the Government furnishes restroom paper products, hand soap, and trash can liners. The contractor must supply a qualified operations supervisor available by telephone within two hours' travel time, provide background-checked employees wearing identification badges, maintain biobased product compliance per FAR 52.223-2, and ensure all personnel handling bio-hazard cleaning are OSHA-certified. Equipment repairs must be completed within 48 hours; non-compliant work will be subject to a 24-hour cure notice followed by potential Government correction at the contractor's expense.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Statement of Work

Francis Marion Ranger District Office Janitorial Services

South Carolina

Contents Project General Information

1.0 Scope of Work

2.0 Background

Contractor Requirements

3.0 Technical Requirements / Tasks

4.0 Government Furnished

5.0 Deliverables / Schedule

6.0 Travel

7.0 Contractor’s Key Personnel

8.0 Attachment 1 – Floor Plan

Project Francis Marion Ranger District Office Janitorial Services

General Information

1.0 Scope of Work

The Contractor shall provide all labor, transportation, supplies, materials, equipment, incidentals, and management necessary to perform the custodial services described herein. All work is to be completed in accordance with the terms, specifications, and provisions of this contract. All work performed by the Contractor shall comply with all applicable laws, regulations, instructions, and commercial best practices where possible.

2.0 Background

2.1 This is services contract to provide janitorial and custodial services for the Francis Marion Ranger District Office located at 2967 Steed Creek Road, Huger, South Carolina. The facility consists of approximately 9,400 square feet of interior space, including offices, cubicles, conference rooms, restrooms, lobby areas, hallways, and a kitchen. The majority of the building is carpeted, with ceramic tile in restrooms and vinyl flooring in the kitchen.

2.2 Government Regular Working Hours: The Government's regular working hours are Monday through Friday from 0800- 1630 except federally observed holidays (see 2.4).

2.3 Contractor Hours of Performance: Unless negotiated with the Contracting Officer, janitorial services shall be performed between the hours of 8:00 AM to 4:30 PM Eastern Standard Time:

a. Cleaning shall be completed on weekdays during working hours, between 8:00 AM and 4:30 PM. Cleaning schedule shall be submitted to the Contracting Officer and Contracting Officer Representative 5 days prior to BPA Call issue, any changes to the schedule must be submitted and approved at least 14 days in advance.

b. Carpet cleaning shall be arranged with COR to be completed after the Government regular working hours

Interference with Government Personnel or Government Business will be avoided.

2.4 Federal Observed Holidays: In the event services are not provided because the facility is closed due to inclement weather, unanticipated holidays declared by the President, failure of Congress to appropriate funds, etc., the Contracting Officer shall either: a) Direct the Contractor to perform the work contractually specified over a number of immediately subsequent day(s) equal to the duration of the shutdown, or b) Forego the work and reduce payment due to the Contractor’s work not performed. The deduction rate shall be calculated on a daily basis. Appropriate adjustments will be made by the CO in the event services are provided for portions of week, or c) Reschedule the work on day(s) satisfactory to both parties. Except as noted in the schedule of work, work shall not be required on the following holidays:

• New Year's Day - 1 January

• Martin Luther King Day - 3rd Monday in January

• Washington's Birthday - 3rd Monday in February

• Memorial Day - last Monday in May

• Juneteenth (Freedom Day) – 19 June

• Independence Day - 4 July

• Labor Day - 1st Monday in September

• Columbus Day - 2nd Monday in October

• Veteran's Day - 11 November

• Thanksgiving Day - 4th Thursday in November

• Christmas Day - 25 December

When one of the above designated legal holidays falls on a Sunday, the following Monday will be observed as a legal holiday. When a legal holiday falls on a Saturday, the preceding Friday will be observed as a legal holiday. If a holiday falls on a scheduled Contractor workday, the following or preceding workday will be used to schedule the work to be accomplished.

2.5 Service Interruptions: If any services must be interrupted (even temporarily) due to maintenance of contract work, the Contractor shall notify the CO and COR at least three working days in advance. If the service is due to an emergency the Contractor shall notify the CO and COR as soon as practicable.

2.6 Type of Contract: The Government will award a firm fixed price Blanket Purchase Agreement (BPA) and issue BPA Calls for required services.

2.7 Period of Performance: The period of performance shall be for one (1) Base Period of twelve (12) months, and four

(4) 12-month ordering periods. The Periods of Performance read as follows:

Base Period: 03/9/2027 - 03/8/2028 Ordering Period One: 03/9/2028 - 03/8/2029 Ordering Period Two: 03/9/2029 - 03/8/2030 Ordering Period Three: 03/9/2030 - 03/8/2031 Ordering Period Four: 03/9/2031 - 03/8/2032

Blanket Purchase Agreement (BPA) is a standing agreement that establishes terms and pricing but does not obligate funds by itself. BPA Call is the actual order placed under the BPA—this is the action that obligates funding and authorizes the vendor to perform work. Even when a BPA is active, no work can begin until a BPA Call is issued and funded. Each individual Ordering Period would require a BPA Call and no work can begin until fully executed BPA Call on SF1449 is issued.

2.8 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation (FAR) Subpart 42.5. The CO and/or COR shall meet periodically with the Contractor to review the Contractor's performance.

2.9 Government Representatives:

2.9.1 Contracting Officer (CO): A person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.

2.9.2 Contracting Officer's Representative (COR): GTM may be assigned to this contract to monitor all technical aspects.

The COR may be authorized to perform the following functions: ensure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communication with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements (without increasing or decreasing contract scope), including Government drawings, designs, and specifications; monitor Contractor's performance and notify both the CO and Contractor of deficiencies; and provide site entry of Contractor personnel. The COR is not authorized to change any of the terms and conditions of the contract.

2.10 Contractor’s Personnel:

2.10.1 Quality Control Representative: Determined by Contractor

2.10.2 Special Qualifications: The Contractor shall ensure bio-hazard cleaning and disposal of bio-hazard materials is performed by qualified and certified personnel, as per OSHA Code of Federal Regulations, 29 CFR 1910.1030 .

2.10.3 Conduct of Personnel: The Contracting Officer may require the Contractor to remove from the job site any employee working under this contract for reasons of misconduct, security, or if they are found to be or suspected to be under the influence of alcohol, drugs, or other incapacitating agents.

2.10.4 Contractor Personnel Identification: Contractor personnel shall be easily identifiable through the display of badges or uniform. Contractor employees shall identify themselves by name and company affiliation when answering the telephone and attending meetings. All Contractor correspondence (written, facsimile, and email display) shall include their company name.

2.10.5 Security Requirements: Contractor personnel or any representative of the Contractor entering the Government facilities shall abide by all security regulations. At the close of each work period, Government facilities, equipment, and materials shall be secured. The Contractor shall announce their arrival and departure to employees who may be occupying the building. Doors shall be left locked unless otherwise instructed. If employees are working during cleaning hours, contractor shall still perform cleaning operations. Request approval of employee to vacuum in the area. Only the

Contractor's employees are allowed in the building or on the job site. The Contractor is prohibited from opening locked areas to permit entrance of persons other than the Contractor's employees.

2.11 Safety: The Contractor shall instruct employees in appropriate measures as specified by applicable provisions of the occupational Safety and Health Act, 1970, PL 91-596 (84 Stat 1590). The Government shall provide a copy of the Safety Data Sheet (SDS) for each of the products used to perform services to the Contractor within ten (10) days from the date of award. The Government shall furnish a copy of the SDS at each location where products are stored.

2.11.1 Accidents: Report any accident within 24 hours from occurrence to the COR.

2.12 Fire Protection and Prevention: All sweeping compounds, dust cloths and mop treating materials, floor oils and floor treatment materials (exclusive of waxes) shall be products which are free of any spontaneous heating capability. Listings of these products as free of this capability by the Underwriters' Laboratory Inc. or other qualified nationally recognized testing organization shall be considered as meeting these requirements. The Contractor shall not store combustible supplies including rags, paper, and other like items near possible sources of combustion such as steam pipes, high wattage lamp bulbs, and other like items.

Contractor Requirements

3.0 Technical Requirements / Tasks

Janitorial services shall be provided following the cleaning schedule as specified below:

3.1 Floor Maintenance

3.1.1 General

For all operations where furniture and equipment must be moved, no chairs, wastepaper baskets, or similar items shall be stacked on desks, tables, or window sills. Upon completion of work, all furniture and equipment must be returned to their original positions. Baseboards, walls, stair risers, furniture, and equipment shall not be splashed, disfigured, or damaged during these operations. All tools and equipment shall be neatly stored in assigned storage areas. All waxed surfaces must be maintained to provide safe anti-slip walking conditions.

3.1.2 Sweeping and Damp Mopping

After sweeping and damp mopping operations, all floors shall be clean and free of dirt streaks. No dirt shall remain in corners, behind doors, or on stair landing treads. Entrances and assigned areas shall be swept clean of all dirt and trash.

No dirt, trash, or foreign matter shall remain under desks, tables, or chairs.

3.1.3 Wet Mopping and Scrubbing

Floors shall be thoroughly swept to remove visible dirt and debris. Gum, tar, and similar substances shall be removed from the floor surface. After mopping and scrubbing, floors shall be clean and free of dirt, water streaks, mop marks, and strings; properly rinsed; and dry-mopped to provide a uniformly clean appearance. All surfaces, corners, and cracks must be dry and clean. When scrubbing is required, it shall be performed by machine or hand brush.

3.1.4 Sweeping (General Requirement)

Floors shall be swept thoroughly. All gum and adhesive materials shall be removed.

3.1.5 Miscellaneous (As Applicable)

Carpet: After each vacuuming, carpet shall be clean and free from dust balls, dirt, and debris.

Ceramic Tile Flooring (Restrooms): Step 1 – Vacuum entire floor. Step 2 – Mop using COR approved solution.

Toilets (Floor Area): Special attention shall be given to floors and walls around urinals and commodes to eliminate odors and provide a uniformly clean appearance.

Drinking Fountains: Clean and sanitize nozzles, drain plates, and excess-flow receptors. Remove all standing liquid.

Surfaces must be free of stains, trash, ink, coffee grounds, and encrustations.

Outside Entrance Area: Large trash cans shall be emptied at least twice per month or as needed. Trash shall be disposed of in the provided dumpster.

3.2 Dusting

3.2.1 General

Dust shall be removed directly from the surfaces on which it lays, using treated dust cloths, dusting tools, or vacuum attachments as appropriate. After completion of dusting tasks:

• No dust streaks shall remain.

• Corners, crevices, molding, and ledges shall be free of dust.

• No oils, spots, or smudges caused by dusting tools shall remain.

3.3 Damp Washing

3.3.1 General

Damp washing consists of using a clean damp cloth or sponge to remove all dirt, spots, streaks, and smudges from walls, glass, and other designated surfaces. Surfaces shall then be dried to provide a polished appearance. The cleaning solution shall include an appropriate cleaning agent. When damp washing in toilet areas, a multi-purpose disinfectant-deodorizer solution shall be used.

3.4 Bright Metal Polishing

3.4.1 General

Bright metal polishing may be performed by damp-wiping with a suitable cloth if a polished appearance is achieved. If damp-wiping does not achieve the required level of polish, the Contractor shall contact the COR for direction regarding approved metal polish products.

3.5 Glass Cleaning

3.5.1 General

All glass shall be clean and free of dirt, grime, streaks, excessive moisture, and cloudiness after each cleaning operation.

Window sashes, sills, and surrounding woodwork shall be wiped free of drips and watermarks.

Cleaners shall use protective pads to avoid damage to window sills when standing on or placing materials on them.

Windows requiring cleaning on both sides shall have both inside and outside surfaces cleaned on the same day.

3.6 Porcelain Ware Cleaning

3.6.1 General

Porcelain fixtures (washbasins, urinals, toilets, etc.) shall be clean and bright, free of dust, spots, stains, rust, mold, encrustation, or moisture.

Walls and floors adjacent to fixtures shall be free of spots, drips, and watermarks.

3.7 Spot Cleaning

3.7.1 General

Spot cleaning shall remove smudges, marks, and spots from designated surfaces without causing discoloration or damage.

3.8 Toilet Cleaning and Servicing

3.8.1 General

Toilet cleaning shall include the following tasks:

• Empty trash receptacles and replace plastic liners

• Sweep all floors

• Damp wipe towel dispensers, trash receptacles, mirrors, and doors

• Clean washbasins, water closets, showers, and urinals

• Mop all floor areas with a pine-oil-type disinfectant

• Check and replenish towels, toilet tissue, and soap

• Spot wipe wall surfaces and partitions during each scheduled service

• Wash toilet seats and check under lips of bowls and urinals for scale deposits

• Clean thoroughly using approved solutions Dilution of liquid hand soap is not permitted.

3.8.2 Grout Cleaning

Tile grout on floors and walls shall be scrubbed (mechanically or by hand) to remove buildup.

Cleaning solutions used shall be COR-approved.

3.8.3 High-Touch Surface Disinfection

Door handles, partition handles, and light switches shall be cleaned and disinfected during each scheduled service.

Walls and partitions shall be spot cleaned during each scheduled service to remove smudges and graffiti.

3.8.4 Restroom Supplies

The Contractor shall ensure all restrooms remain fully stocked with Government-furnished supplies, including toilet tissue, paper towels, and hand soap.

Supplies shall be stored in designated areas.

Extra paper products may only be left out if authorized by the COR.

3.9 Miscellaneous Tasks

3.9.1 Equipment Maintenance

Contractor shall ensure that vacuum cleaners, buffers, and related equipment are kept in proper working order.

Wet mop heads shall be replaced every three months.

Wet mop heads shall be washed and hung to dry during each scheduled service using the designated outdoor facilities.

3.9.2 Waste Baskets

Waste baskets shall be emptied and wiped clean as needed, no fewer than two times per week.

3.9.3 Dumpster Area Maintenance

Outside trash dumpster doors shall be closed after use.

Any debris dropped between the building and dumpsters shall be collected by Contractor personnel.

3.10 Bio Based Requirements

This procurement requires the use of biobased products to the extent that such products are reasonably available, meet agency or relevant industry performance standards, and are reasonably priced.

Federal Acquisition Regulation (FAR) 52.223-2 requires Contractors to report the purchase of biobased products under service and construction contracts during the previous Government fiscal year (October 1 thru September 30) and to submit this report no later than:

1. October 31 of each year during contract performance; and

2. At the end of contract performance.

Information about this requirement is available at https://www.biopreferred.gov/BioPreferred/

With the initial proposal, the Contractor shall submit a list of biobased products, indicating the name of the manufacturer, cost of each material, and the intended use of each of the materials that are to be used in carrying out the requirements of this contract. Within thirty (30) days of contract award, the Contractor shall provide a complete list of biobased products that it intends to use or supply during the performance of this contract, including products used or supplied by subcontractors. This list should include the product manufacturer and estimated quantities to be used. The list shall be approved by the Contracting Officer Representative.

4.0 Government Furnished

4.1 The Government Will Furnish:

• Restroom paper products

• Hand soap

• Trash can liners

4.2 Contractor Furnished Supplies And Equipment

The Contractor shall provide all additional necessary supplies needed for the performance of the work of this contract in a timely manner. Lack of Contractor furnished supplies or materials shall not be considered an acceptable cause for nonperformance of this contract. The Contractor shall be responsible for ordering, determining inventory levels, processing receipts, storing materials, etc.

The Contractor shall furnish all additional necessary cleaning equipment including, floor scrubbing machines or equipment; vacuum cleaners equipped with High Efficiency Particulate Air (HEPA) filters; and all other equipment that may be needed for the performance of work under this contract. Such equipment shall be of the size, type, and condition customarily used in this work, shall conform to all applicable safety codes, and shall meet the approval of the COR. All equipment must be properly guarded and meet all applicable OSHA standards. Floor machines should be equipped with active vacuum attachments to capture fine particles. Filters should be replaced as necessary and in accordance with manufacturer’s directions. The Contractor shall immediately stop using equipment that needs repair. Repairs or replacement of damaged equipment must be made within 48 hours. Equipment will be used only for its intended purpose.

Contractor shall never use any equipment that has not been approved by the COR, in need of repair, or unsafe.

5.0 Deliverables / Schedule

Key Deliverables

FRANCIS MARION RANGER DISTRICT OFFICE

ADMINISTRATION BUILDING AND ENTRY WAY AT FRONT ENTRANCE

Sweep floors 2 x per week Mop floors 2 x per week Vacuum carpet 2 x per week Shampoo carpet 2 x per year Clean walk-off mats 2 x per week Trash collection/removal 2 x per week

RESTROOMS (All tasks/services) Resupply restrooms 2 x per week

• Clean walls/partitions 2 x per week

• Sweep/damp mop floors 2 x per week

• Clean/disinfect restrooms 2 x per week

• Descale toilets & urinals 2 x per week

• Remove trash 2 x per week

DRINKING FOUNTAINS

• Clean drinking fountains 2 x per week

KITCHEN (All tasks/services) Kitchen floors 2 x per week Tables and chairs 2 x per week Sink 2 x per week Microwave 2 x per week Countertops and other horizontal surfaces 2 x per week

CONFERENCE ROOMS

Disinfect table tops 2 x per week Dust surfaces, displays, and counters 2 x per week

FRONT ENTRANCE (outside) Empty trash cans, replace liners, and remove litter/debris 2 x per week

MONTHLY CLEANING

• Clean interior windows 1 x per month (12 scheduled monthly cleanings and up to 3 additional authorized by the COR)

Vertical surfaces of office furniture, including desks, tables, chairs, file cabinets etc 1 x per month

High dusting of air vents, tops of doors, doorframes, ceiling corners, and edge, window blinds etc 1 x per month

Wipe clean all telephone receivers and dust the bases 1 x per month Polish office furniture, desks, shelves with furniture polish/cleaner 1 x per month

6.0 Travel

It is the responsibility of the contractor to provide all transportation. All travel-related expenses are the responsibility of the contractor and should be reflected in the cost of services.

7.0 Contractor’s Key Personnel

The Contractor shall provide a list of qualified employee(s) authorized to work under this contract. The list shall be submitted 2 weeks before work to begin and must be approved prior to employee(s) working unescorted within Government facilities. Each employee shall have Contractor provided background check on file.

The Contractor shall ensure adequate supervision of janitorial personnel to prevent employees from disturbing papers on desks, opening drawers or cabinets, or using Government telephones or computers. Children shall not be brought onto the premises while work is being performed.

The Contractor must maintain sufficient personnel to provide backup coverage in cases of personal emergencies or inclement weather. The names of these backup personnel, along with confirmation of background checks, shall be provided to the Government.

1) The contractor is to make their own review of contract requirement as specified in SOW document and appropriate for job site conditions. The contractor is responsible for all work included in SOW document. The Forest Service will not be responsible in any way to the contractor’s staff for damage, destruction or loss to the contractor’s equipment, supplies, materials or tools or the personal property of the staff.

2) The contractor will be responsible for all repairs, regardless of cost, resulting from the negligence of the contractor or the contractor’s employees.

3) The contractor’s staff are to be polite and assist the public with general information as much as possible while representing the Forest Service in a professional manner. Contractor staff should not wear clothing that is political or offensive in nature.

4) The Forest Service reserves the right to require the contractor to replace any employee deemed unqualified, displaying unfavorable personal conduct or appearance and or making a bad reflection of the Forest Service to the public.

5) The contractor shall provide qualified staff to always satisfy the contract requirements. All employees/staff must pass Contractor provided background check

6) The contractor shall provide operations supervisor for supervision of employees. The supervisor shall be available by telephone for immediate contact. The supervisor shall have the authority to take immediate action to correct conditions determined by the Contracting Officer or COR to be unsafe, unsanitary, or unsatisfactory. The supervisor shall be located within 2 hours’ travel time to the area and will be required to follow up on public complaints and/or problems with staff.

7) When the Contracting Officer (CO) or Contracting Officer’s representative (COR) observes, the contractor has failed to adequately perform any of the services for which the contractor is responsible, the CO or a designee will take the following action:

a) When services are not provided in accordance with the contract, the contractor’s operations supervisor will be notified and directed to correct services within 24 hours

b) An inspection of non-compliance items will be made after 24 hours by the Contracting Officer or COR. The contractor’s operation supervisor may request to attend the inspection. If the inspection shows the issues have been corrected or satisfactory progress has been made, the notice will be rescinded, however if non-compliance remains the supervisor will be given notification of non-compliance in writing.

c) If the contractor fails to correct the work, the CO may proceed to have the work performed by other forces. The cost of the work performed including materials, labor, and equipment will be deducted from payment due to the contractor on their contract

8.0 Attachment 1 – Floor Plan

Attachment 1 - Floor Plan

Project
General Information
1.0 Scope of Work
2.0 Background
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Government Furnished
5.0 Deliverables / Schedule
6.0 Travel
7.0 Contractor’s Key Personnel
8.0 Attachment 1 – Floor Plan

File details come from the government source that posted it. Updated .